HomeMy WebLinkAboutARB201700094 Minutes 2017-01-16 New
Mr. Binsted seconded the motion.
The motion carried by a vote of 5:0.
The ARB provided the following comments on the signs that have been installed without permits:
11. Revise the City Electric Supply wall sign application to illustrate a design that meets the approved
Comprehensive Sign Criteria. Provide dimensions on the sign drawing defining the distance from
the sign to nearby architectural elements(roof,window, door opening, etc.).
12. Revise the Cville Classic Cars wall sign application to show an accurate location and to meet all
approved Comprehensive Sign Criteria. Provide dimensions on the sign drawing defining the
distance from the sign to nearby architectural elements(roof,window, door opening, etc.).
13. Submit a sign application for the Roberts Home Medical sign that is consistent with all approved
Comprehensive Sign Criteria. Provide dimensions on the sign drawing defining the distance from
the sign to nearby architectural elements(roof,window, door opening, etc.).
14. Submit a sign application for the Builders First Source sign that is consistent with all approved
Comprehensive Sign Criteria. Provide dimensions on the sign drawing defining the distance from
the sign to nearby architectural elements(roof, window, door opening, etc.).
15. Freestanding sign letter and graphic colors shall be limited to Pantone 280 blue, Pantone 301 blue,
Pantone 186 red, Pantone 200 red, black, and white.
16. The freestanding sign shall have a white background.
WORK SESSION
b. ARB-2017-4 Avinity Phase 2 - Initial Site Development Plan (TM/Parcels 091000000016CO3
091000000016E0, 091000000016A0)
Proposal: To construct a residential development with 51 single-family attached units,51 townhouse units,
and one clubhouse on combined 11.886 acres
Location: North of Pebble Drive, west of Route 20 (Scottsville Road), south of the Kappa Sigma
headquarters, and east of the original Avinity development that fronts Avon Street Extended
The ARB held a work session on a revised layout for the southeast corner of the development.In consensus,
the ARB agreed that the revised design was appropriate and was adequate to move forward with a revised
initial site plan.
OTHER BUSINESS
Next ARB Meeting: Monday,February 12, 2018
ADJOURNMENT
The meeting was adjourned at 2:28 p.m.to the next ARB meeting on Monday,February 12, 2018 in Room
241, Second Floor, County Office Building at 1:00 p.m.
Albemarle County Architectural Review Board FINAL Action Memo January 16,2018 3