HomeMy WebLinkAboutWPO201800027 Bond Estimates 2019-05-15Project Name: Martha Jefferson Hospital Apartments Stockpile Area VSMP Plan WP0201800027
WPO file number: WP0201800027
TM P(s): 07800-00-00-020M3
Date Estimate Completed: 04-30-19* ( by Collins Engr.; chkd by ja/Alb. Co.)
Stormwater Management Bond Estimate
Item Item No. Unit Unit Cost Cost
Number installed
permanent diversion or ditch
ft
$13.00
$0.00
standard manhole frame top (not inlet)
ea
$500.00
$0.00
drop inlet or grate
ea
$3,500.00
$0.00
manhole structure (per ft. rise)
ft
$450.00
$4,500.00
pipe, rep, cmp (15 to 48")
in d
ES-1,2
MMMMMF EC-1
ft
$65.00
$9,990.00
aggregate base or drainage stone
in d aft L
EL8_0 ft W
156.8 ton
$35.00
$5,488.00
earthwork for trap/basin - Part of E&S bond for basin and riser
height of dam at toe
0 ft
cut at high side
ft
height of fill at face
0 ft
cut at face
ft
length of dam
ft
length of cutoft
ft
top width
ft
width of cut
(area above transition;
0 sf
(area below transition 0 sf
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transitior Oft
(depth below transitioi Oft
(area below transition)
0 sf
(area above transition
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
=ft
JOAL CY estimate)
0 cy
$13.00
$0.00
width of spillway
ft
(spillway stone tons)
0 tons
$50.00
$0.00
structures for basin
riser height
0 ft
riser diameter
0 in
(riser unit price)
$0.00
$0.00
barrel length
0 ft
r
base plate orfdn
$200.00
$0
barrel diameter
0 in
(barrel unit price)
$0.00
$0.00
barrel collars
Mft
$200.00
$0
baffle length
$50.00
$0
trees
0 ea
$275.00
$0.00
shrubs
0 ea
$50.00
$0.00
seedlings (ref. plan sheet 7, Aquatic bench (zone 1) planting schedule for SWM facility- 3ft2 /plant)
940 ea
$5.00
$4,700.00
underdrain (LF)
0 ft
$5.00
$0.00
biofilter soil mix (CY)
0 cy
$45.00
$0.00
trash rack/ anti vortex devices
0 ft
$1,500.00
$0.00
maintenance access road (LF)
850 ft
$50.00
$42,500.00
rip -rap, placed
depth
ft
length
-ft
width
(tons)
0
$60.00
$0.00
survey and layout (price per 0.1 mi.)
acres
basins
$7,385.00
mobilization
$2,500.00
as -built dravrings(per facility)
$2,000.00
$4,000.00
materials testing (per facility)
Mae
ea
$2,000.00
$4,000.00
compaction testing (per dam)
ea
$3,000.00
$6,000.00
manufactured facilities (attach manufacturer's or contractor's price as a base)
$0.00
5/15/2019
Project Name: Martha Jefferson Hospital Apartments Stockpile Area VSMP Plan WP0201800027
WPO file number: WP0201800027
TM P(s): 07800-00-00-020M3
Date Estimate Completed: 04-30-19* t by Collins Engr.; chkd by ja/Alb. Co.)
Stormwater Management Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
installed
cost sum
$91,063.00
contingency
$9,106.30
Total
$100,170
5/15/2019