Loading...
HomeMy WebLinkAboutWPO201800090 Correspondence Erosion Control Plan 2019-01-17 ROUDABUSH, GALE & ASSOCIATES, INC. A. A PROFESSIONAL CORPORATION S p LAND SURVEYING Serving Virginia Since 1956 ENGINEERING LAND PLANNING ENGINEERING.DEPARTMENT SURVEY DEPARTMENT 172 SOUTH PANTOPS DRIVE;STE.A 914 MONTICELLO ROAD JIM L:TAGGART,P.E. CHARLOTTESVILLE,.VA22911 CHARLOTTESVILLE,VA 22902, WILLIAM]:.LEDBETTER;L.S: DON'FRANCO,P.E. PHONE(434)9,794121 PHONE(434)977-0205 'BRIAN D.JAMISON,L.S. DAV,ID M.ROBINSON,P.E: FAX(434)97.9-1681 FAX(434)2965220 KRISTOPHER C.WINTERS;L.S. AMMY M.GEORGE,PLA 1NPO®ROUDA13USH.COM January 17, 2019 • • Mr. Geoff Elsie Department of Community Development 401 McIntire Road, Room 227 Charlottesville,VA 22902 • RE:Erosion&Sediment Control Plan:Project Maintenance for Lochridge Lane Dear Mr. Elsie, A.Stormwater Pollution Prevention Plan(SWPPP) The SWPPP content requirements can be found in County Code section 17-405.A SWPPP must contain(1)a PPP, (2)an ESCP, (3)a SWMP,and(4)any TMDL measures necessary. RESPONSE: There is less than one acre of disturbance for this project. A SWPPP is not required for projects less than an acre. A basic pollution prevention plan has been provided on the plans. This project is small enough that we do not anticipate fuel storage. B.Pollution Prevention Plan(PPP) The PPP content requirements can be found in County Code section 17-404. • Provide a basic Pollution Prevention Plan to address construction waste. RESPONSE: A basic Pollution Prevention Plan has been provided with this submittal. There will be no onsite fuel storage. C. Stormwater Management Plan(SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below.The stormwater management plan content requirements can be found in County Code section 17-403. • Show roadway classification and how you are meeting VDOT drainage manual requirements in section 8.3.2. Are you using 10-yr storm as a secondary road? Show headwater and tailwater requirements are met. RESPONSE: We are using the secondary roadway classification and the 10-yr storm to analyze the culvert at Lochridge Lane. The HW/D ratio for the 10-yr storm is 1.04 shown on sheet 6,48" pipe. Maximum allowable is 1.5. There is a minimum tailwater condition for a 48" pipe but a maximum tailwater condition for a 36". The OP and the proper detail for maximum tailwater has been shown. on sheet 5 along with the tailwater elevation. D. Erosion and Sediment Control Plan(ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. • Correct the Name of the plan, remove the word "and". Plan should read Erosion and Sediment Control Plan: Project Maintenance for Lochridge Lane RESPONSE: The name has been corrected on all pertinent documents. • Address access issues for residents.Add additional controls if needed. RESPONSE: The residents are fully aware of the access issues during construction. There is an older couple that will be put up in a hotel for the duration of construction. Many of the other residents plan on leaving their vehicles on the Earlysville Road side of the Lochridge Lane. Fire& Rescue (Shawn Maddox)came out to have a look and insisted that a staging vehicle on the neighborhood side was not necessary. In case of a medical emergency,crews would be able to perform an evacuation by foot. • Laydown, Overburden, Material Storage, address need for overnight storage and any controls needed. RESPONSE: Laydown,overburden and material storage areas have been identified on the plan. • Wash rack and waste water containment need to be addressed. RESPONSE: Wash rack and waste containment has been addressed with this submittal. • On page 2 of the Erosion Control Narrative, remove the reference to Harvest Moon and Temporary Seed not needed RESPONSE: The reference to Harvest Moon and temporary seeding has been removed from the E&SC narrative. • On page 2 of the Narrative add "if straw mulch is to be used, it must have a tackifier applied to the surface as per VESCH" RESPONSE: The narrative has been updated to include this note. • Include a seasonal seed schedule on the plan RESPONSE: A seasonal seed schedule has been added to sheet S. We thank you for taking the time to review these plans and trust the above adequately addresses your comments. However, please let me know if you have any questions or require additional information. Very truly yours, Dustin E. Greene, EIT