Loading...
HomeMy WebLinkAboutARB201700096 Minutes 2017-11-06 ARB-2017-96: Rivanna Solar Project— Special Use Permit Advisory Review (first review) (TM/Parcel 094000000017A0) Proposal: To establish a solar-energy electrical generation facility, with solar panels occupying approximately 90 acres. Location: 2631 Buck Island Road near the intersection of Buck Island Road and Rt. 53 The ARB held a work session to review updated information for the Rivanna Solar project that was deferred from their October 16, 2017 meeting. It was the consensus of the ARB that the revisions are a positive contribution to the screening of the proposed development, but they have not completely addressed visibility from Rt. 53. OTHER BUSINESS ARB-2017-118: UVA Community Credit Union Minor Amendment Staff reported that the circumstances of the project had changed and discussion at the current meeting was no longer needed. Next ARB Meeting: November 20, 2017 Mr. Binsted stated that he would not be able to attend the November 20 meeting. Mr. Van Der Werf stated that he may not be able to attend the meeting. ADJOURNMENT The meeting was adjourned at 2:50 p.m.to the next ARB meeting on Monday,November 20,2017 in Room 241, Second Floor, County Office Building at 1:00 p.m. Albemarle County Architectural Review Board FINAL Action Memo November 6,2017 4