Loading...
HomeMy WebLinkAboutARB201700033 Minutes b. ARB-2017-33: Malloy Ford: Renovation vs. Demolition Staff reported that the Malloy Ford proposal had changed from a renovation of the showroom building to a demolition of the showroom building followed by construction of a new building matching the previously approved ARB design. It was the consensus of the ARB that the change was acceptable. Staff also reported that the applicant was considering changing the treatment of the buildings located behind the showroom from painting to re-cladding in a color that nearly matches the approved color, to be approved as a minor amendment by staff. It was the consensus of the ARB that the change was acceptable and that it could be reviewed and approved by staff. c. Next ARB Meeting: August 21, 2017 ADJOURNMENT The meeting was adjourned at 3:35 p.m.to the next ARB meeting on August 21,2017 in Room 241, Second Floor, County Office Building at 1:00 p.m. Albemarle County Architectural Review Board Final Action Memo August 7,2017 6