ARB201800083 Staff Report 2018-07-16
b. ARB-2018-103: Brookhill Blocks 9, 10 and 11 Initial Plan - Initial Site Development Plan (TM/Parcel 046000000019B4) Proposal: To construct 85 attached townhouses with associated site improvements. Location: On the east side of Rt. 29,approximately 550' south of Ashwood Blvd. • Regarding requirements to satisfy the design guidelines as per§ 18-30.6.4c(2), (3)and (5)and recommended conditions of initial plan approval: o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: • None. Note that a Certificate of Appropriateness is required prior to final site plan approval. • Regarding recommendations on the plan as it relates to the guidelines: o None. • Regarding conditions to be satisfied prior to issuance of a grading permit: o Revise the plans to show adequate tree protection fencing. • Regarding the final site plan submittal: 1. With the final site plan, submit architectural drawings for the residential units in Block 9 for review.The architecture of Blocks 10 and 11 does not require ARB review due to anticipated limited visibility. 2. Provide in the site plan sufficient details to show that all proposed light fixtures meet the requirements of the lighting ordinance. 3. Provide the landscape plan at the same scale as the rest of the site plan set. 4. Revise the site plan to show the 30' Rt. 29 buffer outside of the private lots. 5. Revise the site plan to show the frontage along Rt. 29 out to the street. 6. Include a complete plant schedule in the landscape plan. 7. Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 8. Revise the plans to show adequate tree protection fencing. Mr.Van Der Werf seconded the motion. The motion carried by a vote of 4:0. (Stoner absent) REGULAR REVIEW ITEMS a. ARB-2018-83: Brookhill Blocks 4 and 4A Final - Final Site Plan (TM/Parcels 046000000019A0, 046000000019B1) Proposal: To develop blocks 4A and 4B with nine multi-family apartment buildings, parking areas, and associated improvements. Albemarle County Architectural Review Board Final Action Memo August 20,2018 3 Location: East side of Seminole Trail (Rt. 29 N) and north side of Polo Grounds Road (Rt. 643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. Mr. Stoner arrived at 1:08 p.m. Motion: Mr. Binsted moved for approval of the Certificate of Appropriateness for ARB-2018-83:Brookhill Blocks 4 and 4A Final- Final Site Plan with the following conditions listed in the staff report. 1. Revise the architectural elevations to call out the materials listed in the Elevation Key Notes. Revise the Elevation Key Notes to omit those materials or architectural features that are not proposed for these buildings. 2. Coordinate the dimensions of the trash enclosures between the architectural and site plans.Show the ramp/stair structures on the site plan. Coordinate the ramp/stair structures with proposed landscaping without reducing plant quantities or degree of screening. 3. Consider increasingthe level of detail in the west elevation of BuildingC, Block 4B,consistent with that provided in Building B. 4. Provide the window glass note on the architectural elevations: Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance (VLT)shall not drop below 40%. Visible light reflectance (VLR)shall not exceed 30%. Specifications on the proposed window glass should be submitted with the application for final review. 5. Illustrate electric,gas, telephone and cable utilities on the site plan,or indicate that no such utilities are proposed. 6. Provide the standard mechanical equipment note on the architectural elevations: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 7. Provide total lumens in the luminaire schedule for all proposed lights. 8. Revise the lighting plans to include the illumination output from the proposed light fixtures on the Clubhouse and the Fitness Building in Block 4A. Add the proposed light fixtures graphically to the site plan. Include the light fixtures' specifications in the luminaire schedules. 9. Revise the lighting plan such that no footcandle value exceeds 20 fc. 10. Provide a note on the lighting plan that 18 feet is the maximum mounting height from grade for the pole lights, inclusive of the base. 11. Provide the standard lighting note on the lighting plans (C-704 and C-705). 12. Revise the plan to eliminate conflicts between light poles and trees. 13. Reduce the depth of the planting gap along the western wall of the southwestern building in Block 4B and the beginning of the landscape buffer to 10' by adding trees. 14. Revise the landscape plans on C-701 and C-702 to call out the number and types of shrubbery proposed for Stella Lane and Archer Avenue. Rectify the plant schedules to correspond to the illustration. 15. Revise the plan to resolve all utility/landscape conflicts. 16. Graphically provide the numbers and varieties of shrubs proposed for the foundations of those buildings lining Archer Avenue. Ensure that no proposed shrub exceeds in quantity 25%of the total shrub count. 17. Provide an additional 55 feet of landscape frontage on the west side of the stormwater management facility to the northwest of Block 4B to join the existing treeline or proposed 100' frontage landscape buffer. 18. Rectify the errors and discrepancies in the plant schedules on C-701,C-702, and C-703. 19. Address the discrepancy in the number of Zelkovas illustrated on C-701 and those in the detail of the tree canopy in Block 4B provided on sheet C-703. Albemarle County Architectural Review Board Final Action Memo August 20,2018 4 Mr. Stoner seconded the motion. The motion carried by a vote of 5:0. OTHER BUSINESS a. ARB-2017-05: Oakleigh: Materials/Colors Motion: Mr. Binsted moved for approval of the material and color changes as described by the applicant. Mr. Hancock seconded the motion. The motion carried by a vote of 5:0. b. Entrance Corridor Design Guidelines: Glass The ARB received staffs presentation on the history of Entrance Corridor design guidelines related to glass. It was the consensus of the Board that it would be helpful to review and update individual guidelines if staff time isn't available for an update to the complete guidelines. Mr. Wardell indicated that he would meet with staff to consider a plan for clarifying the guidelines related to the layout of developments containing convenience stores and fuel pump canopies. Next ARB Meeting: Tuesday,September 4, 2018 ADJOURNMENT The meeting was adjourned at 2:00 p.m.to the next ARB meeting on Tuesday,September 4,2018 in Room 241, Second Floor,County Office Building at 1:00 p.m. Albemarle County Architectural Review Board Final Action Memo August 20,2018 5 .1 t <of A it 8 A®ass �'IRGINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville,Virginia 22902-4596 (434) 296-5823 Fax(434) 972-4012 ARB ACTION MEMO Date: July 16, 2018 Time: 1:00 PM Meeting Room: Room 241, Second Floor Members: Frank Stoner: Absent Frank Hancock: Present Bruce Wardell, Chair: Present (Arrived at 1:04 p.m.) Stan Binsted,Vice Chair: Present Dade Van Der Werf: Present Staff: Heather McMahon Margaret Maliszewski Sharon Taylor CALL TO ORDER Mr. Binsted called the meeting to order at 1:03 p.m. and established a quorum. DISCLOSURES Mr. Binsted invited disclosures. There being none,the meeting moved to the next item. PUBLIC COMMENT Mr. Binsted invited public comment. There being none, the meeting proceeded. REGULAR REVIEW ITEMS a. ARB-2018-83: Brookhill Blocks 4A and 4B Final - Final Site Development Plan (046000000019A0, 046000000019B1). Albemarle County Architectural Review Board Final Action Memo July 16,2018 1 Proposal: To develop blocks 4A and 4B with nine multi-family apartment buildings, parking areas, and associated improvements. Location: East side of Seminole Trail(Rt.29 N)and north side of Polo Grounds Road(Rt.643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. The ARB offered the following comments on the proposal: 1. Submit material and color samples for review. 2. Revise the elevation sheets to include a key that illustrates to which building wall on the overall site plan the elevation corresponds. 3. Provide floor plans of each building, by floor, not the individual units. 4. Provide color renderings of Buildings A and B as seen from the entrance of Archer Avenue at Rt. g 29 5. Add plantings as described for 30' within the VDOT right-of-way to screen the stormwater management facility, contingent on VDOT approval. 6. Clarify the metal eyebrow feature and provide a materials and color sample. 7. Include the location of the proposed mail kiosk and any other proposed accessory structure on the site plans (C-301 and C-302). 8. Provide additional evergreen landscaping in the vicinity of the trash compactor on block 4B to eliminate its visibility from the EC. Provide dumpster/compactor screening details in the plan. 9. Provide a roof plan and elevations that show all proposed roof-mounted mechanical equipment. Provide sight line drawings to confirm that the equipment can't be seen from the street. 10. Provide all proposed utilities on the Utility Plan (C-501 and C-502). 11. Provide the Existing Conditions and Demolition plans(C-201,C-202, and C-203)with a revised site plan set for review. 12. Provide the heights, materials, and details of any new proposed fencing on the site for review. Chain link is not appropriate. 13. Indicate the color of the retaining wall block on the plans. Provide a sample for review. Clarify if the wall detail applies to all proposed retaining walls. 14. Provide the standard mechanical equipment note in the General Notes on C-101 of the site plan set: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 15. Revise the lighting plan to eliminate spillover in excess of .5 fc at the property line along Stella Lane and Archer Avenue 16. Revise the lighting plans to include any proposed wall-mounted lighting. Submit manufacturer's specifications and cut sheets for any proposed wall-mounted lighting for review. 17. Provide total lumens in the luminaire schedule for all proposed lights. 18. Provide a cut sheet for all proposed fixture types showing all options chosen. Identify the color finishes in the cut sheets. 19. Provide a note on the lighting plan that 18 feet is the maximum mounting height from grade inclusive of the base. 20. Revise the architectural elevations of the buildings and structures to include the placement and mounting heights of the proposed light fixtures. 21. Provide photometric values for all proposed lights in which the LLF is equal to 1.0. 22. Rectify the lighting plans to illustrate the same number of proposed lighting fixtures as listed in the quantity field of the luminaire schedule. Albemarle County Architectural Review Board Final Action Memo July 16,2018 2 23. Provide the standard lighting note on the lighting plans(C-704 and C-705):Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle. 24. Provide sufficient planting room between the west (side) elevation of the southwestern building [in Block 4B] and the eastern edge of the 30-foot planting buffer zone in order to ensure that the entirety of the 30-foot buffer is appropriately landscaped. 25. Provide the trees on Stella Lane and Archer Avenue at 21/2"caliper at planting,spaced 40'on center on average. 26. Include the trees and shrubbery on Stella Lane and Archer Avenue to the plant schedules on the landscape plans (C-701, C-702, and C-703). Provide their botanical and common names, quantities, calipers. Alternatively, provide the road plans for ARB landscape review. 27. Provide additional perimeter parking trees so that the average planting distance is 40 feet on center. Ensure that the calipers for these trees are 2.5 inches at planting. 28. Provide 8 additional interior parking trees to Block 4B and 1 additional interior parking tree to Block 4A. 29. Ensure and demonstrate that there are no potential utility conflicts between the proposed locations of underground utilities and the proposed locations of large shade trees. 30. Provide the 50'-deep landscape buffer between the west (side) elevation of the northwestern building in Block 4B and the VDOT stormwater management facility as required by the Code of Development.Alternatively, plant 30'of buffer between the EC and the stormwater management facility. 31. Include viburnum x rhytidophyllum with the deciduous shrubs and betula nigra with large deciduous trees in all plant schedules. 32. Combine the two separate plant schedules on C-703. 33. Reduce the number of IGC and TMD so that they do not exceed the 25% of the total for that species(evergreen shrubs). 34. Provide the exact wording of the standard plant health note on the landscape plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 35. Address the rear yard setback minimum as required by the Code of Development. 36. Include a note with the retaining wall details indicating that the details apply to all proposed retaining walls. 37. Indicate on the plan the proposed color of the retaining wall block. Include a fence detail in the plan, including material and color. 38. Revise the site plans to show adequate tree protection fencing. 39. Provide a signed tree conservation checklist with the site plant set. 40. Show the 30-foot and 70-foot landscape buffer lines on the grading plans, C-401 and C-402. WORK SESSION a. ARB-2018-72: Pantops Corner Hotel Contacts:Justin Shimp, Mike McGowan, Nitin Kulkarni,Tarun Patel Albemarle County Architectural Review Board Final Action Memo July 16,2018 3 ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2018-83: Brookhill Blocks 4A and 4B Review Type Final Site Plan Parcel Identification 046000000019A0, 046000000019E 1 Location East side of Seminole Trail (Rt. 29 N) and north side of Polo Grounds Road (Rt. 643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. Zoned Neighborhood Model District (NMD)/Entrance Corridor (EC) Owner/Applicant Crockett Corporation/Bohler Engineering (Ryan Yauger) Magisterial District Rivanna Proposal To develop blocks 4A and 4B with nine multi -family apartment buildings, parking areas, and associated improvements. Context and Visibility Blocks 4A and 4B lie adjacent to and immediately east of Rt. 29, an EC. [Figure 1] Block 4A is located south of Archer Ave., 4B is located north of Archer Ave. Visibility is partly mitigated by an existing tree line. Parcels to the west and south are rural in character, while parcels to the north and east are developed as the residential communities of Forest Lakes and Montgomery Ridge. ARB Meeting Date August 20, 2018 Staff Contact Heather McMahon PROJECT HISTORY DATE APPLICATION RESULT 11/9/2016 ZMA-2015-07 Staff comments provided on the rezoning proposal. 10/2/2017 ARB-2017-81 ARB review of the initial site plan for Blocks 4A and 8A 5/23/2018 ARB-2018-52 Staff review of the initial site plan for Block 4b 7/16/2018 ARB-2018-83 ARB review of the final site plan for the combined Blocks 4A and 4B; a full resubmission and changes were requested (see Attachment A) 8/20/2018 1 ARB-2018-83 ARB will review the revised and resubmitted final site plan and architectural drawings for Blocks 4A and 4B BACKGROUND In 2015, the owners of abutting Tax Map Parcels 46-18, 46-18A, and 46-19 (a combined 277.5 acres) sought a Zoning Map Amendment (ZMA-2015-07) to rezone the rural properties (zoned R-1 Residential) into a Neighborhood Model District. As per the approved ZMA, 19 blocks will be formed and developed as a Neighborhood Service Center (Block 1), Urban Density Residential (Blocks 2 through 4), and Neighborhood Density Residential (Blocks 5 through 18). [Figure 2] This proposal focuses on Blocks 4A and 4B, which are separated by Archer Avenue, a new street which will serve as the development's main access route from Rt. 29. [Figure 3] This final site plan shows four large, rectangular multi -family apartment buildings on the north and south perimeters of Block 4A with a clubhouse, pool, fitness building, and parking on the interior, as well as a small maintenance building on the western boundary line. Five multi -family apartment buildings line the north, east, and south perimeters of Block 4B with parking relegated to the interior. Archer Avenue, the east -west entrance road from Rt. 29, terminates in a roundabout; Stella Lane is the north -south interior road that offers access to both blocks on the eastern edge. Although this is not illustrated on the Final Site Development Plan for these blocks, the southern portion of Stella Lane will feed into Polo Grounds Road. Brookhill's approved Code of Development requires a 100-foot tree buffer along Rt. 29 that will screen the western boundary of Blocks 4A and 4B, mitigating visibility of the apartment complexes from Rt. 29, the Entrance Corridor street under consideration. [Figure 41 Given this proposed 100-foot tree buffer, it is anticipated that the majority of the interior of the blocks will not be visible from Rt. 29. Archer Avenue will be visible, and likely the west, north and south elevations of the four buildings that flank Archer Avenue. Furthermore, the upper stories of the north and west elevations of the northwestern building are expected to be visible beyond the stormwater management facility landscape screening. In addition, it may be that more buildings, or greater portions of the buildings, will be temporarily visible while the 100-foot tree buffer is established. El FTI Help Mobile Scale 1' = 521 fl 0 CQ 7 a 52 8 +Y j °© '© --� Google Maps • Go .,.. _-____. j AppGeo Save Map as Image Figure 1: map showing TMPs 46-19A and 46-19B1, which are blocks 4A and 4B respectively. Brookhlll D@¥■|op m ■ntLand Use Map . kO@11 � - 7501 ■AMIAKEDuR �UR■_OIENWTY E] ■DG.@ORwWac*p*rq 0 1EF-MRPA a Figure 2: Bo k 2 Development Land Use Map, page zo the Code of Development "Bmo hlNeighborhood Model", approved 1119116. 4 Brookhill Development Illustrative Conceptual Rian Figure 3: Brookhill Development Illustrative Conceptual Plan, page 8 of the Code of Development `Brookhill Neighborhood Model", approved 1119/16. Note that the red box denotes scope of work on this proposal. a� 4 P CL J Figure 4: "Proposed 100' Buffer along Route 29 corridor, "page 20 of the Code of Development "Brookhill Neighborhood Model'; approved 1119116. ANALYSIS REF I GUIDELINE RECOMMENDATIONS 7/16/18 CURRENT ISSUE RECOMMENDATION Purpose 1 The goal of the regulation of the design of development See recommendations below. The designs of the proposed multi -family apartment None. within the designated Entrance Corridors is to insure that buildings incorporate some traditional architectural new development within the corridors reflects the elements (masonry base, brick soldier courses, traditional architecture of the area. Therefore, it is the pilasters, cornices) but they do not have a strong purpose of ARB review and of these Guidelines, that connection to the historic architecture of the area. proposed development within the designated Entrance They are in keeping with the suburbanization of this Corridors reflect elements of design characteristic of the area (Forest Lakes to the north and Montgomery significant historical landmarks, buildings, and structures Ridge to the east) as well as with the rezoning of the Charlottesville and Albemarle area, and to promote (ZMA-2015-07) for this property as a Neighborhood orderly and attractive development within these corridors. Model District. The scale and style of the buildings Applicants should note that replication of historic structures are consistent with contemporary developments. The is neither required nor desired. 100-foot deep landscape buffer along Rt. 29 will reduce the visibility of these buildings and parking 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites areas as well as maintain, to some degree, the as ensembles of buildings, land, and vegetation. In order traditional rural character of this portion of the EC. to accomplish the integration of buildings, land, and vegetation characteristic of these sites, the Guidelines There is a historic (19th century) house, Brookhill, on require attention to four primary factors: compatibility the property. The scale and design of these multi - with significant historic sites in the area; the character of family apartment buildings are not compatible with the Entrance Corridor; site development and layout; and the historic resource, which will be isolated on a 3- landscaping. acre curtilage. Com a ibility with significant historic sites: 3 New structures and substantial additions to existing Submit material and color samples for A materials board with samples has been submitted None. structures should respect the traditions of the architecture review. for review in this revised submission. The proposed of historically significant buildings in the Charlottesville materials are 2 shades of field brick veneer; and Albemarle area. Photographs of historic buildings in Revise the elevation sheets to include a hardiplank stucco finish; 3 field paints in shades of the area, as well as drawings of architectural features, key that illustrates to which building gray; white trim paint; and white vinyl windows. which provide important examples of this tradition are wall on the overall site plan the Color renderings of the buildings flanking Archer contained in Appendix A. elevation corresponds. Avenue have been submitted that provide a conceptual view of how the buildings will appear Provide floor plans of each building, by from the EC. floor, not the individual units. Revised elevations and floor plans have been Provide color renderings of Buildings A submitted for this review. The previous question of and B as seen from the entrance of whether there was a fifth habitable floor has been Archer Avenue at Rt. 29. answered with the resubmission of floor plans, sections, and roof plans there is no fifth floor). 4 The examples contained in Appendix A should be used as None. The historic manor, Brookhill, has been isolated on a None. a guide for building design: the standard of compatibility 3-acre parcel (Block 19) surrounded by a 20' tree with the area's historic structures is not intended to buffer. Development on its edges will be mid- to impose a rigid design solution for new development. high -density. Architecture that is compatible with Replication of the design of the important historic sites in this historic resource in material and forms could tie the area is neither intended nor desired. The Guideline's the new development with the site's historic standard of compatibility can be met through building character. The use of brick as a building material in scale, materials, and forms which may be embodied in the proposed apartment buildings on Blocks 4A and architecture which is contemporary as well as traditional. 4B alludes to traditional construction materials in the The Guidelines allow individuality in design to region generally as well as Brookhill in particular. accommodate varying tastes as well as special functional requirements. Com a ibility with the character of the Entrance Corridor 5 It is also an important objective of the Guidelines to None. See comment in #1. None. establish a pattern of compatible architectural characteristics throughout the Entrance Corridor in order to achieve unity and coherence. Building designs should demonstrate sensitivity to other nearby structures within the Entrance Corridor. Where a designated corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. Site de meat and layout 6 Site development should be sensitive to the existing None. The development plan shows an organized None. natural landscape and should contribute to the creation of development pattern; however, significant grading of an organized development plan. This may be the natural terrain will be required to accommodate accomplished, to the extent practical, by preserving the it. Stream buffers are preserved. trees and rolling terrain typical of the area; planting new trees along streets and pedestrian ways and choosing The 100-foot landscape buffer has been revised in species that reflect native forest elements; insuring that this submission to show continuous planting any grading will blend into the surrounding topography throughout the 100 foot depth, in a naturalistic thereby creating a continuous landscape; preserving, to the pattern that includes large and medium-sized trees as extent practical, existing significant river and stream well as shrubs, both deciduous and evergreen. valleys which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. Landsca in 7 The requirements of the Guidelines regarding landscaping Provide sufficient planting room A variety of tree and shrub (deciduous and See comments in #32 and #39. are intended to reflect the landscaping characteristic of between the west (side) elevation of the evergreen) species is proposed for the 100-foot many of the area's significant historic sites which is southwestern building and the eastern landscape buffer. However, the two Buildings A characterized by large shade trees and lawns. Landscaping edge of the 30-foot planting buffer zone have been located so that their western walls abut the should promote visual order within the Entrance Corridor in order to ensure that the entirety of the buffer line; as a consequence, the full depth of the and help to integrate buildings into the existing 30-foot buffer is appropriately buffer cannot not planted adjacent to the building. environment of the corridor. landscaped. The applicant has sought a special exception for the 10'mimimum rear -yard setback requirement in the 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that Code of Development so that these building lines share similar characteristics. Such common elements may abut the eastern edge of the buffer. This special allow for more flexibility in the design of structures exception request will be reviewed by the Board of because common landscape features will help to Supervisors at their September 5, 2018 meeting. The harmonize the appearance of development as seen from Planning and Zoning staff support this request. the street upon which the Corridor is centered. SPECIFIC GUIDELINES Compatibility with significant historic sites Structure design 9 Building forms and features, including roofs, windows, Clarify the metal eyebrow feature and The metal eyebrow feature and other architectural Revise the architectural elevations doors, materials, colors and textures should be compatible provide a material/color sample. materials/elements for which samples have not been to call out the materials listed in with the forms and features of the significant historic provided are listed in the Elevation Key Notes on the Elevation Key Notes. Revise buildings in the area, exemplified by (but not limited to) See recommendations in #3. each elevation drawing, but they are not called out or the Elevation Key Notes to omit the buildings described in Appendix A [of the design identified on the drawings themselves. those materials or architectural guidelines]. The standard of compatibility can be met features that are not proposed for through scale, materials, and forms which may be Elevations of the maintenance building have been these buildings. embodied in architecture which is contemporary as well as provided. The building has a brick base, fiber cement traditional. The replication of important historic sites in (painted dark gray) walls with white trim, and a Coordinate the dimensions of the Albemarle County is not the objective of these guidelines. shingled hipped roof. The west (rear) elevation, closest to the EC, is blind but for two small windows. trash enclosures between the architectural and site plans. Show 10 Buildings should relate to their site and the surrounding context of buildings. A port cochere (car wash structure) is located to the south. With the landscape buffer, the design of the the ramp/stair structures on the site plan. Coordinate the ramp/stair 11 The overall design of buildings should have human scale. Scale should be integral to the building and site design. maintenance building is expected to be appropriate. structures with proposed landscaping without reducing plant 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a Elevations and sections of the trash compactors have quantities or degree of screening. cohesive whole. been provided (A52.01). They are cinderblock structures with fiber -cement -clad exteriors. The rear and one side elevation are blind. The other side has a ramp/stair with rail (presumably metal), 4 wall - mounted light fixtures, and a hopper door. The front elevation will not be visible from the EC. With the landscape buffer, the design of the trash enclosures is expected to be appropriate. However, the dimensions of the trash enclosures differ between the architectural and site plans. Also, the ramp/stair structures are not shown on the site plan and they ma conflict with proposed landscape screening. 13 Any appearance of "blankness" resulting from building None. The fagades of the proposed buildings have variation Consider increasing the level of design should be relieved using design detail or and relief (projections, recesses, balconies) as well as detail in the west elevation of vegetation, or both. proposed shrubbery such that blankness is not a Building C, Block 4B, consistent characteristic of the design. In Block 4B, the west with that provided in Building B. end elevation of Building C will be visible beyond the stormwater facility. The elevation incorporates less detail and fewer windows than the corresponding elevation of Building B. The greater level of detail is more a ro riate for the EC. 14 Arcades, colonnades, or other architectural connecting None. No architectural connecting devices are proposed. None. devices should be used to unify groups of buildings within a development. 15 Trademark buildings and related features should be None. There is no evidence of a trademark design in the None. modified to meet the requirements of the Guidelines. submitted drawings. 16 Window glass in the Entrance Corridors should not be None. The window glass note had been provided on the Provide the window glass note on highly tinted or highly reflective. Window glass in the previous sets of architectural elevations, within the the architectural elevations. Entrance Corridors should meet the following criteria: Elevation Key Notes panel, but is missing from the Visible light transmittance (VLT) shall not drop below resubmission/revised set. 40%. Visible light reflectance (VLR) shall not exceed 30%. Specifications on the proposed window glass should be submitted with the application forfinal review. Accessory structures and equipment 17 Accessory structures and equipment should be integrated Include the location of the proposed The mail kiosks have been illustrated on the revised None. into the overall plan of development and shall, to the mail kiosk and any other proposed site plan; they are located in the northwest corner of extent possible, be compatible with the building designs accessory structure on the site plans (C- the central open space in Block 4A and in the used on the site. 301 and C-302). southwest corner of the central open space in Block 10 4B. No architectural elevations or material/color samples have been provided for these, but they are minor structures and are not likely to be visible from the EC. 18 The following should be located to eliminate visibility from Provide additional evergreen Elevations for the trash compactors have been Illustrate electric, gas, telephone the Entrance Corridor street. If, after appropriate siting, landscaping in the vicinity of the trash submitted for this review, and more screening, and cable utilities on the site plan, these features will still have a negative visual impact on the compactor on Block 4B to eliminate its primarily composed of evergreens, has been provided or indicate that no such utilities are Entrance Corridor street, screening should be provided to visibility from the EC. Provide around the trash compactor on Block 4B to mitigate proposed. eliminate visibility. dumpster/compactor screening details in its visibility from the EC. a. Loading areas, the plan. b. Service areas, Roof plans and architectural sections have been c. Refuse areas, Provide a roof plan and elevations that provided for review. The sections show that the d. Storage areas, show all proposed roof -mounted rooftop mechanical equipment will not be visible e. Mechanical equipment, mechanical equipment. Provide sight from the EC. f. Above -ground utilities, and line drawings to confirm that the g. Chain link fence, barbed wire, razor wire, and similar equipment can't be seen from the street. Electric, gas, telephone and cable lines are not security fencing devices. illustrated on the plan. Provide all proposed utilities on the Utility Plan (C-501 and C-502). The Existing Conditions and Demolition plans (C- 201, C-202, and C-203) have been included in this Provide the Existing Conditions and revised site plan set. The chain -link fence currently Demolition plans (C-201, C-202, and C- existing around the VDOT-owned stormwater 203) with a revised site plan set for management facility (SWMF) will be removed. The review. applicant has provided new fencing details (with material and color specified) for review. The Provide the heights, materials, and proposed fence is an Elite brand, metal picket fence details of any new proposed fencing on with horizontal rails, field -painted black. It will rise the site for review. Chain link is not approximately 4 feet from concrete footings. The appropriate. style of the fence is consistent with security fence designs previously approved by the ARB and it will be an improvement upon the current chain -link fence. 19 Screening devices should be compatible with the design of Indicate the color of the retaining wall Materials and colors for the proposed retaining walls None. the buildings and surrounding natural vegetation and may block on the plans. Provide a sample for on the site have been submitted with a detail on C- consist of: review. Clarify if the wall detail applies 901 of the site plan set. Proposed walls A-D flank a. Walls, to all proposed retaining walls. Archer Avenue and will be visible from the EC. Each b. Plantings, and is 3-feet tall. They will be built of Diamond Pro- c. Fencing. brand, "stone cut" block in the `Blue Ridge Range" color. Their visibility will be mitigated by street trees 11 on Archer Avenue, but the block is expected to have an appropriate appearance for the EC. 20 Surface runoff structures and detention ponds should be See recommendation in #36. A VDOT-owned SWMF exists to the west of the See recommendation in #36. designed to fit into the natural topography to avoid the need northwest corner of block 413; aegis over the for screening. When visible from the Entrance Corridor maintenance of the SWMF will be transferred to the street, these features must be fully integrated into the applicant/property owner. The grading plans show landscape. They should not have the appearance of additional grading and enlarging of the retention engineered features. pond, as well as a 113-foot long by 10-foot wide level spreader. Overall, the form of the enlarged SWMF looks engineered, not natural. Landscaping is being relied upon to mitigate the appearance. 21 The following note should be added to the site plan and the Provide the standard mechanical The note has been provided on the site plan set, Provide the standard mechanical architectural plan: "Visibility of all mechanical equipment equipment note in the General Notes on within the General Notes on C-101, as requested. equipment note on the from the Entrance Corridor shall be eliminated." C-101 of the site plan set. However, the note that was previously included in architectural elevations. the architectural drawings has been eliminated. Lighting General Guidelines 22 Light should be contained on the site and not spill over Revise the lighting plan to eliminate Stella Lane and Archer Avenue will be public streets. None. onto adjacent properties or streets; spillover in excess of .5 fc at the The revised drawings show no spillover over 0.5 fc property line along Stella Lane and on either right-of-way. Archer Avenue. 23 Light should be shielded, recessed or flush -mounted to Revise the lighting plans to include any The lumens value for each proposed light fixture has Provide total lumens in the eliminate glare. All fixtures with lamps emitting 3000 proposed wall -mounted lighting. not been provided in the luminaire schedules of the luminaire schedule for all lumens or more must be full cutoff fixtures. Submit manufacturer's specifications revised site plan, but all fixtures are full cut-offs. proposed lights. for any proposed wall -mounted lighting for review. Wall -mounted lighting is shown on the architectural Revise the lighting plans to include elevations and provided on the plans except for the the illumination output from the Provide total lumens in the luminaire clubhouse and fitness building on Block 4A. No proposed light fixtures on the schedule for all proposed lights. footcandle values are provided for the area east of the Clubhouse and the Fitness clubhouse and west of the fitness building on the Building in Block 4A. Add the revised site plan. proposed light fixtures graphically to the site plan. Include the light fixtures' specifications in the luminaire schedules. 24 Light levels exceeding 30 footcandles are not appropriate None. The highest footcandle value provided is 37.5, while Revise the lighting plan such that for display lots in the Entrance Corridors. Lower light several of the wall mounted lights, Model D, emit no footcandle value exceeds 20 fc. levels will apply to most other uses in the Entrance values ranging from 23.5 to 37.5. Footcandle values Corridors. above 20 are not appropriate for the EC. 12 25 Light should have the appearance of white light with a Provide a cut sheet for all proposed All freestanding lighting models listed in the None. warm soft glow; however, a consistent appearance fixture types showing all options luminaire schedule on the lighting plans are 40K, throughout a site or development is required. chosen. Identify the color finishes in the which will provide a consistent "day white" light Consequently, if existing lamps that emit non -white light cut sheets. color throughout the site. The wall -mounted model D are to remain, new lamps may be required to match them. is 30K, which is a softer white. This inconsistency is not expected to have a noticeable impact. 26 Dark brown, dark bronze, or black are appropriate colors None. for free-standing pole mounted light fixtures in the Entrance Corridors. The colors of the wall -mounted light models are unspecified, but model E is a recessed can light and model D is unlikely to be seen from the EC. All freestanding models (A-C) are listed as textured black. 27 The height and scale of freestanding, pole -mounted light Provide a note on the lighting plan that All freestanding lights have a proposed mounting Provide a note on the lighting plan fixtures should be compatible with the height and scale of 18 feet is the maximum mounting height of 18 feet above grade. However, no note has that 18 feet is the maximum the buildings and the sites they are illuminating, and with height from grade for the pole lights, been included saying that the 18' is inclusive of the mounting height from grade for the the use of the site. Typically, the height of freestanding inclusive of the base. base height. The heights for the wall -mounted pole lights, inclusive of the base. pole -mounted light fixtures in the Entrance Corridors fixtures have not been given. should not exceed 20 feet, including the base. Fixtures that Revise the architectural elevations of exceed 20 feet in height will typically require additional the buildings and structures to include screening to achieve an appropriate appearance from the the placement and mounting heights of Entrance Corridor. the ro osed light fixtures. 28 In determining the appropriateness of lighting fixtures for Provide photometric values for all The revised lighting plan's photometric values have None. the Entrance Corridors, the individual context of the site proposed lights in which the LLF is been calculated with LLF equal to 1.0. will be taken into consideration on a case by case basis. equal to 1.0. Rectify the lighting plans to illustrate the same number of proposed lighting fixtures as listed in the quantity field of the luminaire schedule. 29 The following note should be included on the lighting Provide the standard lighting note on The note has not been provided on the lighting plans. Provide the standard lighting note plan: "Each outdoor luminaire equipped with a lamp that the lighting plans (C-704 and C-705). on the lighting plans (C-704 and emits 3,000 or more initial lumens shall be a full cutoff C-705). luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 30-31 Guidelines for the Use of Decorative Landscape Lighting None. None proposed. None. 13 Landscaping 32 Landscaping along the frontage of Entrance Corridor Provide sufficient planting room The landscape and lighting plans have been Revise the plan to eliminate streets should include the following: between the west (side) elevation of the coordinated, but discrepancies and conflicts persist. conflicts between light poles and a. Large shade trees should be planted parallel to the southwestern building [in Block 4B] There are 2 model B lights (with mounting heights of trees. Entrance Corridor Street. Such trees should be at least 3'/2 and the eastern edge of the 30-foot 18') that appear to conflict with 2 Zelkovas at the inches caliper (measured 6 inches above the ground) and planting buffer zone in order to ensure Archer Avenue entrance to Block 4A. Also, 1 model Reduce the depth of the planting should be of a plant species common to the area. Such that the entirety of the 30-foot buffer is B light is missing graphically from C-702, on the gap along the western wall of the trees should be located at least every 35 feet on center. appropriately landscaped. south side of the Stella Lane entrance to Block 4A. southwestern building in Block 4B b. Flowering ornamental trees of a species common to the On C-701 (Block 4B), 1 light model A is missing and the beginning of the landscape area should be interspersed among the trees required by the graphically from the south side of the central buffer to 10' by adding trees. preceding paragraph. The ornamental trees need not greenspace, and 2 model C lights on the west edge of alternate one for one with the large shade trees. They may be the site appear to be planted directly under 2 planted among the large shade trees in a less regular spacing Zelkovas, which may create a conflict in height. pattern. c. In situations where appropriate, a three or four board As per the issue regarding setbacks: two buildings' fence or low stone wall, typical of the area, should align western side elevations do not meet the minimum the frontage of the Entrance Corridor street. requirement (10 feet) of the rear setback established d. An area of sufficient width to accommodate the in the Code of Development for Block 4. As it is foregoing plantings and fencing should be reserved currently drawn, the west line of the southwestern parallel to the Entrance Corridor street, and exclusive of building in Block 4B abuts the 30-foot buffer, while road right-of-way and utility easements. the southwestern corner of the west elevation of the northwestern building in Block 4A does the same. Hence, trees will need to be spaced away from the building to allow maintenance access. The applicant is seeking a special exception from the minimum 10' rear setback requirement in the Code of Development (which will be heard at the Board of Supervisors' meeting on September 5, 2018). As it is currently drawn, a 5'-10' planting depth gap exists between the eastern edge of the 30' buffer area and the southern portion of the west elevation of the northwest building in Block 4A, which will suffice for maintenance and have minimal visual impact from the EC. However, a larger planting gap (15'- 22') remains along the whole of the west elevation of the southwestern building in Block 4B. This should be reduced to 10', just as it is illustrated in Block 4A. 14 33 Landscaping along interior roads: Provide the trees on Stella Lane and The proposed trees and shrubs along Stella Lane and Revise the landscape plans on C- a. Large trees should be planted parallel to all interior Archer Avenue at 21/2" caliper at Archer Avenue have been included in the landscape 701 and C-702 to call out the roads. Such trees should be at least 2%2 inches caliper planting, spaced 40' on center on schedules on the landscape plans (C-701 and C-702). number and types of shrubbery (measured six inches above the ground) and should be of a average. (The trees are shown on the corresponding road proposed for Stella Lane and plant species common to the area. Such trees should be plans.) The planting distances are 40 feet on center Archer Avenue. Rectify the plant located at least every 40 feet on center. Include the trees and shrubbery on Stella Lane and Archer Avenue to the and the calipers are 2.5 inches, which comply with the standards and criteria. However, although the schedules to correspond to the illustration. 34 Landscaping along interior pedestrian ways: a. Medium trees should be planted parallel to all interior plant schedules on the landscape plans shrubs are illustrated along Archer Avenue and Stella pedestrian ways. Such trees should be at least 21/2 inches (C-701, C-702, and C-703). Provide Lane, the types and quantities were not called out on caliper (measured six inches above the ground) and should their botanical and common names, the drawings. be of a species common to the area. Such trees should be quantities, calipers. Alternatively, located at least every 25 feet on center. provide the road plans for ARB Trees have been provided for the interior walkways landscape review. that access the central amenity spaces in both blocks. They are listed as 2.5" caliper in the plant schedules. 35 Landscaping of parking areas: Provide additional perimeter parking Parking areas adjacent to the EC may be temporarily Revise the plan to resolve all a. Large trees should align the perimeter of parking areas, trees so that the average planting visible in places until the reforested areas of the 100- utility/landscape conflicts. located 40 feet on center. Trees should be planted in the distance is 40 feet on center. Ensure that foot landscape buffer are established and mature. interior of parking areas at the rate of one tree for every 10 the calipers for these trees are 2.5 Therefore, sufficient parking lot trees are necessary parking spaces provided and should be evenly distributed inches at planting. to mitigate visibility from the EC. No additional throughout the interior of the parking area. perimeter parking trees have been provided on this b. Trees required by the preceding paragraph should Provide 8 additional interior parking revised site plan, and in fact, two Zelkovas have been measure 2'/2 inches caliper (measured six inches above the trees to Block 4B and 1 additional removed from the southern side of Block 4B. ground); should be evenly spaced; and should be of a interior parking tree to Block 4A. However, a sufficient number of interior parking species common to the area. Such trees should be planted trees have been provided. in planters or medians sufficiently large to maintain the Ensure and demonstrate that there are health of the tree and shall be protected by curbing. no potential utility conflicts between the Engineering reviewers prefer a minimum 7 to 8-foot c. Shrubs should be provided as necessary to minimize the proposed locations of underground distance from the center of a pipe or utility line to parking area's impact on Entrance Corridor streets. Shrubs utilities and the proposed locations of large trees. In Block 4B, 2 Zelkovas are within 6' of should measure 24 inches in height. large shade trees. the center of the sewer line, on the west side of the central open space; 1 willow oak, at the southeast corner of the central open space, is in the stormwater easement; and 1 willow oak in the southwest corner of the site is within both the water and stormwater easements. 36 Landscaping of buildings and other structures: Provide the 50'-deep landscape buffer Shrubs are proposed for the fagades of those Graphically provide the numbers a. Trees or other vegetation should be planted along the between the west (side) elevation of the buildings facing Stella Lane and Archer Avenue. and varieties of shrubs proposed front of long buildings as necessary to soften the northwestern building in Block 4B and However, the applicant has removed the graphic for the foundations of those appearance of exterior walls. The spacing, size, and type the VDOT stormwater management labels of these and provided a new note (number 4) buildings lining Archer Avenue. 15 of such trees or vegetation should be determined by the facility as required by the Code of suggesting that the plants will be provided, but are Ensure that no proposed shrub length, height, and blankness of such walls. Development. Alternatively, plant 30' not required. Only two shrubs species are proposed exceeds in quantity 25% of the b. Shrubs should be used to integrate the site, buildings, of buffer between the EC and the for the foundation plantings (dwarf inkberry hollies total shrub count. and other structures; dumpsters, accessory buildings and stormwater management facility. and densiformis yews); this does not comply with structures; "drive thru" windows; service areas; and signs. diversity criteria intended to ensure plant health. Provide an additional 55 feet of Shrubs should measure at least 24 inches in height. While those foundation plantings on Stella Lane will landscape frontage on the west not be visible from the EC, those on Archer Avenue side of the stormwater will be, so the relevant details are required for management facility to the review. northwest of Block 4B to join the existing tree line or proposed 100' The applicant is seeking a special exception to revise frontage landscape buffer. the Code of Development requirement for 50' of landscape buffer between the stormwater facility and the development to a 20' buffer on the east side of the facility and a 30' buffer on the west side. The 30' of added landscaping on the west side of the stormwater management facility will be an improvement as viewed from the EC. However, there is a 65' gap in the planting southwest of the facility. Ten feet of that gap must be kept clear for a vehicular access drive, but the remaining 55' span could be planted. 37 Plant species: Include viburnum x rhytidophyllum with The viburnum x rhytidophyllum has been included as Rectify the errors and a. Plant species required should be as approved by the the deciduous shrubs and betula nigra a deciduous shrub while the betula nigra has been discrepancies in the plant Staff based upon but not limited to the Generic Landscape with large deciduous trees in all plant added to the large deciduous tree category in the schedules on C-701, C-702, and C- Plan Recommended Species List and Native Plants for schedules. plant schedules. 703. Virginia Landscapes (Appendix D). Combine the two separate plant The two separate plant schedules on C-701 and C- Address the discrepancy in the schedules on C-703. 702 have been combined on C-703. However, number of Zelkovas illustrated on discrepancies in all plant schedules persist. On C- C-701 and those in the detail of the Reduce the number of IGC and TMD so 701, the quantity of QPH is listed as 11, but 10 were tree canopy in Block 4B provided that they do not exceed the 25% of the counted; the number of IV is listed as 34, but 44 were on sheet C-703. total for that species (evergreen shrubs). counted; TMD is listed as 47, but 77 were counted; and 30 ICG could not be located. On C-702, 30 ICG See recommendation in #36. could not be located and the number of TMD is listed as 29 but 59 were counted. These errors were carried through to the combined plant schedule on C-703. 16 The detail of the tree canopy on Block 4B on C-703 does not correlate with the landscape plan for that block (C-701) — 6 ZSGV are missing in the middle. The quantities of IGC and TMD were not reduced so as not to exceed 25% of the total for that species ever een shrubs). 38 Plant health: The following note should be added to the Provide the exact wording of the The note has been provided on all landscape plan None. landscape plan: "All site plantings of trees and shrubs shall standard plant health note on the sheets (C-701, C-702 and C-703). be allowed to reach, and be maintained at, mature height; landscape plan. the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." Site Development and layout Develo ment pattern 39 The relationship of buildings and other structures to the Address the rear yard setback minimum The development exhibits an organized pattern of None. Entrance Corridor street and to other development within as required by the Code of roads and sidewalks. The proposed buildings are the corridor should be as follows: Development. perpendicular to the EC, with their sides and backs a. An organized pattern of roads, service lanes, bike paths, turned to the EC, across a sea of interior parking and pedestrian walks should guide the layout of the site. which is closest to the EC. However, this is separated b. In general, buildings fronting the Entrance Corridor from the EC by a 100-foot landscape buffer. The street should be parallel to the street. Building groupings open space requirement for Block 4 (both 4A and 4B should be arranged to parallel the Entrance Corridor street. combined) is 10,000 square feet with active c. Provisions should be made for connections to adjacent recreational amenities; this has been met in Block pedestrian and vehicular circulation systems. 4A. No significant natural features lie in this section d. Open spaces should be tied into surrounding areas to of the development. provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including In terms of setbacks required by the Code of creek valleys, steep slopes, significant trees or rock Development, the applicant is seeking a special outcroppings), to the extent practical, then such natural exception to the 10' minimum rear setback features should be reflected in the site layout. If the requirement and to the 50' landscape buffer on the provisions of Section 32.5.6.n of the Albemarle County east side of the stormwater management facility in Zoning Ordinance apply, then improvements required by the northwest corner of Block 4B. That request will that section should be located so as to maximize the use of be heard by the Board of Supervisors on September existing features in screening such improvements from 5t''. Planning and Zoning staff support the request for Entrance Corridor streets. the setback variance but have asked the applicant to f. The placement of structures on the site should respect provide more landscaping than the currently existing views and vistas on and around the site. proposed 20' on the east side of the pond. 17 Site Gradin 40 Site grading should maintain the basic relationship of the Include a note with the retaining wall A retaining wall detail is provided on C-901; it None. site to surrounding conditions by limiting the use of details indicating that the details apply shows a Diamond Pro Block (proposed retaining walls and by shaping the terrain through the use of to all proposed retaining walls. material/brand) wall with a fence located three feet smooth, rounded land forms that blend with the existing behind it. The detail has been revised to state the terrain. Steep cut or fill sections are generally unacceptable. Indicate on the plan the proposed color material and color proposed and that it is typical for Proposed contours on the grading plan shall be rounded with of the retaining wall block. Include a all proposed retaining walls. a ten foot minimum radius where they meet the adjacent fence detail in the plan, including condition. Final grading should achieve a natural, rather than material and color. engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend See recommendations in #18 and #19. with the landscape. 41 No grading, trenching, or tunneling should occur within the Revise the site plans to show adequate Tree protection fencing has been shown on Erosion None. drip line of any trees or other existing features designated tree protection fencing. & Sediment Control site plans (sheets C-200 and C- for preservation in the final Certificate of Appropriateness. 201) that have been submitted for ARB review. A Adequate tree protection fencing should be shown on, and Provide a signed tree conservation signed tree conservation checklist has been provided coordinated throughout, the grading, landscaping and checklist with the site plant set. on C-703. The landscape buffer lines have been erosion and sediment control plans. Show the 30-foot and 70-foot landscape added to the revised grading plans on C-401 and C- 402. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and buffer lines on the grading plans, C-401 protected on the site prior to any grading activity on the and C-402. site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. 18 Staff recommends the following as the primary points of discussion: 1. The landscape buffer requirement for the existing stormwater management facility to the west of the northwest corner of Block 4B. 2. Increasing the level of detail in the west elevation of Building C, Block 4B, consistent with that provided in Building B. Staff offers the following comments on the proposal: 1. Revise the architectural elevations to call out the materials listed in the Elevation Key Notes. Revise the Elevation Key Notes to omit those materials or architectural features that are not proposed for these buildings. 2. Coordinate the dimensions of the trash enclosures between the architectural and site plans. Show the ramp/stair structures on the site plan. Coordinate the ramp/stair structures with proposed landscaping without reducing plant quantities or degree of screening. 3. Consider increasing the level of detail in the west elevation of Building C, Block 413, consistent with that provided in Building B. 4. Provide the window glass note on the architectural elevations: Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below 4001o. Visible light reflectance (VLR) shall not exceed 3001o. Specifications on the proposed window glass should be submitted with the application for final review. 5. Illustrate electric, gas, telephone and cable utilities on the site plan, or indicate that no such utilities are proposed. 6. Provide the standard mechanical equipment note on the architectural elevations: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 7. Provide total lumens in the luminaire schedule for all proposed lights. 8. Revise the lighting plans to include the illumination output from the proposed light fixtures on the Clubhouse and the Fitness Building in Block 4A. Add the proposed light fixtures graphically to the site plan. Include the light fixtures' specifications in the luminaire schedules. 9. Revise the lighting plan such that no footcandle value exceeds 20 fc. 10. Provide a note on the lighting plan that 18 feet is the maximum mounting height from grade for the pole lights, inclusive of the base. 11. Provide the standard lighting note on the lighting plans (C-704 and C-705). 12. Revise the plan to eliminate conflicts between light poles and trees. 13. Reduce the depth of the planting gap along the western wall of the southwestern building in Block 4B and the beginning of the landscape buffer to 10' by adding trees. 14. Revise the landscape plans on C-701 and C-702 to call out the number and types of shrubbery proposed for Stella Lane and Archer Avenue. Rectify the plant schedules to correspond to the illustration. 15. Revise the plan to resolve all utility/landscape conflicts. 16. Graphically provide the numbers and varieties of shrubs proposed for the foundations of those buildings lining Archer Avenue. Ensure that no proposed shrub exceeds in quantity 25% of the total shrub count. 17. Provide an additional 55 feet of landscape frontage on the west side of the stormwater management facility to the northwest of Block 4B to join the existing treeline or proposed 100' frontage landscape buffer. 18. Rectify the errors and discrepancies in the plant schedules on C-701, C-702, and C-703. 19. Address the discrepancy in the number of Zelkovas illustrated on C-701 and those in the detail of the tree canopy in Block 4B provided on sheet C-703. 19 UM:30W.1 This report is based on the following submittal items: Sheet # Drawing Name Drawing Date C-100 Cover Sheet 7/3/18 C-101 General Notes 7/3/18 C-201 Overall Existing Conditions Plan 7/3/18 C-202 and C-203 Existing Conditions and Demolition Plan 7/3/18 C-301 and C-302 Site Plan 7/3/18 C-401 and C-402 Grading Plan 7/3/18 C-501 and C-502 Utility Plan 7/3/18 C-701 and C-702 Landscape Plan 7/3/18 C-703 Landscape Compliance Charts 7/3/18 C-704 and C-705 Lighting Plan 7/23/18 C-706 Lighting Details 7/23/18 C-901 Site Details 7/3/18 C-906 Landscape Details 7/3/18 C-200 and C-201 Erosion & Sediment Control Plan Phase I n.d. Site Sections (7 sheets) 7/19/18 A1.01 Architectural Site Plan 7/3/18 A2.01 Building Type A — Ground Floor Plan 7/3/18 A2.02 Building Type A — Level 2 Plan 7/3/18 A2.03 Building Type A — Level 3 Plan 7/3/18 A2.04 Building Type A — Level 4 Plan 7/3/18 A2.05 Building Type A — Roof Plan 7/3/18 A2.11 Building Type B — Ground Floor Plan 7/3/18 A2.12 Building Type B — Level 2 Plan 7/3/18 A2.13 Building Type B — Level 3 Plan 7/3/18 A2.14 Building Type B — Roof Plan 7/3/18 A2.21 Building Type C — Lower & Ground Floor Plans 7/3/18 20 A2.22 Building Type C — Level 2 Plan 7/3/18 A2.23 Building Type C — Level 3 Plan 7/3/18 A2.24 Building Type C — Roof Plan 7/3/18 A2.31 Building Type D — Lower & Ground Floor Plans 7/3/18 A2.32 Building Type D — Level 2 Plan 7/3/18 A2.33 Building Type D — Level 3 Plan 7/3/18 A2.34 Building Type D — Roof Plan 7/3/18 A2.41 Building Type E — Ground Floor Plan 7/3/18 A2.42 Building Type E — Level 2 Plan 7/3/18 A2.43 Building Type E — Level 3 Plan 7/3/18 A2.44 Building Type E — Roof Plan 7/3/18 A4.01 Building Type A — Elevations 7/3/18 A4.02 Building Type A — Elevations 7/3/18 A4.03 Building Type A — Sections 7/3/18 A4.11 Building Type B — Elevations 7/3/18 A4.21 Building Type C — Elevations 7/3/18 A4.31 Building Type D — Elevations 7/3/18 A4.41 Building Type E — Elevations 7/3/18 Al2.01 Clubhouse Floor Plan 7/3/18 A14.01 Clubhouse Elevations 7/3/18 A14.03 Clubhouse Roof Plan 7/3/18 A22.01 Fitness Building Floor Plan 7/3/18 A22.03 Fitness Center Roof Plan 7/3/18 A24.01 Fitness Building Elevations 7/3/18 A32.01 Maintenance Floor Plan and Elevations 7/3/18 A52.01 Trash Enclosure and Elevations 7/3/18 21 �+art�� h! sy _ � r COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Raad, North Wing Charlottesville, Virginia 129024596 Phone (434) 296-5832 Fax (434) 972-4126 July 17, 2018 Ryan Yauger Rohlcr hingincering 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 RE: ARB-201 B 83 Srookhill Blocks 4.A and 4B Final Dear Mr. Yauger, The Albentade County Architectural Review Board, at its meeting on duly Ili, 2019. completed a review of the above -noted request. The Board offered the following comments for the benefit of the applicant's next submittal. Plcasc note that the fallowing comnicrits arc those that have been identified at this time. Additional conmtcnts inay be added or eliminated based on further review and changes to the plan. I. Submit maicrial and color samples fur review, 2. Rcvisc the elevation sheets to ineludc a key that illustrates to which building wall on the overall site plan the elevation corresponds. 3. Providc floor plans of each building. by fluor, not the individual units. 4. Pruvidc color renderings of Buildings A and R as seen from the entrance of Archer Avenue at Rt. 29 5. Add planlings as described for 30' within the VD07 right -of --way tp scrcen the srornwatcT managemenl facility, contingent on VDOTapproval. 6. Clarify the moral eyebrow fealum and provide a maiuials and color sample. 7. Include the location of the proposed mail kiosk and any othcr proposed accessory structure on the sift plans (C-301 and C-304 8- provide additional uvurgrc,n landscaping in thu vicinityofthe trash cumpautor on block 48 to eliminate its vi&ibility from rho P.C. Pnnidu dumpstcrlcompuutnr 3ureuning dulails in ibc plan. 9. Provide a roofplan and elevations that show all proposed roof -mounted rnechunival equipment. Provide aighi line drawings to confirm chat the equipment Can't be seen from the street. IU. Provide all proposed utilities on the Utility Plan (C-501 and C-502). 1 1- Frovide the Eximing Cimdifions and Ilemolilion plans (C-201. C-202, and C-203) with a revised site plan set for review. 12. Provide the heights, materials, and details of -any new proposed fencing on the site for review. Chain link is not appropriate. 13. Indicate the color of the retaining wall block on the plans. Provide a sample far review. Clarify if the wall detail applies to all proposed retaining walls. 14. Provide the standard mechanical equipment note in the General Notes on C-101 ofthe site plan set Visibility o/all mechanical egtupmeni from the Enrnmee Corridor shalt be eliminated. 15. Revise the lighting plan to eliminate spillover in excess of .5 fie at the property line along Stella Lane and Archer Avenue 16. Revise the lighting plans to include any proposed wall -mounted lighting. Submit manufacturer's specifications and cut shccts for any proposed wall-moutrted lighting for review. 17. Provide total huncns in the luminaire schedule for all proposed lights. 18. Provide a cut shcct for all proposed fixture types showing all options chosctu. Identify the color finishes in the cut sheets. 19. Provide a notc on the lighting plan that I R feet is the maximum mounting height from gradc inclusivc of the bast. 20. Revise the architcourul elevations of the buildings and structures to ineludc the placement and mounting heights of the proposed light fixtures, 21. Providc photometric values For all proposed lights in which the LLF is equal to 1 A. 22, Rectify the lighting plans to illustrate the same number of proposed lighting fixates as listed in the quantity f old of the luminairr schedule. 21 Providc the standard lighting note on the lighting plans (C-704 and C-705); Each outdoor larmfnaim equipped with a lamp that emils 3,00 or M*M initial 1umens shall be afull CNiRfflu=nafre andshall be arranged ar shielded to rej7eci light awov from adioming residential durricrs and away from adfacew roads, T7respilloLer ojllghting fraAa lnmfnalres onto public roods and property in residential er ramt areas znning di.vtrictr shall not exceed one heelffoolcandle, 24, Providc sufficient planting room between the wcst (side) elcvation of the southwcstcm building [in Block 4131 and the cu irrn cdgu of the 30-fixn planting hui9cr rime in ordur to ensum that the entirety of the 30-fooi bolter is appropriately landsuapcJ. 25. Provide the trees on Stella lane and Archer Avenue al2V' caliper at planting, spaced 40' nn center an average. 26. Include the trace and ;hmhhery on Stella Lane and Archer Avenue tit the plant r:chcdulet: on the landscape plans (C-701, C-702, and C-703)_ Proti^ide their botanical and common names, quantities, caliper&. Alternatively, provide the road plans for AR13 landscape review_ 27. Provide additional perimeter parking trees so dur the average planting distance is 40 teet on center. Ensure that the calipers far these trees are 2.5 inches. at planting, 28_ Provide 8 additional interior parking trees to Block 4B and 1 additional interior parking tree to Block 4A. 29_ Ensure and demonstrate that there are no potential utility conflicts between the proposed locations of underground utilities and the proposed locations of large shade trees_ 30. Provide the 50'-deep landscape buffer between the west (side) elevation of the northwestern building in Block 4R and the VWT stormwater management facility as required by the Code of Development. Alternatively, plant 30' of buffer between the EC and the stormwater management facility, 31. Include viburnum x rhttidophyllum with the deciduous shrubs and bettila nigra with large deciduous trees in all plant schedules. 32_ Combine the two separate plant schedules an C-703. 33. Reduce the number of 16C and TMD so that they do not exceed the 2S"/ of the total for that species (evergreen shrubs). 34_ Provide the exact wording of the standard plant health note on the landscape plain Rlf siie plantings of frees and ehrulu dealt he allowed to reach, and be maimained at. nature height, the lopping of rrees isprahibited. Shrubs and rigs shall be p pried minimally and only iosupparr the overall health ofrhe Plant 35. Address the rear yard setback minimum as required by the Code of Developmem, 36. Include a note with the retaining wall details indicating that the details apply to all proposed retaining walls. 37. indicate on the plan the proposcd color of the retaining wall block. Include a fence detail in the plan, including material and color. 39. Rcvisc the site plans to show adequate tree protection fencing. 22 39. Provide a signed tree conservation checklist with the site p1mit set. 40. Show the 34-foot and 70-fooi landscape buffer lines on tlw grading plans, C401 and C402. YOU may resubmit for Continued ARB review at your earliest convenience, Revised drawings addressing the comments listed above are required. Plcasc provide updatod revision dates on each drawing and a memo including detailed responses indicating hour each comment has been addressed. If changes other than those requmcd have bccn made, identify those cluhngcs in the memo also. Ili ghlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. Please include the attached resubmittal farm for proper processing, If you have any questions concerning any of the abovc, picasc feel free to contact roc. Sincerely, 9-010 Hcathcr McMahon Scnior Planner 434-296-5832 x 3 278 hmcmahon r. albcmadc, org ce; mock t CorpvTatiOH, 435 pork St„ CharlottOViIle., VA 2Z901 ARB-2019-9.1 23