HomeMy WebLinkAboutSUB201900049 Review Comments Road Plan and Comps. 2019-05-03COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Road Plan review
Project: UVA Research Park Loop Road — Road Plans
Plan preparer: Jonathan Showalter, Timmons Group f onathan.showalter(a timmons.com]
608 Preston Ave., Suite 200 / Charlottesville, VA 22903
Owner or rep.: University of Virginia Foundation / P.O. Box 400218
Charlottesville, VA 22904 [tmarshall@uvafoundation.com]
Plan received date: 25 Mar 2019
Date of comments: 3 May 2019
Reviewer: John Anderson
SUB201900049
1. Rev. C0.0 Note reading There are no critical slopes located within the project to read, `No steep slopes are
affected by this project,' if that is the case. Preserved and managed steep slopes exist on this parcel, which
is in the development area, and should be shown on CO.1.
2. Show managed steep slopes, C2.0. Ref. county GIS.
3. Recommend ref. WP0201900021, UVA Research Park Loop Road VSMP Plan, on C0.0.
4. Include public road acceptance procedure on C1.0. Link:
hqp://www.albemarle.or¢Lupload/ima2es/forms_center/departments/Community Development/forms/Engineering and
_WPO_Forms/Road _ Inspections_& Acceptance- Public Road Acceptance _Procedure _07-26-2012.pdf
5. Include VDOT IS-1 (Inlet shaping) detail on C1.1.
6. Include VDOT PB-1 (Pipe bedding) detail on C1.1
7. Provide pavement design per VDOT 2018 Pavement Design Guide for Subdivision and Secondary Roads in
Virginia (link:
htW://www.virainiadot.ora/business/resources/Materials/Pavement_Desian Guide_ for Subdivision_ and Se
condga Roads.pdf ).
8. Provide pavement section with base stone, base asphalt and asphalt surface depth (dimension) labeled.
9. Provide, show, and label VDOT standard barricades at turnout locations on west side of loop road (points
of future connection /Encompass). A barricade is not required at 90-deg right angle in road, but at
Encompass southern /northern entrances where proposed grades slope away. If these turnouts will not
receive roadway extension within 12 months, provide GR-2 to limit damage or injury that may reasonably
attend a loss of control incident at either location. Please provide barricade and GR-2 typ. details.
10. Ensure SWM-related details (trash rack for SWM drainage structures and Contech ® Jellyfish Filter), C1.2,
appear with WP0201900021 VSMP /WPO plans, as well.
C2.0
11. Recommend provide label ref. to SUB201800171, Lewis and Clark Drive Road Ext. RP, similar to label
ref. to UVA Research Park Sewer Extension project.
12. Recommend increase text pitch of relevant labels too small to read with ease.
Engineering Review Comments
Page 2 of 4
Jk-
A, d EAS
\ . ,YAT RLI
•. 34,5-46+ PL�7\ _
-_-��-
-
\\ C
7AX MA� 03206�00-00\0)9gRO
`
\
.
UNIVER$1TY OF Y GINII FOUNPATidiT,
` , `-r `
0\
\
�
5,�bB 2-32r6� �
`
DB 29 9-222, 243 & 244) \
�rara riff
}y} y
tiff r*i� I
REMOVEg NECESSARY (TYP.
rlrypl rparl}/}l}ll}{ ;ra
f/rre+lrl. ry}lr
■ltr,/}l}alrl}/} n
}r}1irs�}r}f�ea}/�,a���fin*ir
r-rp}►'+�F�}riin*irras���tiiaiyF�1
,� i rsrf
bra}fya!fyr} r}f}f}fr
�l}lrl}►va}a} }a}arr}r�}nlrlllrrT
■}■yrl}/yw�arl}yl}�ii�rlaa�*ii�*��
ralrlrlyl}r+���l}a rl}fa
r} 1K ff�rfy�RS�g53ii•/rarR�A*y�iSfR
f}a}1}
R�yj}f}r}/�wfz�lllrf7r+F�y�l}l
�*�s}ll/rflirflr/ rF\����yl }RED
lrl} ■}fyrlflr}fl riff
•}��fl}f}r} rMr/l/}/lr ��r}alrra�wf l�lfllrl
R��r*lsr*fir}RSA*yMtl% Kw�flwrfR{rti¢i�r
flf�lrl r}}�l}y }l}yl} flril �• V
PROPEOX LINE • if 1R*y1Fuf��rtisiARiisF�i}R��*R •
fR/
VACATEDBE
•Ry��*s����ii1�*ft�irgR�+*Fr}Rrr
*�*i�R*lea}1f��r�wflR�y�rf}r} -
13EPLACIE'It4LET TOP
lylrlfl}yF�■1l}/ar}■f
�fr�*fR�llyR�ftF���liyfl� �
�.-
yr}�lfR
i
13. Align CG-12 ramps at Int. Loop Drive and Innovation Drive. Eliminate skew. Ramps and crosswalk
should be in line with one another at this location.
14. Provide street name sign, even if unnamed, or name pending.
15. Provide complete horizontaldata . plan • radius of
Engineering Review Comments
Page 3 of 4
16. Provide speed limit signs.
17. Please clarify `Future private R/W (Typ.)' label. Is Loop Road a proposed private street? If so, private
streets may not intersect a public road at more than one location. If this is a loop road, it will likely
intersect Lewis and Clark Drive (public road) at more than one location, and must itself be a public road.
18. If Loop Road is a proposed private street, please ref. Ch. 14 for private street request procedure.
19. C4.0 /C4.1: Recommend `Ped-crossing Ahead' signs for Loop Road in advance of crosswalks.
20. Recommend caution sign on Loop Road prior to Innovation /Lewis and Clark that notifies `Emergency Fire
/Rescue Entrance Ahead.'
C5.0:
21. Show proposed SWM Facility / Access /Drainage Easements.
22. Provide curb break /mountable curb to provide SWM Facility Access (ACDSM, pg. 12). Provide access
label or note on plan and linework with proposed grading that meets ACDSM standard, text image, below,
for dry pond Access:
Best Management Practices for Stormwater Management: All practices must have
adequate vehicle access; 10' width graded at less than 20%. Anything over 20% must be
surfaced with gravel or pavement. Access must be to all structures and forebay cleanout
areas. Easements must be provided over all access and facilities, to accompany deeds and
agreements as available on the county website;
http://www.albemarle.orv-/deptforms.asp?department--cdenizwno
23. Provide typ. detail, transition from CG-6 to mountable (rolltop) curb at point of SWM facility access.
C4.1
24. The same line is labeled 67' wide R/W and Future Private R/W. Please see item 17. Clarify.
25. Provide `No Parking' signs at regular intervals, since no on -street parking.
26. 10' wide utility corridor may be sufficient to install utilities if water /sewer are located within roadway
prism, as proposed, but wider utility corridor/s may be required if VDOT policy requires san./water utility
lines to relocate outside the roadway prism. Note, for example, ACSA minimum horizontal separation for
water and sanitary sewer facilities.
27. Provide plan note outlining sequence of removal for Ex. septic field, and that references any VDH permit
number, or permit requirements that may guide construction in vicinity of area marked `Approximate
Location of Ex. septic Field per plans...'
28. C4.2 shows proposed 8" PVC (SSWR) passing beneath multiple storm pipes. Please consider recent
VDOT Culpeper bridge and drainage guidance concerning utilities placed over or under structures to be
maintained by VDOT, and coordinate with VDOT to revise design as needed.
29. C4.3 shows proposed 8" water line passing beneath multiple storm pipes. Please consider recent VDOT
Culpeper District guidance concerning utilities placed over or under structures to be maintained by VDOT,
and coordinate with VDOT to revise design as needed.
C5.0:
30. Ensure dry pond design details on RP match design details on WPO201900021, or preferably limit design
detail provided for dry pond on the Road Plan to conceptual outline, with ref. to WP0201900021.
31. Label or delete blue circle lines
Engineering Review Comments
Page 4 of 4
"3
112 -:
i 1 NF
_ 117RGlNIA FQU..
74387C4f.5
32. Provide spot elevations and labels that ensure positive drainage in vicinity of right angle turn in road, to
ensure westbound /entrance storm runoff on Loop Road reaches Sir. 104.
33. Revise inlet location or lengths since spread (T) > 8-ft at Str. 122, 212.
34. C5.3: Provide cross drains per road plan checklist for reviewers, pg. 4 (`locations shown and labeled
with VDOT designations (CD-1,2) at every major cut and fill transition or sag curve'). Design
appears to require eight (8) cross -drains (2 sag curves, 6 cut/fill transitions).
35. C6.0, C6.1: Remove from Road Plan. Include with VSMP /WPO Plan. Review comments for these plan
sheets will be included with WPO plan review comments.
C7.0
36. Provide 95% compaction note for area of fill at Str. 112, profile Str 112 — Str 100.
37. Provide profile, Str. 114 — 112.
38. VSMP Plan and Road Plan Design Calculations & Narrative, 3/25/19:
a. SWM Quantity Narrative —Include information highlighting (via prior -approved table, graphic,
narrative, zoning, site, or WPO data) how eastern side of project drains to a large wet pond that
was designed to handle stormwater quantity for the full build out of the research park.
Recommend information identical to Timmons Group Lewis and Clark Drive Road Extension
VSMP Plan and Road Plan Design Calculations & Narrative booklet, d. 3/25/19, pg. 18-19.
b. LD-204
i. Revise at Str. 122, 212.
ii. Check eight of curb opening (typ. 5.5" or 0.46')
iii. Check d/h. Anticipate values < 1.0.
c. SWM routing comments will be included with WP0201900021 plan review comments.
Ifyou have questions, please contact me atjanderson2(&albemarle.org or at 434.296-5832-0069.
Thank you for your help and patience.
J. Anderson
SUB201900049 UVA Research Park Loop Rd RP 050319