Loading...
HomeMy WebLinkAboutARB201700063 Plan - Revision Architectural Review Board Approval 2017-11-06 Part B: Section A. Written description of proposal The new vehicle parking garage/showroom at 200 Myers Dr(Colonial Nissan)will have the top floor parking deck covered with a permanent solar array/shade canopy. The shade canopy structure will consist of 5 metallic frame sections that extend approximately 104 ft from the southwest side parking garage wall to the northeast side parking garage wall.The 5 metallic frame components will be spaced at approximately 25ft increments in the southeast to northwest direction. Yielding a foot print square footage of approximately 10,400 sq ft.The structure will be sloped to allow for optimal solar array placement.The sloped feature is accomplished by the northeast column sections being manufactured slightly taller than the south west columns.The highest point of the structure (including array thickness) will raise maximum 13'—7& 5/8" above the current highest elevation of the existing building. The final maximum height from ground will be approximately 43'-1". The roof of the structure will be entirely covered with a solar photovoltaic array consisting of approximately 480 solar modules.The opaque array will provide electricity to the building and shading for the vehicles.The solar modules will appear a dark blue in color.The metallic frame sections will be galvanized finish.The solar array will slightly over hang the edges of the metallic structure the ensure complete coverage—approximate foot print dimensions are 105'-4" and 96'-9".The structural frame members of the canopy will be wrapped on 3 sides along the perimeter with composite board screening. The screening will be accomplished by 1"x6" composite boards spaced 12" on center.The boards will be parallel to the horizon and truncated at the array slope where applicable.The screening will extend from the array down to 63" above the shorter parapet wall (and 43" above the taller parapet wall). Part B: Section A. & Part B: Section B. & Part B Section C Galvanized metal frame sections with matte finish "Island Mist—by trexx" composite board slats Galvanized transverse structural purlin sections Galvanized Super purlin rails (solar module racking) Solar modules (blue) Electrical wiring and conduit—placed opposite from road behind frame columns Electrical equipment—inverters, combiner boxes, and circuit breaker panels. Placed inside building with 1 exception: AC disconnect will be adjacent to existing equipment and hidden by existing stairs. t `L Al ? C 4r� The ARB offers the following comments on the proposal,to be addressed in a work session: 1. Based on the revised submission provided on August 21, 2017, showing a screening system on the north, east, and south sides of the steel frames, provide a revised submittal that shows: a. modified spacing of the proposed horizontal slats, investigating whether the slats should continue down to the top of the parapet The perimeter of the South, East, and North walls will be lined with an architectural screening element. The screening consists of 1" x 6" composite wood boards.The south wall will have 5 screening members and the north side wall will have 8 screening members. We have investigated several screening spacing scenarios including: extending slats from the parapet wall to the array, modifying/varying the spacing of slats, and increasing/decreasing density of slats.The conclusion is that the most appealing while meeting concealing requirements is the following: The composite boards will start directly under the array and be spaced at consistent 6" spacing intervals. Three horizontal slats will be truncated as they meet the array slope.The lowest horizontal screening member will be approximately 5 feet above the parapet wall.This provides an open appearance yet concealing the structural connections of column to transverse frame section. b. how the slats terminate along the top slope of the building frame On the East wall—there are 3 horizontal screening elements that will meet the 2-degree solar array slope.These three elements will be truncated as they meet the array. See elevation drawings for more information. The screening boards are physical attached to the frame columns and the racking purlins. c. a revised color of the screening system that relates better to the existing building's palette. There are existing contrasting color elements integrated into the south wall.The screening components will be colored to harmoniously match the existing contrasting architectural elements. "Island Mist" by Trex is chosen as the closest match this existing feature. rL ![7L117 LA'S 4114 • . • m M O Z I 0 a.A �u o� �o 2 — 3 m F F / A • (/1 REV DRAWN APPROVED DESCRIPTION ^�f (.n COLONIAL AUTO CENTER SOLAR A TAS 06/16/17 RPB 06/16/17 SHEET 2 OF 4 3 N a B TAS 08/03/17 RPB 08/04/17 FRAME SECROSN LOWERED AND FINISHED CtC TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED&SCREENING ADDED 2.6204 150.0 kW AC,173.6 kW DC D RPB 10/03/17 RPB 10/03/17 MODIFIED SCREENING v 1 V• 18; 100 MYERS DR. CONTACT Ryan Blake(Ryan B1ake0suntrIoesolar com) CT' CHARLOTTESVILLE CD VA 22901 m 0 0 C CDD a ro i I " 1 car i T� 1 m r m rJ 11 NJ C') , 0 - (11) 0I CD co ' D 0 r/ r/ 0 • v V)= CfQ a' (CD It) . Q r) \ (D- 5 N a) � � m min ° �° a) C 3:1 Cr- -, 3 ) a) = 0 Do -ri Cr Xml el- M _ . m / a)\ / , ' 1'-----,... Cl) meemmi CA) --._,.. . 0 ■®®■■ muff 1:13 ( CD E, 1 O O.. j �/• AID k I UU x cr O O O <0'Q -3 a O ,f Z3 O Z O O_ 5 !l _, / cn rri N) liz v v) r fD —* dt2 c i to cu 0 ;y` -O '0 -s 041. �5 C C ` b p n G -a CD Q `i. -o • ().0 dp C) Q Lil CU = 7 (d O 3 r+ 5 r+° c, T O (1) (D ", m (D C!Q Q N (I) m � 'Ico �, j� ` V x1 I \ 1,,, Oil Oil CO t -F ! J l ..7.1,..... NO L ___. { `LCI I� F---„,....., .„,1._.y. i _ , c: Z c" "' .. C 78 NJ A.--"ii V ,L.,t- 1,,,,,,,--- -,, Y ii ', i , , ,-A--- -LI ' '''i . • t/) CD CD 0 citl=. D O 70 � — CD CD ) < : - (-1 Cl) O O•0 n Q _, O �o s r-r Cl.)r0• -a• N D o D —• rn r _ CD O 0) CO O " r_-F -0 0 O �• cu M a) — cn r l CD D CD . * I V) • C ....A, D n po a -141 1 Cl) rD 0 M 0 5 M DT 0) CO CD Z cn 0 G) CD QC) CD = V) I1 -0 ; 1 1 5' 1 co > Cl) n -0 1 il) I CL°D G)Z _ _____ ____ _ 11 1 CD°5. 0 -------____ _ III I i k I 6 i-1 >< 01 I 11,,i,11 , n , 1 0 , i l I t 11111 1111 ; ; z o, 0 v) 1 5:" cn I 0. M CD 1 : ( I • cn CO 1 0 _ — 1 1 <3 0 ______ _______ I , I 0 > i i 1 n —=..._ co , 0 , cn -0 V) SD 1 0) 1 = 0..) to 4 o ? CD ^. CD -- N) ....1. k Z CS _ ' v) -) ..... -- ra 0 ot, ..... - z,-t I •,... , :. '', ' .: :...,,-.-.:: '''''''' , a) at) M a:- .. . . .... , ,, ..., a) ro ,,,,. 4,..„. , Lt4.:.„!. :'' : ' C2- ,-t- Z i., Cr '-'-: 4, ' o n ET I- . .., . . (8_ . „ . . . . ., . ,. , ,..„. —1 v, 0 . . c -0 c rs , 13 -% 70 ' . - '•c o = m a t , ..., .. , .,,... . ,_. , ... .. .,...,,., .,. m . •. • ...,'.et.r. ''.'''. .z.,-,.' r1,,t . . . .. .. ... _. , . .._ . ,. ... .. .— , . .. . 0 K -0• - '., . ' , , I 0 Z m Z r ,,' ' 7'r r."''''r ,', . ' r 7 ' '"' ''.''' .6.i. ',..;', ',',.. '.,-. 1::',-*r_ " '1...._:. -? ..,. . 0) 0 4'0' I .4C • • .. . '. t..?".; - ,, ,,,:,.-. --- ., _. •k, .,,.„.r._ .....:- ., i z 1,. . ., . . . . . . 1.., * : n . 11.) r./1 / t‘) -..- ' IIJ .--' k,c, -, a) fit Q.. en AT 0 , , a -.* Ni at a .)., fA, 01 rD 1.1 70 i1 7v z G rn n z m w ' 10 0 w i I A•••• * 4110 C = I -10,-+ (t) >i o , ET , —I M 0 M r- rn < > -i - Z (i) 1 0 i I --Ti X 3 o ,.. .. rn . ... , , , N ., N .•_ NJ • J • .1 • . I •-- • \ i < ., (fl ....Z 0 ' Z 0 . rii 0* , , . g. 2,2 ,,,= I • 2 g <q L. 74 T I / . , . , I • .=.: i i E / I 8 •%! Ca: C aT ND In _._. .. t. - -.) co co cp ,-4- 6 * ' co a o E cr --; en 0 w CO r- \ )u, i I01 III t = . rn o (n O m A rn I- rn 0 Z r IILC�l ___� REV DRAWN APPROVED DESCRIPTION COLONIAL AUTO CENTER SOLAR A TAS06/16/17 RPB06/16/17 SHEET 3OF4 a 8 TAS 08/03/17 RPB 08/04/17 FRAME SECTIOSN LOWERED AND FINISHED C O r '4,�as C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED&SCREENING ADDED ^ ~ D RPB 10/03/17 RPB 10/03/17 MODIFIED SCREENING N "t 150.0 kW AC,173.6 kW DC V F-�• 100 MYERS DR. CONTACT Ryan Blake(Ryan.Blake@suntrIbesolar.com) n C CHARLOTTESVILLE (D VA 22901 ....... .....„ . 414 , 0 , :2, „.. 7, m `R 17 I I,—nt Z rn 0 C I -I : rn I- m 0 FC ' Z H-1:: H c: / IA / r1 v) REV DRAWN APPROVED DESCRIPTION COLONIAL AUTO CENTER SOLAR A TAS D6/16/17 RPB 06/16/17 SHEET 4OF4 3 c LA a B TAS 08/03/17 EPA 08/04/17 FRAME SECTIOSN LOWERED AND FINISHED v O �+N AO C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED&SCREENING ADDED 9 h p B j N % 1 �/ 150.0 kW AC,173.6 kW DC D RPB 10/03/17 RPB 10/03/17 MODIFIED SCREENING ^ f-. 100 MYERS DR. CONTACT Ryan Blake(Ryan.Blake@suntrlbesolar.com) L4 CHARLOTTESVILLE �/` (p VA 22901 / ......, . i \ 15 ST,,41 7/119 414 , .,q. 400040% rn P'! • 14/##$##$#% NI \ 1#0040$0000% z P,"PI \„,(w.4 SOSOOOOS SO% (7) ?wk10000000####% 0 ” SSOSOSOSS es 5 #S S+ SOS SOS 00 E A AtiAAAAAAAAAA 0 71'\\*01411%47011r n N 1 VOS00000%00# 00SSOSt + S ttk,\:,40040000 t \ 0000000 4 \ yo#000 ..„... . , .ff „AtASA — ..-. = .al 1%Of S r`,1 n 2 M. z 0 en.4 r.' z 0 SO i---:" g G) 3 g E c,m 4 0 0 •Ni V) REV DRAWN APPROVED DESCRIPTION g N, COLONIAL AUTO' CENTER SOLAR SHEET I OF 4 A Z S-7" ,, :' i. B TAS 08/03/17 RPB 08/04/17 FRAME SECTIOSN LOWERED AND FINISHED p C TAS 08/18/17 RPB 08/18/17 FRAME GEOMETRY/FINISH MODIFIED&SCREENING ADDED I--` 150.0 kW AC,173.6 kW DC D RPB 10/03/17 RPB 10/03/2017 MODIFIED SCREENING 1 '1' '-." Et Cr' CHARLOTTESVILLE ' rD VA 22901 i., r ilif ,01/ ‘4,,, .1„; f :),.7. Pt-, A-I I M. v Q rn CrrD rn f o CAD < j . . N D N -� C� '� ,, r CD CD N ' �� f: Z -1 3 �, 7 i I W I. , a ...- it` i f / d I . f/.. i'4,.4.,...,:....401r i .. , 6 * 2. ,,iii j? 44 , . . , Z .. ♦ 1 I. I ja:•v t ,.,a ♦ V ai �, n / 4 �r i dY d. m r4 w ! t • • r a/ e A %It: • -/ ////, i �. G 'r s _ . 1 .b '+, ..,. to w n rn v \ ro '',..) 52 r . "EV DRAWN APPROVED DESCRIPTION �, Colonial Auto Center Solar O rf Y„ o w� 4`� COMK*PYan 9.4e jNyan&We4wnv.4r4n.:«n� a G n M��/� 350.0 kW AC,173.6 kW DC 2 X 100 Myers Dr. 0 Charlottesville,VA 22901 I V . , •• ., . . . cP," ; r , . •, , . , • .. . , f > e AA 2 t i �' . r ' f 1 .1 ipc w f • <a ♦r 4....� .4 rpf f c w �.l�r ���' c t`:jj �Q , A(47 'le' .*. • l .2::' i,47.1/"4‘,..1 ' 6 ' IP A e.,„‘ • / c .r ,. / , ..... .4,7_,.:'Alkiiiie • '. • III• 1 ;, . I I. "/ „,, ,,:l. ' • *' . * .. - A6. Si, y�~`may r _ if 4 ew ? J *?.• , • V O., 4 .Y 6', t� 0 e fi a D ti r t Z ` Ni `, J p ® DRAWN APPROVED DESCRIPTION 3 9 Colonial Auto Center Solar RPB 06/16j1] SHEET I OF ry O ,`�� --- CONTACT Ryan Blake(Ryan BlakeOsun[ribesolar,com) OA ►��t �• �` 150.0 kW AC, 173.6 kW DC -= 100 Myers Dr. === (p Charlottesville,VA 22901