HomeMy WebLinkAboutSDP201900014 Review Comments Appeal to BOS 2019-05-08COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
(434) 296-5832
May 8, 2019
Riki Van-Niekerk
Roudabush Gale & Assoc. Inc
172 South Pantops Drive
Charlottesville VA 22911
SDP201900014 Georgetown Hydraulic Professional Offices - Initial Site Plan
Mr. Van-Niekerk:
The Site Review Committee has reviewed the development proposal referenced above. Initial comments
for the following divisions of the Department of Community Development and other agencies, as
applicable, are attached:
Albemarle County Planning Services
Albemarle County Department of Fire Rescue
Albemarle County Engineering Services
Albemarle County Building Inspections
Albemarle County Information Services (E911)
Albemarle County Service Authority (ACSA)
Architectural Review Board (ARB)
Rivanna Water and Sewer Authority (RWSA)
Virginia Department of Transportation (VDOT) [Comments pending, to be forwarded once received]
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered final. However, the Site Review Committee has attempted to identify all issues that will
be required to be resolved prior to Final Site Plan approval. The lead reviewer will either approve with
conditions or deny the initial site plan within 15 days of the site review meeting.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely,
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Memorandum
To: Riki Van-Niekerk
From: Christopher Perez, Senior Planner
Division: Planning
Date: May 8, 2019
Subject: SDP201900014 Georgetown Hydraulic Professional Offices - Initial Site Plan
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following
comments have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by
the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any
further review/action of the plan.
2. [ZMA2006-14 COD 20A.41 Proposed Use. The square footage for the office use goes beyond the allowable square
footage approved with the rezoning. The project is limited to 9,516 net SF of office space. Currently the plan lists
10,840 net SF of office space. Revise and label the uses in the building and provide their square footages; Office 9,516
SF, Common/lobby 3,808 SF, and Basement storage 3,491SF.
[ZMA2006-14 COD 20A.5.i] Setbacks. Visually depict setback lines for the development. Also, revise the setbacks
listed on the cover sheet as follows:
Front setbacks from the building corners: 9.6' & 13.47'
Front setbacks from center of the building: 21.9'
Building setbacks from the RA zoning: 47.5'
20' undisturbed buffer to adjacent RA zoning and R-6 zoning
4. [31.7(c), ZMA2006-14 General Development Plan] Buffer zone adjacent to residential and rural areas districts. No
construction activity including grading or clearing of vegetation shall occur closer than twenty (20) feet to any
residential or rural areas district. Remove all proposed improvements and land disturbance from the 20' undisturbed
buffer adjacent to the RA zoned parcel (TMP 60-76B). Currently the plans propose grading and limits of disturbance in
this area, presumably to build the retaining wall; however, neither are permitted in the buffer.
5. [ZMA2006-14 COD 20A.5.i(5)] Maximum Building Height. Revise the maximum building height information as
follows: 2 stories, 50' (measured at the front facade) and 3 stories, 60' (measured at the back to include basement).
6. [ZMA2006-14 COD 20A.3.b] Parking and Loading. The site is over the maximum 51 parking spaces approved with
the rezoning. Ensure the parking is revised to provide 48 spaces for the office use and 3 designated for the adjacent
property. Label the spaces for the adjacent property.
7. [4.12] Parking. Omit the double stacked parking, as this is not permissible.
8. [ZMA2006-14 COD 20A.5.d] Amenities. Provide the required 14' wide concrete sidewalks along the front of the site
as depicted in the general development plan.
9. [ZMA2006-14 COD 20A.5.d] Amenities. Provide a sidewalk connection from the parking area to the sidewalk at the
front of the site.
10. [ZMA2006-14 Proffer 11 Depict and label the location of the required 5-bike bicycle rack. Installation of the bicycle
rack shall be completed prior to CO for the building.
11. [ZMA2006-14 Proffer 21 Depict, label, and dimension the required bus shelter. Construction shall be completed prior
to the issuance of the CO for the building.
12. [ZMA2006-14] Proffers. On the final site plan clearly list the proffers.
13. [ZMA2006-14 COD 20A.5.d, 20A.9] Amenities. On the plan depict and label the two required picnic tables and
benches.
14. [ZMA2006-14 General Development Plan] Landscaping. Revise the landscape plan as follows:
- Replace the five (5) viburnum x rhytidophylloides plantings at the southeastern portion of the building with six (6)
7-8' tall Ilex x Patriots.
- Add two (2) 7-8' tall crepe myrtle multi stemmed plantings at the southeastern portion of the building
- Replace the thirty seven (36) green boxwoods shrubs along the northern property line with a row of 4-5' tall
viburnum x pragense to fill this area.
-Provide the following note on the landscape plan: `Female gender ginko trees will not be used"
15. [ZMA2006-14 COD 20A.3.b, 4.12.191 Parking and Loading. Provide the required dumpster, dumpster pad, and
screening pursuant to the standards found in Section 4.12.19.
16. [Comment] The northern most retaining wall appears to cross the property line into TMP 60E-1. Additionally, there is
a sewer connection proposed on TMP 60E-1. Prior to final site plan approval offsite easements for these improvements
shall be secured. On the final site plan label and depict the easements and provide their recordation information.
17. [32.5.21 General Information. The TMP listed on the cover sheet is incorrect. The true TMP is 060F0-00-00-00300.
Revise.
18. [32.5.21 General Information. The C-1 zoning listed on the cover sheet is incorrect. The zoning of this parcel is NMD.
Revise.
19. [32.5.2] General Information. On the plans provide the following note: "This parcel is subject to ZMA2006-14 with
associated proffers and Code of Development. "
20. [32.5.2(d)] Topography. Clearly depict and label all critical slopes onsite.
21. [32.5.1(c)] Dimensions. Throughout the plan dimension all proposed improvements.
22. [32.7.2.11 Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required
by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the site shall be
required prior to final site plan approval.
Fire and Rescue — Shawn Maddox
1. If the building height will exceed 30' then the travel way must be expanded to 26' of clear travel width.
2. An approved emergency apparatus turn around, or a second entrance/exit, is required due to the travel distance exceeding
150'.
3. A hydrant must be provided in the vicinity of the entrance due to the 500' spacing not being met in that area.
4. If the building is to be sprinklered then the FDC must be shown on the plan and a hydrant located within 100' of the
FDC.
5. A knox box will be required. A note can be added indicating this requirement and that the location can be coordinated
with the fire marshal's office.
6. A fire flow test will be required before final acceptance.
Engineering —Matthew Wentland
1. The VSMP plans will need to be approved before final site plan approval.
2. Revise the max height labels on the retaining walls to the actual max height.
3. Provide guardrail/vehicle barrier between the parking and the retaining walls. It appears the top of the walls is higher
than the finished grade at the parking lot. If the wall is being used as a vehicle barrier, provide plans and verification from
the wall engineer.
4. Engineering recommends obtaining a temporary easement from the northern neighbor for construction of the retaining
wall.
Building Inspections — Mike Dellinger
Add the following notes to the general notes page: "Retaining walls greater than 3 feet in height require a separate
building permit. Walls exceeding 4 feet in height require an stamped engineered design also. " `Accessible parking spaces
and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the same level as the parking
space they serve. "
E911—Andrew Slack
No objection
ACSA — Richard Nelson
1. Provide fixture counts.
2. Accurately show ACSA water main.
3. Confirm if there will be fire suppression.
4. Confirm if a fire hydrant will be required on site.
ARB - Margaret Maliszewski
Motion: Mr. Stoner moved to approve the consent agenda and forward the recommendations outlined in the staff report for
the Initial Site Plan to the Agent for the Site Review Committee, as follows.
• Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended
conditions of initial plan approval:
1. Prior to Initial Plan approval, the following items shall be resolved to the satisfaction of the ARB: None. Note that
a Certificate of Appropriateness is required prior to final site plan approval.
• Regarding recommendations on the plan as it relates to the guidelines: None.
• Regarding conditions to be satisfied prior to issuance of a grading permit:
1. Provide sufficient tree protection fencing around those trees to be preserved and clearly differentiate between trees to
be removed and those to be retained on Sheet 2 of the site plan set.
• Regarding the final site plan submittal:
1. Architecture and landscaping will be reviewed with a future submittal. A Certificate of Appropriateness is required
prior to final site plan approval.
2. Submit material and color samples, dimensioned elevations, and floor plans of the apartment buildings forreview.
3. Provide the standard window glass note to the architectural drawings: Window glass in the Entrance Corridors
should meet the following criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light
reflectance (VLR) shall not exceed 30%.
4. If a refuse area is proposed, show it on the site plan and include details of the dumpster enclosure in the site plan.
5. Substitute evergreen trees with a height over 10' at maturity for the 5 viburnums presently proposed on the
southeast corner and the 3 viburnums presently proposed on the northeast corner of the building.
6. Provide the top- and bottom -of -wall heights for the retaining walls surrounding the proposed ground -mounted
HVAC units in the southeast and northeast corners of the building. Provide material samples for the retaining
walls and provide a detail of the walls on the site plan set.
7. Relocate the landscape island at the western edge of the parking area away from the stormwater outlet.
8. Include the mechanical equipment note on the site plan set and architectural drawings: Visibility of all mechanical
equipment from the Entrance Corridor shall be eliminated.
9. Provide a lighting plan for review that includes a photometric plan, a luminaire schedule, and manufacturer's cut
sheets for all proposed wall -mounted and freestanding fixtures.
10. Revise the plan to provide the standard lighting note: Each outdoor luminaire equipped with a lamp that emits
3, 000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away
from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto
public roads and property in residential or rural areas zoning districts shall not exceed one halffootcandle.
11. Ensure that no proposed tree conflicts with an existing or proposed utility or its easement and that large shade trees
are placed a minimum of 7 feet from the center of a utility line. If trees are placed in easements, provide
documentation from the easement holders that the vegetation is permissible.
12. Revise the site plan set to show all utilities and easements consistently throughout the site plan set.
13. Provide a note that the ginkgoes planted will not be female.
14. Provide four trees in the parking area at a minimum of 2.5" caliper. Update the plant schedule on Sheet 5 to reflect
this change.
15. Consider substituting locally native species for the non-native plants proposed.
16. Provide at least two more evergreen shrub species so that no one species of shrub proposed exceeds, in number,
one -quarter of the total number of shrubs proposed.
17. Rectify errors in the plant schedule on Sheet 5.
18. Provide all site elements required by the Proffers and Code of Development approved with ZMA-2016-14,
including a widened sidewalk; an entry plaza with picnic tables; a bicycle rack; and a bus shelter. Show these site
elements on the site plan.
19. Provide additional vegetation on the retaining walls in the southwest and northwest corners of the parking area.
20. Provide details of the proposed retaining walls in the site plan set and submit material and color samples for
review. Retaining walls over six feet must be terraced and landscaped.
21. Provide sufficient tree protection fencing around those trees to be preserved and clearly differentiate between trees
to be removed and those to be retained on Sheet 2 of the site plan set.
Mr. Van Der Werf seconded the motion.
The motion carried by a vote of 4:0. (Hancock Absent)
RWSA — Dyon Vega
See attached.
VDOT Adam Moore
Comments pending, to be forwarded once received.
Sincerely,
A"'�
Christopher Perez
Senior Planner, Planning Division
Christopher Perez
From: Dyon Vega <DVega@rivanna.org>
Sent: Thursday, April 25, 2019 3:41 PM
To: Christopher Perez
Cc: vfort@rivanna.org; Richard Nelson
Subject: Comments for Georgetown Hydraulic
Attachments: RWSA General Notes.doc
Christopher,
RWSA has reviewed the Site Plan for Georgetown Hydraulic as prepared by Roudabush, Gale & Associates, Inc and dated
03/07/2019 and has the following comments:
General Comments:
1. RWSA requests a permanent 20' easement along the eastern boundary of the property for the existing RWSA
12" water line. The easement should extend 10' on either side of the pipe centerline or to the VDOT right-of-way
line, whichever is closer. Show the proposed easement on plan sheets 3-5.
2. RWSA is concerned about the proximity of the footers of the building to the water line. Additional information
on the type and depth of the building footers will be needed in order to determine the extent of impacts on the
RWSA water line (see Sheet 3 comment, below).
Sheet 1:
1. Include the RWSA General Notes this sheet (see attached).
Sheet 3:
1. RWSA is concerned about the proximity of the footers of the building to the water line. Additional information
on the type and depth of the building footers will be needed in order to determine the extent of impacts, on the
RWSA water line (see General Comments, above).
Sheet 5:
1. Please show and label the location of the 12" RWSA water main on this plan sheet.
2. Please move the proposed trees so there is a minimum of 10' of separation from the centerline of the 12" RWSA
water line.
Please let me know if you have any questions.
Dyon Vega
Civil Engineer
RIVANINA
WATER I SEWER AUTHONTY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.or�
Rivanna Water & Sewer Authority (RWSA)
General Water & Sanitary Sewer Notes
Last Revised: April 2016
1. All materials and methods of construction shall comply with the latest version of the General
Water and Sewer Design and Construction Standards — Version 1.0, adopted in December 2015,
except as modified below or modified in special notes.
2. RWSA shall approve all construction materials and methods of construction. A preconstruction
conference shall be held with RWSA prior to the start of any work.
3. The contractor shall be responsible for notifying Miss Utility (1-800-552-7001).
4. RWSA Engineer (Victoria Fort at (434) 977-2970 ext. 205) shall be notified three business days
prior to the start of construction.
5. All work is subject to inspection by RWSA staff. No tie-ins to the existing system shall be made
without coordination with and the presence of RWSA staff. No work shall be conducted on
RWSA facilities on weekends or holidays without special written permission from RWSA.
6. For sanitary sewer line construction: RWSA may require bypass pumping for tie-ins to the
existing system. All doghouse manholes must be pressure -tested before a connection is made to
the system.
7. The location of existing utilities as shown on the plans is from data available at the time of design
and is not necessarily complete or accurate. The Contractor shall be responsible for the
verification of the location, size and depth of all existing utilities, both surface and subsurface.
The Contractor shall immediately notify the Engineer of any discrepancies between the plans and
field conditions. The Contractor shall use due diligence to protect all utilities and structures from
damage at all times, whether shown on the plans or not. Damage to any existing utilities shall be
repaired by the Contractor to the original condition at no additional cost to the Owner.
8. Erosion and sediment control facilities shall not be permitted in the RWSA easement without
special written permission from RWSA. No grading shall be permitted in the RWSA easement
unless permitted otherwise by RWSA in writing.
9. No blasting shall be permitted within 100 feet of RWSA facilities without written permission and
RWSA approval of the blasting plan. Ground monitoring during blasting and a pre -blast survey
may be required. For blasting within 100 feet of any operative RWSA sewerlines, bypass
pumping and/or pre- and post -CCTV may be required. RWSA may also require certification
from a licensed professional engineer stating that the proposed blasting will not damage any
RWSA facilities. Damage to any utilities due to blasting shall be repaired by the Contractor to
the original condition at no additional cost to the Owner.
10. The contractor shall observe minimum separation requirements for utility crossings. When a
crossing is made under an existing facility, adequate structural support shall be provided for the
existing pipe. The area of the crossing shall be backfilled with compacted 57 stone to the
springline of the existing pipe.
11. New water main installations shall be pressure tested, chlorinated, flushed and have water
samples approved prior to making any permanent connection to the public water system.
Approved methods of filling and flushing new water mains will be required to prevent any
contamination of the public water system.
12. All easements for new RWSA facilities shall be recorded prior to placing the new facilities into
service.
13. No permanent structural facilities will be permitted in the RWSA easement. This includes
building overhangs, retaining walls, footers for any structure, drainage structures, etc.
14. Trees are not permitted in the RWSA easement.