HomeMy WebLinkAboutARB201700032 Application 2017-04-03 -. ComunityDevelopmentDepartrr
4t % Albem ..-
arle o i frity 401 McIntirem
Roacl Charlottesville.VA 22902-4:
5 'Vie Voice:(434)296-5832 Fax:(434)972-4
Planning Application
PARCEL] OWNER INFORMATION
TMP 061Z0-03-00-00200 owner(c): STCVILLE HOTEL INC
Application # ARB201700032
PROPERTY INFORMATION
Legal Description [ACREAGE FLAMING WOK AND DODSON GLASS
r_
Magisterial Dist Rio Land Use Primer. Commercial
Current AFD Not in A/F District I1 Current Zoning Primarii Cl Commercial
APPLICATION INFORMATION
Street Address A 1309 SEMINOLE TRL CHARLOTTESVILLE, 22901 Entered
ii
Judy Martin
Application Type Architectural Review Board , 14/3/2017
Project Springhill/Townplace Suites - Final
Received Date 04/03/17 Received Date Final Submittal Date 04/03/17 Total Fees
10
Closing File Date Submittal Date Final Total Paid la
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type Sub Application Comment
1-Final Site Development Plan 04/03/17 —
APPLICANT/ CONTACT INFORMATION
ContactType Name I Address l City State —1---Zip-1Mrie 1 PhoneC
Owner:Applicant STCVILLE HOTEL INC '1005 BULLARD COURT STE 1C RALEIGH NC
76
Primary Contact MARK DOV.,DY/DALY SEVEN 1420 LEE JACKSON HWY
LYNCHBURG A., V . 2245105
I3 4343857010
Signature of Contractor or Authorized Agent Date
wr
Architectural Review Board Application Z.J1
Part A: Applicant,Contact and Parcel Information
Project Name: 5er►^.5 Fitt / Towime f ( ce SKi } Q.f
Tax map and parcel(s): GI ?, "'6 S-2 Physical Street Address: l 3 S SIr,;, c rat,'
Contact Person: ivk or L Dew A
Business Name: V ok(li S e v R..�1
Address 14 2O Le t h- .Lrb ,, his.-.) City LA s c,‘, b v-r) State v A Zip Z.'iso3
Daytime Phone(`'l34)_3tS-1°l° Fax#( ) E-mail, o.r%i.. y@otkilttvcn.CoA
Owner of Record: S S Q LL C
Address 30 AZ. (j ex-Ion n - 0n4¢ City Lt.or t iu#tC sue'► t(C State VA Zip Z2-atoI
Daytime Phone( ) Fax#( ) E-mail
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review(for a Special Use Permit or a No Fee
Rezoning)
Preliminary/Initial Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $242.00
Building Permit Review $634.00
County-wide Certificate of Appropriateness
Structures 750'or more from the EC,no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# 45117
/J
Fee Amount$ ,'Q75.DD Date Paid y/„�l1 7 By who?, /y. Receipt#/4rr pp cCheck#/O By
County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126
10/2015 Page 1 of 2
OVER—*
Part C: Description of Proposal
Describe your proposal.Attach a separate sheet if necessary.
5 t t Cove . LO-ler
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain(8)folded copies of all plans and documents being submitted.
Only(1)set of building material samples is required. All submittal items, including building material
samples,become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
/1/1,A,A71-- S �3 - 2 - 17
ignature of owner,owner's represen Live Date
or contract purchaser
Ask S. DovkiPy, rgoAeur M&R. 43q- 3$S -76I0
Printed name,Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11/2010 Page 2 of 2
OVER
Ner° ""°i72 South Pantops Drive
Dominion
h. Engineering Charlottesville, VA 22911
A� 434.979.8121 (p)
0
434.979.1681 (f)
9epss DominionEng.com
Transmittal Cover Sheet
To: Margaret Maliszewski Date: 4/3/2017
Principal Planner-ARB
Address: Albemarle County Community Development Transmitted: n By Mail
401 McIntire Road
Charlottesville, VA 22902 n By Hand
From: Michael F. Myers, P.E., C.F.M.
By Email
Application: ARB Submission
Project: Springhill/Townplace Suites n F• or Pick-up
TM 61Z-03-2
Project#:
Quantity Item Description
1 ARB Application for Final Review of a Site Development Plan
1 Check for$1,075
1 ARB Checklist
1 Conservation Checklist
1 Cover Letter with Proposal Narrative
1 Set of Building Materials
1 Comment Response Letter
8 Cut Sheets for Lighting Plan
8 ARB Final Site Plan (Full Size Sets)
8 Architectural Elevations & Floor Plans
8 Site Photos & Rendering
8 Cut Sheets for Lighting Plan
Comments:
Delivered by: n D• ominion
Engineering
n C• lient
Received By: n O• ther
Date:
For Pick-up: J At Dominion
CC: Mark Dowdy Engineering
,�� Itll Architectural Review Board
`. Final Review of a Site Development Plan
Submittal Requirements Checklist
Part A: Applicant,Contact and Parcel Information
Project Name: Sr;nytA;l l I Tow‘AR 0*.cA. 5 ' t 1ti
Tax map and parcel(s): C.1 7. - 0 3'2 Physical street address: 1305 S tMi.".(t Tt %.,
Contact Person: M A r k- Do w el\./
Business Name: Dotty Stvt n Address IK20 LCC Sae.leto H le,y City L7ACL't6.;r'S State VA Zip tHS-lb3
Daytime Phone(434) 3 RS • 10 1 O Fax#( ) E-mail rvtArk. 4.wd1 6) o{
cly s¢va.n, crn,k
Part B: Submittal Requirements
Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated.
A. Written description of the proposal
Q/Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate
specifically how each ARB comment from the preliminary review has been addressed. If there are no
changes proposed, then explain why.
Rr Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1"=20', clearly legible and folded):
[r Location(s) of proposed building(s) on the site.
[+r Location of proposed parking, travelways, walkways and other improvements.
[Mechanical equipment, trash containers, loading and service areas, other similar features and
improvements, and associated screening.
Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient
off-site topography to describe prominent and pertinent off-site features and physical characteristics,
but in no case less than 50-feet outside of the site.
Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
Rf Stormwater management plan.
[Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed
materials, with material and color samples.
Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings, clearly identify revisions made.
I
OVER—.
C. Landscape plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
L7f Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
lEr Existing landscaping to be removed. Include the location, size, and species.
[i Landscape key including all landscape symbols and a description of what they represent.
[Location of existing and proposed tree lines and tree save areas.
E'Location of existing natural features,
LT Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
Er Location and height of above-ground utilities and associated easements, and location of below-
ground utilities and associated easements.
ErStormwater facilities.
Er Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
[37Include tree protection fencing and limits of work on the landscape, grading and E&S plans.
D. Lighting plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
E. Location of all proposed building and site lighting.
❑'r Lighting schedule identifying all proposed light fixtures, poles and brackets.
ErManufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color,finish, and installation height.
[r Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance.
Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations, color perspective sketches,site sections):
Er Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 1/8"=1'-0". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design
EI/Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed
development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and
roof height(s) relative to the natural elevations along the Entrance Corridor.
[ One set of all building materials/colors.
❑ A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
❑'Provide labeled, color, 8-'/z" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the
proposed development as seen from the Entrance Corridor are often useful for gaining a clear
understanding of the proposal. The ARB may require such images in certain cases when other
submitted documents do not answer all questions of building form, building details, materials, context,
topography, and/or visibility.
[ Any additional material that is necessary to address comments made by the ARB at the preliminary
review with a memo itemizing how each of the preliminary comments have been addressed.
[YThe applicant is welcome to submit any additional material that will make the final site development
review more productive. Drawings or other submittal items that clarify topography, visibility, utilities,
landscaping, or other unique or unusual conditions are welcome.
2
OVER
Part C: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a final site development plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided in this application, and all accompanying information, is accurate, true and correct to
the best of my knowledge, and that the attached plans contain all information required by this checklist.
3/ .2.- l I 1
Si�nature of person completing checklist Date
k. S, :Dr W"D 1 / 0j .-1- MGR_ i -34 - `� 5 - 70 t t'
Printed Name/Title Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434) 296-5832 Tel www.albemarle.org revised 10/24/2014
3
OVER
County of Albemarle
Conservation Plan Checklist—To be placed on Landscape Plans
(Handbook,pp 111-284-111-297 for complete specifications)
Th following items shall be shown on the plan:
aildeTrees to be saved;
lLocation
Limits of clearing(outside dripline of trees to be saved);
and type of protective fencing;
tGrade changes requiring tree wells or walls;
Q'Proposed trenching or tunneling beyond the limits of clearing.
2. Markings:
11 trees to be saved shall be marked with print or ribbon at a height clearly visible to equipment operators.
2 No grading shall begin until the tree marking has been inspected and approved by a County Inspector.
3. Pre-Construction Conference:
a' Tree preservation and protection measures shall be reviewed with the contractor on site.
4. Equipment Operation and Storage:
a Heavy equipment,vehicular traffic and storage of construction materials including soil shall not be permitted within the driplines of trees
to be saved.
5. Soi Erosion and Stormwater Detention Devices:
• Such devices shall not adversely affect trees to be saved.
6. Fir
Fires are not permitted within 100 feet of the dripline of trees to be saved.
7. Toxic Materials:
Toxic materials shall not be stored within 100 feet of the dripline of trees to be saved.
8. Protective Fencing:
21 "Nees to be retained within 40 feet of a proposed building or grading activity shall be protected by fencing.
a Fencing shall be in place and shall be inspected and approved by a County Inspector prior to grading or construction.
9. Tree Wells:
S When the ground level must be raised within the dripline of a tree to be saved,a tree well shall be provided and a construction detail
submitted for approval.
10. Tr Walls:
When the ground level must be lowered within the dripline a tree to be saved,a tree wall shall be provided;and a construction detail
submitted for approval.
11. Tr nching and Tunneling:
When trenching is required within the limits of clearing,it shall be done as far away from the trunks of trees as possible. Tunneling
under a large tree shall be considered as an alternative when it is anticipated that necessary trenching will destroy feeder roots.
12. Cleanup:
kr Protective fencing shall be the last items removed during the final cleanup.
13. Da aged Trees:
Damaged trees shall be treated immediately by pruning,fertilization or other methods recommended by a tree specialist.
NOTE:IT IS THE D VELOPER'S RESPONSIBILITY TO CONFER WITII THE CONTRACTOR ON TREE CONSERVATION
REQUIREMENTS.
OWNER S`IGNAT TU E�
(DATE)
CONTRACT PURCHASER SIGNATURE (DATE)
5/1/06 Page 1 of 1