Loading...
HomeMy WebLinkAboutWPO201900024 Review Comments WPO VSMP 2019-05-13COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit Plan review Project: Hillcrest Vineyard and Winery, LLC (VSMP) Plan preparer: Tom Shumate, Jr, LS, 1000 W. Main St. Waynesboro, VA 22980 [tomj r(a)tomshumatesurveyor. com] Owner or rep.: Augusta Professional Park, LLC —P.O. Box 300, Lyndhurst, VA 22952 [mmc ig nnisAr717.net] Plan received date: 31 Jan 2019 (Initial submittal, VESCP (Rev. 1) 28 Mar 2019 (Rev. 2) 22 Apr 2019 (Rev. 3) 10 May 2019 (.PDF) Date of comments: 12 Mar 2019 (Rev. 1) 16 Apr 2019 (Rev. 2) 6 May 2019 (Rev. 3) 13 May 2019 — Approval pending; see, below Reviewer: John Anderson WP02019-00024 (WP0201900005 /VESCP Assig_mnent should be WP02019-00024) for Final Submittal — A reversal from Rev. 2 comments. County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved pending non design -related items (easements /final submittal — ref. email sent 5/13/2019 3:18 PM). Please note: ESC /SWM Plan bonds must be posted prior to receiving a Grading Permit. See Process, below (p. 8). A. Stormwater Pollution Prevention Plan (SWPPP) — (Rev. 3) Prior review comments addressed. The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. Link to County template: httn://www.albemarle.ore/unload/imaces/forms center/departments/Community Development/forms/En2in eerin,g and_WPO Forms/Stormwater Pollution Prevention Plan SWPPP template.pdf a. Please provide SWPPP; use county template. b. Please pay particular attention to: i. Sec. 1 (Registration Statement); link https://www.deq.virginia. gov/Portals/O/DEO/Water/Publications/CGPRegistrationStatement2O l4.pdf ii. Sec. 6.A. (I I" X 17" SWPPP Exhibit) (Rev. 1) Partially addressed. As follow-up: See item A.e., below. (Rev. 2) Addressed. iii. Sec. 6.E. (Persons responsible for pollution prevention practices) (Rev. 1) Addressed. iv. Sec. 8 (Qualified personnel /SWPPP inspections) (Rev. 1) Addressed. v. Sec. 9 (Signed Certification; SWPPP complete /accurate) (Rev. 1) Addressed. vi. Sec. 12 (Inspection log /form /template). (Rev. 1) Addressed, but please see item e.ix., below. c. List WP02019-00005 on cover of SWPPP. d. List project name as: Hillcrest Vineyard & Winery LLC (Rev. 1) Addressed. e. Additional; Sec. 6.A. /Exhibit: Engineering Review Comments Page 2 of 8 i. Show paint /stucco /solvent storage, and clean -out location, (Rev. 1) Partially addressed. Sheet 2 Note: `This facility is for agricultural purposes, therefore, there will be no storage of paint /stucco /solvent.' As follow-up: Please confirm there will be no on - site storage of paint /stucco solvent during construction of proposed wine processing building. (Rev. 2) Addressed. Metal building. No paint -solvent storage per E. Summey. ii. Show solid waste (non -hazardous) waste receptacle (dumpster), (Rev. 1) Addressed. iii. Show temporary sanitary facilities (porta John), accessible to service vendor, (Rev. 1) Not addressed. iv. Provide /show trapping measure for treatment of vehicle wash waters, (Rev. 1) Addressed. v. Provide /show lined concrete washout adjacent to PCE, (Rev. 1) Partially addressed. Note states: `Actual location of concrete washout to be determined in field at time of building pad pour. See sheet 4 for detail.' Revise Sec. 6, 11" x 17" SWPPP Exhibit to include any on -site fuel storage, portable sanitary facilities, and indicate a preliminary concrete wash -out location. Contractor may change initial location later. DEQ inspections place special emphasis on this item, consistently (concrete washout). (Rev. 2) Partially addressed. Asfollow-up: Provide leader line for concrete wash -out. vi. Provide /show paved construction entrance (PCE). (Rev. 1) Addressed. vii. New: Relocate 21-pg. VAR10 from Sec. 2 to Sec. 11. Once 1-2 pg. DEQ VAR10 coverage letter is received, this document is included with SWPPP at Sec. 2. (Rev. 2) Albemarle will relocate 21-pg. VAR10 from initial SWPPPs to Sec. 11, rev. SWPPPs. Albemarle needs 2 complete print copies of SWPPP with rev. ESC /SWM Plan sheets. Final print copies to include I I" x 17" SWM /ESC Plan sheet inserts (Sec. 4, 5). viii. New: Indicate on -site location of rain gauge. (Rev. 2) Addressed. ix. New: Recommend include inspection frequency listed at VAR10 Part 1.B.4.d.(1/2), since this inspection frequency applies [text image, below]. (Rev. 2) Not addressed. Recommendation withdrawn. d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day: and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. The PPP content requirements can be found in County Code section 17-404. 1. See A /Sec. 6 comments, above. (Rev. 3) Addressed. C. Stormwater Management Plan (SWMP) — (Rev. 3) Prior review comments addressed. VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved pending completion of non -design -related items required for Final Plan Approval (Easements recorded /Print submittal. DEQ VAR10 permit issuance + bonds required for Grading permit). 1. Please ref. 17-303. Proposed Vineyard Processing building is not exempt from VSMP requirements; , (Image removed with Rev. 2 comments.) 2. Provide a SWM Plan that meets content requirements listed at 17-403, that meets water quality and quantity requirements listed at 9VAC25-870-66. Note: pre- /post -development drainage maps are Engineering Review Comments Page 3 of 8 required. Pre -post development hydrologic calculations are required. Technical criteria IIB applies. (Rev. 1) Partially addressed. As follow-up: a. If plan intends to show compliance with discharge to a manmade system, it is unclear that a manmade system exists along Dick Woods Road (SR 637). Provide plan detail. Include topography, labels, narrative, etc. that explain compliance with 9VAC25-870- 66.13. La. Please note, velocity analysis required. If proposed Ex. detention outfall discharges to a poorly -defined or non-existent roadside ditch, then design must consider 9VAC25-870-66.B.3 (Energy balance /Natural stormwater conveyance systems). (Rev. 2) Addressed. Energy balance used. Calculation checked using S = (1000/CN) -10 = 6.39344, and Q1-YR/PosT = 0.1903 cfs. b. Engineering anticipates discharge to a roadside ditch (manmade conveyance), and requests Ex. ditch details, section, and velocity analysis, per 9VAC25-870-66.B.1. (Rev. 2) NA, discharge to natural stormwater conveyance; energy balance required. c. Limits of Anal: Evaluate channel protection to point site DA < 1 % total watershed Area of a receiving stream; ref. 9VAC25-870-66.B.4. (Rev. 2) NA, energy balance. d. (9VAC25-870-66.C. L/2.): Design meets flood protection requirement at 9VAC25-870- 66.C.2.b. Please include this statement on plan sheet C-1.02. (Rev. 2) Addressed. e. It is not immediately apparent why a level spreader (LS) is required. SWM facilities cannot be located within VDOT RW. This facility is not, but appears to lie near a roadside ditch (2.a., above) which will cancel tendency for sheet flow to disperse. (Ditches concentrate flow.) 9VAC25-870-66.D. is not applicable. Recommend remove LS from plans, which may limit design, construction, and SWM Facility easement platting expense. Last: if located too close to a ditch, VDOT equipment may damage this facility during routine ditch maintenance operations. (Rev. 2) Withdrawn, no LS. f Extended detention (DEQ Stormwater Design Specification No. 15): i. Consider design parameters, specifications, and requirements at https://www.swbmp.vwrrc.vt.edu/wp-content/uploads/2017/11/BMP-Spec-No-15 EXT- DETENTION-POND v1-9 03012011.pdfwith care. 1. Ref. Table 15.2, Extended Detention (ED) Pond Criteria a. Calculate /report Tv. VaRRM .xls indicates Tv =4,027.49 ft. Show design provides this Tv. (Rev. 2) Addressed. 14,427 ft3 provided. b. Provide a min. of 15% of the Tv in the permanent pool (forebay, micropool) (does not appear to) (Rev. 2) Addressed. 625 ft3, total, provided. c. Ensure flow path /overall length — 0.4 or more (does not appear to) (Rev. 2) Addressed. Design revised. d. Report Tv ED time (Level 1). (Rev. 2) Withdrawn, review error. e. Ensure vertical Tv ED fluctuation exceeds 4 ft. (Rev. 2) Withdrawn, review error. f. Related to e., label critical elevations on Section through Embankment Detention Basin profile, sheet C-1.03. (Rev. 2) Partially addressed. Asfollow-up: Provide 18" DIA Ex. Det. Pond outfall pipe length, slope, INV in/out on Section through Detention Basin, C-2.01. Please check C-1.02 basin discharge INV out elev. (170 LF at 0.5%) appears to be 789.65'. 2. Related, profile, C-1.03, should reflect Typ. Ex. Detention Pond details shown in DEQ BMP Spec. 15, Fie. 15.1. Profile provided, incomplete. (Please ensure 5.5" orifice is shown on ED profile, at Elev., 791.0') (Rev. 2) Addressed. Design revised. (Please ensure riser dimensions are shown in profile, with critical elev.) (Rev. 2) Addressed. As follow-up: See item 2.f.i.I L above 3. Ref, Sec. 6.3 of BMP Spec. 15, and provide geotechnical information. (Rev. 2) Partially addressed. Asfollow-up: ref. email sent May 06, Engineering Review Comments Page 4of8 2019 11:06 AM, items 10. - 14 (Attached to this Review Memo). (Rev. 3) Addressed. See Notes on C-2.01. 4. Ref. Sec. 6.4, Pretreatment Facility, and revise forebay design. (Rev. 2) Addressed. 5. Provide aquatic bench. (Rev. 2) Addressed. 6. Proposed Ex. detention pond V-ditch shape does not meet Level 1 geometric std. (length /width ratio, or flow path); please revise. (Rev. 2) Withdrawn, review error. 7. C-1.02 label: 4H:1V side slopes. Proposed upslope side slopes are 2H:1V. Check DEQ Spec. 15, Sec. 6.6. -Max. = 4H:1V, or 5H:1V. Please revise. (Rev. 2) Addressed. Scales rev. for consistency: 1" =30'. 8. Ref. Spec. Sec. 6.6, Long Flow Path -Revise, consistent with design spec. (Rev. 2) Addressed. Design revised. 9. Ref. Spec. Sec. 6.5, Adequate Outfall Protection (proposed 15" DIA outfall): Ensure V2-year is non -erosive, i.e., 3.5-5 fps. Provide channel lining, as required. (Rev. 2) Addressed. ii. Ref. Spec. Sec. 8. 1, Construction Sequence: Include steps on plans. (Rev. 2) Not addressed. Ref. Spec.Sec. 8.1 at https://www.swbmp.vwrrc.vt.edu/wp- content/uploads/2017/11BMP-Spec-No-15 EXT-DETENTION-POND v1- 9 03012011.pdf. Review 13 steps (pg. 12 of .PDF). Include relevant steps. If sediment trap is constructed in same location as extended detention pond, ensure ESC Plan and SWM Plan sequence, notes, labels address Step 1. requirements. g. Label 4-5L' 18" DIA outfall pipe (length, slope material) in plan and profile. (Rev. 2) Partially addressed. As follow-up: See also item 2.f.i.1.f I above. h. Plan /profile ED discharge labels are inconsistent: plan, 1511, profile, 18". Revise label/s for consistency. (Rev. 2) Addressed. i. Dimension all riprap (L x W x D), including: ED outfall, forebay stone diaphragm, stone armored swale/s. (Rev. 2) Addressed. As follow-up: Swale typ., with 5:1 side slopes and 2' bottom appears to be 12.0' wide. Swales B, C appear to scale 6'-0" in plan view, C- 1.02. Revise plan view width to scale. j. Provide pre -post development drainage area maps. (Rev. 2) Addressed. k. Show drainage divides that convey 0.75 Ac. turf /1.01 Ac. impervious area runoff to ED. (Rev. 2) Addressed. 1. Include Q2, Qio pre -post development discharge on plans (table format, preferred). (Rev. 2) Addressed. m. If proposed permanent diversion berm at top of cut slope concentrates sheet flow and discharges runoff off -site, ensure concentrated flow is included with post -development routings. (Rev. 2) Partially addressed. As follow-up: Ref. email sent May 06, 2019 11:06 AM, items 1, 4. - 8. (Attached) n. Label floor dimensions of revised Ex. detention pond. (Rev. 2) Addressed. o. Include attached periodic maintenance checklist for Ex. Detention basins on the plan (Ref. VSMH, Ch. 9, Appx. Q. (Rev. 2) Addressed. 3. Sheet 3: Revise Stormwater Runoff Considerations text. Delete statement that there are no stormwater runoff concerns, which implies there are no stormwater requirement requirements. (Rev. 1) Addressed. 4. Note: LOD z 1.205 Ac.: Project requires a DEQ VPDES Construction General Permit (52,486 ft2). (Rev. 1, 2, 3) Comment persists. [Rev. 2, LOD z 2.06 Ac.; Rev. 3, LOD z 2.09 Ac.] 5. 11" x 17" VSMP SWM plan size is unacceptable. Submit conventional full-size plans, 24" x 36". (Rev. 1) Addressed. 6. Revise plan title to: Hillcrest Vineyard & Winery LLC-VSMP/WPO 201900005. (Rev. 1) Addressed. 7. Note: I I" x 17" SWPPP Exhibit (Sec. 6.A.) is acceptable. (Rev. 1) Addressed. Please also see SWPPP comments, above. New 8. C-1.02 /Additional: Engineering Review Comments Page 5 of 8 a. Show /label roof leader line, and release point (appears to be at south corner of building). (Rev. 2) Withdrawn /NA. Building does not have gutters /leader lines per E. Summey. b. Show /label WPO (stream) buffer. (Rev. 2) Addressed. c. Label EP, SR 637. (Rev. 2) Addressed. d. Provide spot shot elevations at EP, SR 637, to guide grading. (Rev. 2) Addressed. e. Label proposed site entrances, use VDOT designation. Provide VDOT entrance detail. (Rev. 2) Withdrawn. Irrelevant comment; this is not a site plan. f. Revise site driveway width to 14'. Engineering recommends an even wider drive aisle. (Rev. 2) Withdrawn. Review error —using wrong scale. Also, see item 2.f.i.7, above. g. Show parking spaces —ref. design requirements at ACDSM. (Link: http://www.albemarle.oriz/upload/imalzes/forms center/departments/community_ development/form s/designn standards _manual/Albemarle _ County_ Design Standards _Manual _2015-04-25_draft.pdf) (Rev. 2) Withdrawn. Irrelevant comment; this is not a site plan. h. Engineering recommends increase separation from south corner of building and drive EP; 1.5' separation is proposed. Engineering anticipates vehicle or building damage may result under proposed design. Engineering recommends bollard at south corner of building, at least 3' from EP. (Rev. 2) Withdrawn. Recommendation not accepted. Site constraints. i. Show limits of proposed 4.20 Ac. Forest /Open space on the plan (consistent with separate easement plat under review as SUB2019-00053). (Rev. 2) Addressed. j. Provide swale Typ. detail (indicate 2-, 10-yr water elev.) (Rev. 2) Addressed. As follow-up: See item 2.i., above. k. Provide swale design (capacity /velocity) calculations. (Rev. 2) Addressed. 1. Define grading at inlet 15" RCP pipe under drive. Provide IP at this location. (Rev. 2) Addressed. in. Proposed drive grade appears to be 6H:IV, or 16.66%. Check to ensure drive design grade does not exceed 16%. (Rev. 2) Withdrawn. Review error —using wrong scale. Also, see item 2.fi.7, above. n. Delete note `Drive slope to be determined in field.' (Rev. 2) Addressed. o. Provide culvert calculations. Culverts must flow in open channel regime (Qio event). (Rev. 2) Addressed. p. Provide vegetative cover hardier than grass for proposed 2:1 cut slope. Ref. ACDSM, Sec. 8.A.2. (Rev. 2) Addressed. As follow-up: Provide Area estimate of disturbed site slopes steeper than 3:1 (ft3), for bonding, construction, inspection. Ref. Note 9, C-1.02: `Plant 1 gal. creeping juniper (Juniperus horizontalis) at V O.C. for soil stabilization on all slopes steeper than 3H:1 V.' q. Notes: i. Third bullet: revise text to read `The areas will remain...' (Rev. 2) Addressed. ii. Fourth bullet: Include Construction Record Drawing (As -built) for VSMP on the plans. Link to .PDF: http://www.albemarle.org/oload/images/forms center/departments/Community Develo pment/forms/Engineering and WPO Forms/WPO VSMP Construction Record Drawi ngs Policy _23Ma. 2y 014.pdf (Rev. 2) Partially addressed. Asefollow-up: Use link to retrieve .PDF. Place image of .PDF on plans so Construction Record Drawings (As -built) for VSMP requirements are listed and visible on plans. iii. Sixth bullet: Revise to include `...and Extended Detention pond,' since Ex. Det. is credited a 15% phosphorus reduction. (VaRRM .xls) (Rev. 2) Addressed. r. Provide leader lines for `forebay with stone diaphragm,' `Riser w/ anti -flotation...' labels. (Rev. 2) Addressed. s. Show proposed SMW Facility /Access Easements. (Rev. 2) Partially addressed. As follow-up: Show proposed SWM Facility Access Easement on plans. Alternatively, include ref. to SUB201900053 (Easement plat) on plans. 9. C-1.01: Label EP, SR 637. (Rev. 2) Addressed. 10. SWM Facility /Access Easement (plat /deed) must be recorded prior to VSMP Plan approval. (Rev. 3) Comment persists. Engineering Review Comments Page 6of8 New 11. C-1.02: a. Storm Flow table: Typo at pre-dev /1-year. Revise to read 0.827 cfs. b. ESC Sequencing: i. Include install sediment trap at sequence step 5 or 6. ii. Sequence item 11: (Rev. 3) Item persists. 1. Retaining walls over 3' high require a building permit. 2. Coordinate with CDD Building Inspections for wall ht. > 3-ft. 3. Label Fetaining wall and provide TW,9W elevations at highest point-. iii. Sequence item 14: Check syntax at `contractor shall ESC methods through sediment filter bag, remove and stabilize sediment.' c. bullet 8: 2.08 Ac. Area of disturbance should match SWPPP, Sec. 1, item 9, Registration Statement. d. Check 18" HDPE basin discharge INV out Elev. (170 LF @ 0.5%). e. Copy Calc. packet 15" DIA 58 LF driveway pipe INV in/out, slope, length data to plans. f. Check Swale A to ensure not in pavement. If 12' wide, provide accurate proposed contours. (Rev. 3) Withdrawn. Gravel drive /staging area consistent with Swale A. 12. C-1.05: Ensure ESC Sequence consistent with C-1.02 13. C-2.01: a. Check stone swale width dimension. Revise plan, consistent with swale typ. detail. b. Label 18" HDPE basin discharge pipe in section view (slope, length, INV, etc.). c. Ref. item 2.f.i.3., above. (GEOTECxtv1CAL) 14. Note: Work within 30' Easement requires coordination with VDOT /VDOT Land Use Permit. (Rev. 3) Item persists. D. Erosion and Sediment Control Plan (ESCP) — (Rev. 3) Prior review comments addressed, save item 25. Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved with expectation final print submittal plans will address (minor text) item 25. 1. Sheet 1: Show and label critical slopes. (Rev. 1) Addressed. 2. 11" x 17" ESC plan size is unacceptable. Submit conventional full-size plans, 24" X 36". (Rev. 1) Addressed. Sheet 2: 3. If 1" = 60', State route 637 scales approx. 13.5' wide. Please confirm road width is accurate (to scale). (Rev. 1) Addressed. Discussed in plan review meeting. 4. Show all roads /travel ways and proposed improvements. Ref, project description, sheet 3: "purpose of this project is to construct a 14,117 sq. ft. wine processing building with a gravel road from a proposed farm road off Route 637 into the property." Neither sheet 1 nor 2 show a gravel road or a proposed farm road.' [emphasis added] (Rev. 1) Addressed. 5. Include newly constructed travel ways (area) that support wine processing in project LOD area calculation. Revise LOD, as necessary. (Rev. 1) Addressed. 6. Label proposed contours. (Rev. 2) Withdrawn /review error. 7. Provide ESC legend. Include PCE in legend. (Rev. 1) Addressed. 8. Include paved washed rack (PCE) detail on plans; ref. p. 8, ACDSM. Link: http://www.albemarle.org/upload/images/forms center/departments/community development/forms/design_ standards_manuat/A lbemarle_County Design Standards _Manual _2015-04-25_draft.pdf (Rev. 1) Addressed. Sheet 3 9. Management Strategies/Sequence of Construction: (Rev. 1) Addressed. a. (MS) 6. Add `with county inspector approval' to end of sentence (for ESC measure removal). b. (SC) 2. Revise to read `install paved construction entrance.' Engineering Review Comments Page 7 of 8 c. (SC) 5. SWPPP, Sec. 11, Delegation of Authority transfers ESC-related and construction -related environmental responsibility from Construction Activity Operator identified in Sec. 1, Registration Statement, to another party. The Owner is not responsible for E&S controls unless responsibility is delegated. Revise SC 5. d. (SC) 5. VPDES CGP Part I.B.4.d. (discharge to impaired waters), and Part ILF.2., specify inspection frequency. Revise SC 5 consistent with VAR10 CGP. Ref. Attached (.PDF, p. 2,11); inspection requirements at Part II.F.3. 10. Sheet 4/Maintenance: Add `with county inspector approval' to end of sentence (for PCE removal). (Rev. 1) Addressed. 11. Please consolidate sheet 4-8 information on fewer plan sheets of typical size (24" X 36"). (Rev. 1) Addressed. New: 12. Sheet 2: Provide deed bk.-pg. ref. to SR 637 for section of Dick Woods Road fronting property. (Rev. 2) Addressed. Sheet 1 13. Provide ownership data, TMP #69-20 (Owner Name /deed bk.-pg. ref.). (Rev. 2) Withdrawn /review error. 14. Show /label existing drive, shown only as a CL. Show approx. actual width. (Rev. 2) Withdrawn. 15. Provide vicinity map (1"=2,000' scale). (Rev. 2) Addressed. 16. Provide TMP zoning. (Rev. 2) Withdrawn /review error. Sheet 3 17. Provide forestal district information. (Rev. 2) Withdrawn /review error. 18. Provide water supply /reservoir information. (Rev. 2) Addressed. 19. Provide source of topography (LS /date of survey). (Rev. 2) Addressed. New 20. Provide Sediment Trap (ST) in location proposed for Extended Detention Basin. 21. Revise ESC Plan legend, notes, labels, sequence, etc. to allow for construction of sediment trap. 22. Provide ST rn ofile. Ref. VESCH, 3rd Edit., 1992, Std. & Spec. 3.13, Plate 3.13-1. a. Provide depth of excavation elevation, floor of ST. b. Provide wet and dry storage elevations. c. Provide weir elevation. 23. ST /Plan view: a. Include floor dimensions. b. Dimension weir (L X W). 24. Provide inlet protection (IP), 15" culvert pipe. 25. Revise ESC Plan legend to include IP. (Rev. 3) Will be reviewed with ESC Plan /Final submittal. 26. Provide dewatering structure detail (filter bag): VESCH Std. & Spec. 3.26. Please ref. email sent 5/13/2019 3:18 PM. Engineering requests 4 print copies of a single consolidated VSMP plan titled Hillcrest Vineyard & Winery LLC - VSMP /WPO201900024 (important) that combines ESC and SWM plans. We need two sets of revised SWM /ESC plan SWPPP inserts (I I" X 17"). Also, wherever project ID WPO201900005 appears on SWM plan, ESC plan, or SWPPP, please revise to read WPO201900024, a reversal from direction provided with last comments, but it simplifies reimbursement for initial WPO201400005 VESCP plan Application. Engineering Review Comments Page 8 of 8 Please submit copies of print plans /SWPPP inserts (as well as SWPPP cover with signed /dated PE -seal) with transmittal cover that states `Not for review; for Approval' to my attention. Thank you Process After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application (SWPPP Registration Statement). DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. Easements must be recorded prior to VSMP approval. Proof of purchase of nutrient credits (if any) is required to receive a Grading Permit. After DEQ coverage is issued, the County can hold a pre -construction conference. Applicants will need to complete the request using a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department--cdengMTo Ifyou have questions /concerns, please contact me atjanderson2@albemarle.org or at 434.296-5832-x3069. Thank you J. Anderson, Engineering Div. WP0201900005 - WP0201900024 Hillcrest Vineyard & Winery LLC 051319rev3