Loading...
HomeMy WebLinkAboutARB201700124 Correspondence 2017-11-21 (3)1 Margaret Maliszewski From:Margaret Maliszewski Sent:Tuesday, November 21, 2017 4:55 PM To:'Scott Collins' Subject:RE: Flow Auto Initial Site Plan Scott, Here are the conditions that were outstanding after the February 6, 2017 ARB meeting: 1. Provide elevations at 1/8” scale. Identify all materials and colors on the elevations. 2. Add notes to the plan indicating the range of brick colors proposed and the locations intended for the brick. 3. Provide a guard rail detail, including material and color identification, in the site plan. 4. Revise the plan to coordinate the project limits line and the island with trees located southeast of the proposed building. 5. Increase the size of the IG at the front site wall to 24" high minimum at planting. 6. Continue the shrubs around the northwest corner of the display area. 7. Provide top of wall and bottom of wall elevations for the site walls. 8. Step and provide plants at the 10’ wall on the east side. Thanks. Margaret From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Tuesday, November 14, 2017 12:01 PM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Subject: RE: Flow Auto Initial Site Plan Margaret- Thanks for the email. Yes, its’ the same plan. I do think that I need to submit one final item to ARB, if I am not mistaken, to wrap up ARB approval. If you get a chance, can you forward me any remaining ARB issues that need to be addressed. I want to make sure we wrap them all up, and I will make a final submission to you for ARB approval. Thx. Scott From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent: Tuesday, November 14, 2017 11:59 AM To: Scott Collins <scott@collins-engineering.com> Subject: Flow Auto Initial Site Plan Scott, Can you confirm that the Initial Site Plan recently submitted for Flow Auto is meant to be the same plan last reviewed by the ARB on February 6, 2017? Are there any differences between the plans? Thanks. Margaret 2 Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org