Loading...
HomeMy WebLinkAboutARB201700039 Correspondence 2017-07-11 COLLINS anssf CRRETT ST SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com TRANSMITTAL 0 FAX 0 MAIL IN DELIVERY TO: FROM: MARGARET MALISZEWSKI SCOTT COLLINS COMPANY: DATE: ALBEMARLE COUNTY 7/18/17 FAX: TOTAL NO. OF PAGES INCLUDING COVER: PHONE NUMBER: SENDER'S PHONE NUMBER: 434.293.3719 PROJECT/SUBJECT: NORTH POINTE ARB FINAL SITE PLAN ARB201700039 PLEASE FIND ENCLOSED: NO.COPIES DATE DESCRIPTION 8 PLAN 1 LETTER 1 EXHIBIT NOTES/COMMENTS: RECEIVED BY: SIGNATURE DATE COLLINS 20( tRETT ST, SUITE K CHARLOTTESVILLE VA 22902 New 434 293.3719 PH 434 293.2813 FX www collins-engineering.com July 11, 2017 Margaret Maliszewski County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 North Pointe Final ARB Submittal Dear Margaret: Revised plans are hereby submitted incorporating the following changes in response to the items in the May 15, 2017 ARB conditions of approval action letter. 1. The architectural samples have been provided for the tan block and the Night Gray hardi siding. The plan sheets reference the tan block color, manufacturer, and specifications. 2. The architect's elevation drawings have been updated to clearly show the unit offsets. 3. All fence notes are now consistently worded and reference the fence detail on sheet 7. 4. The Callicarpa Japonica is now Callicarpa Americana. 5. Cross-sections were provided to the ARB for the review of the location and density of the existing trees/shrubs, and plans/sections, showing the relationship among the entrance corridor street,proposed retaining wall, topography near the wall and in the buffer, and location of the existing vegetation and vegetation to be removed. Attached are the images that the ARB reviewed at the meeting. 6. The 40' buffer has been shifted into the site to avoid the gravel bed at the base of the proposed retaining wall. 7. The Greenspire Littleleaf Linden is now 2.5"minimum caliper at planting. 8. The total shrubs are 1324, with a 25% maximum for any species of 331. Each shrub species quantity is now below the 331 maximum. 9. The Route 29 retaining wall is now provided in site section 4. 10. Additional bushes have been added close to Route 29 at the south of the culvert(mixed with the trees)to help screen the south side of the culvert from Route 29. 11. Additional bushes have been added between the Redbud and Scarlet Oaks east of the northern end of the culvert. 12. Evergreen trees have been added behind Building 1, 14, 18, and 21 to provide screening and the shrubs behind Building 1 have been swapped from deciduous to evergreen. 13. The work session has been completed and ARB has issued the approval on the Townhouse architectural drawings and elevations. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE