From: Dyon Vega <DVega@rivanna.org>
Sent: Thursday, April 25, 2019 3:41 PM
To: Christopher Perez
Cc: vfort@rivanna.org; Richard Nelson
Subject: Comments for Georgetown Hydraulic
Attachments: RWSA General Notes.doc
Christopher,
RWSA has reviewed the Site Plan for Georgetown Hydraulic as prepared by Roudabush, Gale & Associates, Inc and dated
03/07/2019 and has the following comments:
General Comments:
1. RWSA requests a permanent 20' easement along the eastern boundary of the property for the existing RWSA
12" water line. The easement should extend 10' on either side of the pipe centerline or to the VDOT right-of-way
line, whichever is closer. Show the proposed easement on plan sheets 3-5.
2. RWSA is concerned about the proximity of the footers of the building to the water line. Additional information
on the type and depth of the building footers will be needed in order to determine the extent of impacts on the
RWSA water line (see Sheet 3 comment, below).
Sheet 1:
1. Include the RWSA General Notes this sheet (see attached).
Sheet 3:
1. RWSA is concerned about the proximity of the footers of the building to the water line. Additional information
on the type and depth of the building footers will be needed in order to determine the extent of impacts, on the
RWSA water line (see General Comments, above).
Sheet 5:
1. Please show and label the location of the 12" RWSA water main on this plan sheet.
2. Please move the proposed trees so there is a minimum of 10' of separation from the centerline of the 12" RWSA
water line.
Please let me know if you have any questions.
Dyon Vega