HomeMy WebLinkAboutARB201800095 Checklist 2018-08-06 ���oP,� � II
�tili l; Architectural Review Board
�� ; � e
''> Concept Plan/Advisory Review Checklist for Completeness
(8)collated copies of all information unless otherwise indicated.
I set of color/material samples
A. ritten description of the proposal
vide a general description of all proposed work.
Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Sketch plan showing the following (drawn to the scale of 1"=20', clearly legible and folded):
❑ Location(s) of proposed building(s) on the site.
• ❑ Schematic layout of parking, travelways, and other improvements.
❑ Location of existing and proposed tree lines. Individually identify rip
old/
trees of 6-inch caliper or greater.
❑ Existing and proposed topography and conceptual grading drawn with contour intervals of 5-feet or
t'1 . less, and with sufficient offsite topography to describe prominent and pertinent off-site features and
physical characteristics, but in no case less than 50-feet outside of the site.
❑ Sheet number, total number of sheets, date of the drawings, date and description of the latest
revision, and contact information for the firm preparing the drawings in the title block on all drawings.
C. Appearance of the proposed building(s)
how a representation of the appearance of the proposed building(s). This may include architectural
elevations, perspective sketches, or photos of the proposed building(s). These documents should
,provide a basic understanding of:
-The size, form and scale of the building.
The architectural style of the building.
he proposed building materials and color(s).
D. Additional material
Provide labeled, color, 8-'/2" x 11" photographs of the site as seen from both directions on the
Sntrance Corridor.
ignatures
1