Loading...
HomeMy WebLinkAboutARB201700063 Plan - Other (not approved) 2017-11-21 (12)The ARB offers the following comments on the proposal, to be addressed in a work session: 1. Based on the revised submission provided on August 21, 2017, showing a screening system on the north, east, and south sides of the steel frames, provide a revised submittal that shows: a. modified spacing of the proposed horizontal slats, investigating whether the slats should continue down to the top of the parapet The perimeter of the South, East, and North walls will be lined with an architectural screening element. The screening consists of 1” x 6” composite wood boards. The south wall will have 5 screening members and the north side wall will have 8 screening members. We have investigated several screening spacing scenarios including: extending slats from the parapet wall to the array, modifying/varying the spacing of slats, and increasing/decreasing density of slats. The conclusion is that the most appealing while meeting concealing requirements is the following: The composite boards will start directly under the array and be spaced at consistent 6” spacing intervals. Three horizontal slats will be truncated as they meet the array slope. The lowest horizontal screening member will be approximately 5 feet above the parapet wall. This provides an open appearance yet concealing the structural connections of column to transverse frame section. b. how the slats terminate along the top slope of the building frame On the East wall – there are 3 horizontal screening elements that will meet the 2-degree solar array slope. These three elements will be truncated as they meet the array. See elevation drawings for more information. The screening boards are physical attached to the frame columns and the racking purlins. c. a revised color of the screening system that relates better to the existing building’s palette. There are existing contrasting color elements integrated into the south wall. The screening components will be colored to harmoniously match the existing contrasting architectural elements. “Island Mist” by Trex is chosen as the closest match this existing feature. Part B: Section A. Written description of proposal The new vehicle parking garage/showroom at 200 Myers Dr (Colonial Nissan) will have the top floor parking deck covered with a permanent solar array/shade canopy. The shade canopy structure will consist of 5 metallic frame sections that extend approximately 104 ft from the southwest side parking garage wall to the northeast side parking garage wall. The 5 metallic frame components will be spaced at approximately 25ft increments in the southeast to northwest direction. Yielding a foot print square footage of approximately 10,400 sq ft. The structure will be sloped to allow for optimal solar array placement. The sloped feature is accomplished by the northeast column sections being manufactured slightly taller than the south west columns. The highest point of the structure (including array thickness) will raise maximum 13’ – 7 & 5/8” above the current highest elevation of the existing building. The final maximum height from ground will be approximately 43’-1”. The roof of the structure will be entirely covered with a solar photovoltaic array consisting of approximately 480 solar modules. The opaque array will provide electricity to the building and shading for the vehicles. The solar modules will appear a dark blue in color. The metallic frame sections will be galvanized finish. The solar array will slightly over hang the edges of the metallic structure the ensure complete coverage – approximate foot print dimensions are 105’-4” and 96’-9”. The structural frame members of the canopy will be wrapped on 3 sides along the perimeter with composite board screening. The screening will be accomplished by 1”x6” composite boards spaced 12” on center. The boards will be parallel to the horizon and truncated at the array slope where applicable. The screening will extend from the array down to 63” above the shorter parapet wall (and 43” above the taller parapet wall). Part B: Section A. & Part B: Section B. & Part B Section C Galvanized metal frame sections with matte finish “Island Mist – by trexx” composite board slats Galvanized transverse structural purlin sections Galvanized Super purlin rails (solar module racking) Solar modules (blue) Electrical wiring and conduit – placed opposite from road behind frame columns Electrical equipment – inverters, combiner boxes, and circuit breaker panels. Placed inside building with 1 exception: AC disconnect will be adjacent to existing equipment and hidden by existing stairs. www.suntribe.solar 1 Prepared by Sun Tribe Solar, LLC October 3 2017 Colonial Nissan Solar Array ARB Proposal Seeking Certificate of Appropriateness On Revision D of Elevations www.suntribe.solar UPDATED ELEVATIONS – REVISION D ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 2 Frame sections galvanized for durability and silver matte finish Screening elements added based on precedence found on corridor www.suntribe.solar UPDATED ELEVATIONS – REVISION D ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 3 Center column added to reduce front frame size Existing electrical equipment Parallel screening truncated at array slope establishing the horizontal X2 Galvanized purlins 3” wide added for support of screening www.suntribe.solar SCREENING SPACING OF 1”X6” COMPOSITE BOARDS ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 4 South Side Screening Spacing Detail North Side Screening Spacing Detail www.suntribe.solar SCREENING COLOR CHOICE – ISLAND MIST ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 5 Existing parapet wall has accent color features. Harmonious match chosen – located by arrow below among samples www.suntribe.solar NOMENCLATURE OF COMPONENTS ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 6 www.suntribe.solar SOUTH EAST ELEVATION ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 7 www.suntribe.solar SOUTH EVE ARRAY OVERHANG ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 8 www.suntribe.solar CLOSE UP OF SCREENING ATTACHMENT TO RACKING PURLIN ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 9 Truncated screen slats along the corridor www.suntribe.solar SOUTH END SCREENING ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 10 Perimeter screening on East wall follows array overhang to maintain continuity. The array will slightly overhang the frame on the South and North sides www.suntribe.solar NORTH EAST RENDERING – REVISION D ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 11 www.suntribe.solar NORTH EAST ARRAY EVE OVERHANG ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 12 www.suntribe.solar CLOSE VIEW OF EAST END SCREENING ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 13 www.suntribe.solar VIEW FROM PARKING DECK INTERIOR ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 14 www.suntribe.solar UPDATED ELEVATIONS – REVISION D ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 15 Electrical equipment on outside of building will be hidden by existing features www.suntribe.solar SITE PLAN – UNCHANGED ARB-2 01 7 -63 | Col o ni al Nissa n So la r Arra y |Albe m arl e Entr y Co rr ido r 16 Galvanized finish minimized by distance from corridor. Will appear silver and matte COLONIAL AUTO CENTER SOLAR 150.0 kW AC, 173.6 kW DC 100 MYERS DR. CHARLOTTESVILLE VA 22901Site Plan - IsometricM01.19A2372SITE PLAN - ISOMETRICNTS1M01.1A TAS 06/16/17 RPB 06/16/17 SHEET 1 OF 4 CONTACT: Ryan Blake (Ryan.Blake@suntribesolar.com)EXTERIOR FINISH SCHEDULE LEGENDNO.MATERIALSCOLOR1SOLAR ARRAYBLUE2CANOPY FRAMESECTIONSGALVANIZED3SUPER PERLINGALVANIZED4COMPOSITE BOARDSISLAND MIST31GENERAL NOTES:1. VISIBILITY OF ALL MECHANICALEQUIPMENT FROM THE ENTRANCECORRIDOR SHALL BE ELIMINATEDRUN CONDUIT ON BACKSIDE OF FRAME(HIDDEN FROM VIEW)B TAS 08/03/17 RPB 08/04/17 FRAME SECTIOSN LOWERED AND FINISHEDTYPICAL 6" COMPOSITEBOARD SCREENINGWRAPPED ON 3 SIDES4C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED & SCREENING ADDED D RPB 10/03/17 RPB 10/03/2017 MODIFIED SCREENING COLONIAL AUTO CENTER SOLAR 150.0 kW AC, 173.6 kW DC 100 MYERS DR. CHARLOTTESVILLE VA 22901Site Plan - TopM01.29A23796'-9"105'-4"39'-2"SITE PLAN - TOP VIEWSCALE:1:2501M01.2A TAS 06/16/17 RPB 06/16/17 SHEET 2 OF 4AC DISCONNECT(HIDDEN FROM VIEW BY STAIRWELL)CONTACT: Ryan Blake (Ryan.Blake@suntribesolar.com) B TAS 08/03/17 RPB 08/04/17 FRAME SECTIOSN LOWERED AND FINISHED C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED & SCREENING ADDED D RPB 10/03/17 RPB 10/03/17 MODIFIED SCREENING COLONIAL AUTO CENTER SOLAR 150.0 kW AC, 173.6 kW DC 100 MYERS DR. CHARLOTTESVILLE VA 22901Site Plan - SoutheastM01.39A23743'-1"39'-6"SITE PLAN - SOUTHEAST ELEVATIONSCALE:1:1001M01.3A TAS 06/16/17 RPB 06/16/17 SHEET 3 OF 4 CONTACT: Ryan Blake (Ryan.Blake@suntribesolar.com) B TAS 08/03/17 RPB 08/04/17 FRAME SECTIOSN LOWERED AND FINISHED C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED & SCREENING ADDED D RPB 10/03/17 RPB 10/03/17 MODIFIED SCREENING4'-6"7'-6" COLONIAL AUTO CENTER SOLAR 150.0 kW AC, 173.6 kW DC 100 MYERS DR. CHARLOTTESVILLE VA 22901Site Plan -SouthwestM01.49A23739'-6"29'-5"SITE PLAN - SOUTHWEST ELEVATIONSCALE: 1:2501M01.4A TAS 06/16/17 RPB 06/16/17 SHEET 4 OF 4 CONTACT: Ryan Blake (Ryan.Blake@suntribesolar.com) B TAS 08/03/17 RPB 08/04/17 FRAME SECTIOSN LOWERED AND FINISHED C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED & SCREENING ADDED D RPB 10/03/17 RPB 10/03/17 MODIFIED SCREENING Screening elements will butt against the solar racking purlin and all elements will be in that plane Module rises 1” above top of racking purlin Racking purlin attaches directly to canopy purlin – perpendicular Solar RackingCanopy Purlin Screening attached to columns Screening attached to purlins, racking, and quarter support Racking purlin details for edge and interior racking. The Edge purlin to the right will be visable from 29 and the screening will also attach here When the screening element reaches the top of the edge of racking purlin the length will stop Colonial Auto Center Solar 150.0 kW AC, 173.6 kW DC 100 Myers Dr. Charlottesville, VA 22901Site PlanM019A136A TAS 06/16/17 RPB 06/16/17 SHEET 1 OF 1 REV DRAWN APPROVED DESCRIPTIONPROJECT #:253'342'CONTACT: Ryan Blake (Ryan.Blake@suntribesolar.com)SITE PLAN SCALE: 1:6251M01Myers DrUS Route 29