HomeMy WebLinkAboutARB201700124 Review Comments 2017-11-21 Review Commentfor ARB2017001�� |n�»| Site Ian Tl
_
PmjectNamo
FLOW AUTO SDP - INITIAL
Date Completed- Tuesday, November 21. 2O17 Department/Division/Agency, Review Status:
Reviewer- Margaret Maliszewski O C-DARB O .Requested,Changes
O
-_' ^_^
This plan was reviewed bv the ARBin2U1S and early 2O17'Ad its last review un February 6. 2O17. the ARB approved the plan ^
with the following unnd0ona-
1 Provide elevations at 1/8^ sca|e. Identify all matohn|o and colors on the elevations-
2-Add notes to the plan indicating the range of brick colors proposed and the locations intended for the brick.
3. Provide ayuand xo/| detail, including material and color identification, in the site plan.
4. Revise the plan to coordinate the project limits line and the island with trees located southeast of the proposed bui|dinD.
5. |ncmuon the aico of the |G at the front site wall to24~ high minimum at plantmg.
G, Continue the shrubs around the northwest corner n[the display area.
7- Pnov�ido top of wall and bottom nf wall elevations for the site walls.
T Step and pmmdm plants at the 10' wal| on the oast side.
Consequently, no additional AR8 review nf the Initial Site Plan io required at this time- The conditions listed above must bo
addressed before final site plan approval-