HomeMy WebLinkAboutARB201700052 Checklist - Project Closeout (Administrative) 2017-10-24 ARCHITECTURAL REVIEW BOARD
FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS
CHECKLIST
Please complete this form within 30 days of final action, place in folder and forward to CDA for QC and
status label. CDA will forward to the Imaging Center for digital closeout. Imaging Center will return the
file to the Planning Division once documents are in the Laserfiche Repository.
ARB#Name: ARB-2017-52: UVA Indoor Golf Facility at Birdwood
LEAD REVIEWER: Heather McMahon FINAL ACTION DATE: October 24,2017
CountyView: the following items must be available in CountyView
® Staff report, actions, final approval letter, updated status on Application 1 page
Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file. Please indicate those items on the "Other" lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document; or, if the document is already in digital format, note that it can be saved to LaserFiche. Please provide
the digital location(path/name)of the document in the space provided.
• Application
® Scan ❑ Saved location
❑ Notification letter
n S• can ❑ Saved location
/1 Applicant Correspondence(to/from—including emails; do not include duplicate emails)
® Scan ❑ Saved location Blue highlight=review comments
® Review comments
E. Scan ® Saved location in RMS
® Approved plan(site, architectural and/or sign plan that is marked"Approved") 40ys7 SETS
® Scan n Saved location -t ,Lt xa '21-1l t SLlPfEE7S PFt-i `3/tv
® Action Letter(s), including final approval letter(Certificate of Appropriateness letter)
n S• can ® Saved location in RMS
n ARB presentation display documents (in separate, labeled envelope)
❑ Scan ❑ Saved location
® Review history form
E Scan ❑ Saved location DO NOT SCAN
® Other Items (Please explain) Application completeness checklist
❑ S• can ® Saved location in RMS
® Other Items (Please explain) Landscape Review Checklist
❑ Scan n Saved location DO NOT SCAN
❑ Other Items (Please explain)_Lighting Review Checklist and cut sheets
❑ Scan ❑ Saved location DO NOT SCAN
Ar -r--------------'