Loading...
HomeMy WebLinkAboutWPO201800027 Bond Estimates 2019-05-15Project Name: Martha Jefferson Hospital Apartments Stockpile Area VSMP Plan WP0201800027 WPO file number: WP0201800027 TM P(s): 07800-00-00-020M3 Date Estimate Completed: 04-30-19* ( by Collins Engr.; chkd by ja/Alb. Co.) Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch ft $13.00 $0.00 standard manhole frame top (not inlet) ea $500.00 $0.00 drop inlet or grate ea $3,500.00 $0.00 manhole structure (per ft. rise) ft $450.00 $4,500.00 pipe, rep, cmp (15 to 48") in d ES-1,2 MMMMMF EC-1 ft $65.00 $9,990.00 aggregate base or drainage stone in d aft L EL8_0 ft W 156.8 ton $35.00 $5,488.00 earthwork for trap/basin - Part of E&S bond for basin and riser height of dam at toe 0 ft cut at high side ft height of fill at face 0 ft cut at face ft length of dam ft length of cutoft ft top width ft width of cut (area above transition; 0 sf (area below transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitior Oft (depth below transitioi Oft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway =ft JOAL CY estimate) 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft r base plate orfdn $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars Mft $200.00 $0 baffle length $50.00 $0 trees 0 ea $275.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings (ref. plan sheet 7, Aquatic bench (zone 1) planting schedule for SWM facility- 3ft2 /plant) 940 ea $5.00 $4,700.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 850 ft $50.00 $42,500.00 rip -rap, placed depth ft length -ft width (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres basins $7,385.00 mobilization $2,500.00 as -built dravrings(per facility) $2,000.00 $4,000.00 materials testing (per facility) Mae ea $2,000.00 $4,000.00 compaction testing (per dam) ea $3,000.00 $6,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 5/15/2019 Project Name: Martha Jefferson Hospital Apartments Stockpile Area VSMP Plan WP0201800027 WPO file number: WP0201800027 TM P(s): 07800-00-00-020M3 Date Estimate Completed: 04-30-19* t by Collins Engr.; chkd by ja/Alb. Co.) Stormwater Management Bond Estimate Item Item Number No. Unit Unit Cost Cost installed cost sum $91,063.00 contingency $9,106.30 Total $100,170 5/15/2019