Loading...
HomeMy WebLinkAboutARB201800153 Correspondence 2018-12-11Heather McMahon From: Heather McMahon Sent: Tuesday, December 11, 2018 4:01 PM To: Michele; Christopher Perez Cc: Margaret Maliszewski Subject: RE: Deferral Fwd: [EXTERNAL] Fwd: Longhorn Charlottesville Albemarle Co Received, thank you. Please be in touch when you would like the deferment to end/when you are ready to resubmit. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Michele <michelew@ldreeves.com> Sent: Tuesday, December 11, 2018 3:52 PM To: Heather McMahon <hmcmahon@albemarle.org>; Christopher Perez <cperez@albemarle.org> Cc: Margaret Maliszewski <MMaliszewski@albemarle.org> Subject: Deferral Fwd: [EXTERNAL] Fwd: Longhorn Charlottesville Albemarle Co Requesting a deferral for LongHorn. Please see the message below from Jack DeGagne, Darden Site Development Manager. Thanks, Michele "Shelly" Wright Ph 540.969.8221 michelewPIdreeves.com Begin forwarded message: From: Jack Degagne <JDegagne@darden.com> Date: December 11, 2018 at 3:41:10 PM EST To: Michele <michelew@ldreeves.com> Cc: Robert Hey <RHev@darden.com>, Jason Holland <JHolland@darden.com> Subject: RE: [EXTERNAL] Fwd: Longhorn Charlottesville Albemarle Co Michele, Please let Heather know that we are deferring application to a later date as we revise landscape and provide additional plans. Not sure if we will go with a concept plan or prelim. site plan. Give me a call to discuss. Jack DeGagne, Site Development Manager Darden, Inc. 1000 Darden Center Drive Orlando, FL 32837 407-342-6781 cell Email: idegagne@darden.com From: Michele [mailto:michelew@ldreeves.com] Sent: Tuesday, December 11, 2018 11:39 AM To: Jack Degagne <JDegagne@darden.com> Subject: [EXTERNAL] Fwd: Longhorn Charlottesville Albemarle Co Below is an email I just received from the ARB staff person. She is checking back because of the additional submission requirements in order to stay on the ARB agenda for 01/07. We are almost out of time to submit the additional materials. I fully understand we are on hold! Thanks, Michele "Shelly" Wright Ph 540.969.8221 michelew@ldreeves.com Begin forwarded message: From: Heather McMahon <hmcmahon@albemarle.org> Date: December 11, 2018 at 10:49:36 AM EST To: Michele <michelew@ldreeves.com> Cc: Margaret Maliszewski <MMaliszewskipaibemarle.org>, Christopher Perez <cperez@albemarle.org> Subject: RE: Longhorn Steakhouse Hi Michele, I'm following up on Chris' email (below) from December 41h to inquire whether you and your client wish to move ahead with the ARB submission we received November 261h and that is docketed for the January 7th, 2019 ARB meeting. I just want to be clear that there are two options for moving ahead with your ARB application as it stands: I review the materials you have submitted as a Concept Plan/Advisory Review. The ARB then makes its recommendation to the Site Agent (i.e., Chris) in regards to the Special Exception you are requesting. You defer this ARB application until all materials are received for a complete review, either as a Concept Plan/Advisory Review or as Preliminary Site Plan review. If you choose the first option, I want to be clear that staff has reservations about the configuration of the ramp proposed for the Entrance Corridor, Route 29. Without having undertaken a full review of the proposal as yet, I cannot say definitively whether we will support this feature in our staff report to the ARB. If you choose to defer, I need an email response from you saying as much. Regardless of which option you choose, I would like a response indicating your decision by tomorrow at close of business in order for me to provide a staff report for the January 7th ARB date. If I do not hear from you by tomorrow, I may not have your staff report done in time for the meeting on January 7th (due to the holiday schedule) and your item will be rescheduled for the next meeting. Please let me know at your earliest convenience how you wish to move forward. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Christopher Perez Sent: Tuesday, December 04, 2018 11:53 AM To: Michele <michelew@ldreeves.com> Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Andrew Gast -Bray <agastbrav@albemarle.org> Subject: Longhorn Steakhouse Michele, RE: Longhorn Steakhouse As discussed the initial site plan is still deferred and shall be fully revised and reviewed prior to initial site plan approval. The most recent submittal was a revision of the variation/SE request and the plan provided is to be used as a concept plan for ARB and BOS consideration. Heather has provided the following guidance: "After some consideration, Margaret and I believe we can take the present application to the ARB as a Concept Plan/Advisory Review [for a Special Exception Request] on January 7. However, the submission still fails to meet the checklist for a Concept Plan/Advisory Review in one regard: the site plan you submitted is missing "Existing and proposed topography and conceptual grading drawn with contour intervals of 5-feet or less, and with sufficient offsite topography to describe prominent and pertinent off -site features and physical characteristics, but in no case less than 50-feet outside of the site," noted in section B.B. If you can provide me this information before December 10 at the latest, and preferably by this Friday, December 7, my staff report and review will be complete; if not, then my staff report will mention this lack of data. It may mean that my staff report recommends that the applicant revises the application to provide this information for a subsequent review, or the ARB may ask for such information at the meeting. I just want to make you aware of that. One more thing: although Margaret, Chris, and I have not undertaken a full review of this submission, we are aware of the ramp feature that is proposed for Rt. 29, to provide bicycle and pedestrian access directly to the site from the right- Heather McMahon From: Christopher Perez Sent: Tuesday, December 04, 2018 11:53 AM To: Michele Cc: Heather McMahon; Margaret Maliszewski; Andrew Gast -Bray Subject: Longhorn Steakhouse Michele, RE: Longhorn Steakhouse As discussed the initial site plan is still deferred and shall be fully revised and reviewed prior to initial site plan approval. The most recent submittal was a revision of the variation/SE request and the plan provided is to be used as a concept plan for ARB and BOS consideration. Heather has provided the following guidance: "After some consideration, Margaret and I believe we can take the present application to the ARB as a Concept PlanlAdvisory Review Cfor a Special Exception Request] on January 7. However, the submission still fails to meet the checklist for a Concept Plan/Advisory Review in one regard: the site plan you submitted is missing "Existing and proposed topography and conceptual grading drawn with contour intervals of 5-feet or less, and with sufficient offsite topography to describe prominent and pertinent off -site features and physical characteristics, but in no case less than 50-feet outside of the site," noted in section B.B. If you can provide me this information before December 10 at the latest, and preferably by this Friday, December 7, my staff report and review will be complete; if not, then my staff report will mention this lack of data. It may mean that my staff report recommends that the applicant revises the application to provide this information for a subsequent review, or the ARB may ask for such information at the meeting. I just want to make you aware of that. One more thing: although Margaret, Chris, and I have not undertaken a full review of this submission, we are aware of the ramp feature that is proposed for Rt. 29, to provide bicycle and pedestrian access directly to the site from the right-of-way. While we believe this connection is important, we believe this design solution is not appropriate for the Entrance Corridor and we will not recommend approval of the site plan to the ARB given the magnitude of this feature on the Entrance Corridor. We encourage you to find alternate design solutions that would require less pavement and railing. Please let me know if you have further questions." I would like to use this opportunity to discuss the proposed pedestrian and bike connection. Whereas you have provided a compact 10' shared multi use path from the sidewalk along the frontage to the site, and moved a long way towards meeting the suggestions of staff, we think some improvements will improve what you are providing and more likely to receive endorsement from the pertinent boards and commissions. After an initial review staff does not feel this design forwards the intent of the 10' shared multi use path because it is not convenient for cyclists to use. The short switchbacks require riders to get off their bikes and walk up the hill. Staff thinks that there is a better, more usable design that would make it more convenient for all users. Additionally, I have a feeling this design will not be aesthetically pleasing to the ARB upon their review of the profile due to the large concentration of pavement and railings fronting the EC (as discussed above). To these ends, I offer the following suggested change: Provide a 6' wide sidewalk along the access road south of the site, provide a sidewalk min 5' bordering the parking (I'd prefer 6'), and replace the proposed 30' ramp with a 5' wide staircase accessing the frontage (see below). ti .1 '4 1 1 and and MIA W, Let me know if you have any questions. Thank you Christopher Perez I Senior Planner Department of Community Development lCounty of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 From: Christopher Perez Sent: Friday, November 30, 2018 4:14 PM To: 'Michele' <michelew@ldreeves.com>; Heather McMahon <hmcmahon@albemarle.org> Cc: Jack Degagne <JDegagne@darden.com>; Margaret Maliszewski <MMaliszewski@albemarle.org> Subject: RE: ARB2018-153: Longhonr Steakhouse Initial, resubmission -- application incomplete Michele, I have some additional feedback on revisions to the plan that I will send you on Monday... please wait till you hear from me before you make a decision on your next move with this plan.... Thank you Christopher Perez I Senior Planner Department of Community Development lCounty of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 From: Michele <michelew@ldreeves.com> Sent: Friday, November 30, 201812:48 PM To: Heather McMahon <hmcmahon@albemarle.org> Cc: lack Degagne <JDegagne@darden.com>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Christopher Perez <cperez@albemarle.org> Subject: Re: ARB2018-153: Longhonr Steakhouse Initial, resubmission -- application incomplete Ok. We are determining our best and most efficient course of action. We have everything available except the drainage and grading and may decide to revise those immediately. Jack or I will update you. Thanks, Michele "Shelly" Wright Ph 540.969.8221 michelew@ldreeves.com On Nov 30, 2018, at 10:02 AM, Heather McMahon <hmcmahon@albemarle.org> wrote: Hi Michele, From our previous email conversations, I thought that you intended to submit a full, revised Initial Site Plan set for review to both Planning staff (i.e., Chris) and to ARB staff; in which case, for the ARB review process, your revised project would undergo the same level of review (i.e., full board review) as your first submission. The checklist for a Preliminary Review of a Site Development Plan (which we also use for Initial Site Plans) can be found here. I want to draw your attention to Part 13.13; what you have submitted is missing the criteria for: existing and proposed topography; location and size of existing proposed utilities and easements; and conceptual stormwater management plan. Without this data, my review of an Initial Site Plan cannot be complete. I have conferred with Chris, and I understand that you have submitted this in consideration of a special exception. While the data your provided may suffice for such a review as a special exception, it does not for ARB review of an Initial Site Plan. What you have submitted more closely aligns with the requirements for an ARB Concept Plan/Advisory Review, the checklist for which can be found here. We could take this to the ARB on January 7, 2019 as a Concept Plan, but you would still need to come to the ARB again in the future with a full Initial Site Plan set. So, my recommendation is that you defer indefinitely until you have a full Initial Site Plan Set in hand. You will need to respond to this email and inform me that you wish to defer. If I hear from Chris in the near future that what you have submitted meets his requirements, then we will re-evaluate how to move forward. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.ore From: Michele <micheiew@idreeves.corn> Sent: Friday, November 30, 2018 9:18 AM To: Heather McMahon <hrncrnahon@albemarle.org> Cc: Jack Degagne <JDega E.e@darden.co n> Subject: Re: ARB2018-153: Longhonr Steakhouse Initial, resubmission -- application incomplete Heather: We are on hold with the engineering related site plan review until the Special Exception is approved. Since we have significant layout changes due to the mandated building position change and new multi -use path, we do not want to do grading and drainage revisions until we at least have the first Special Exception review for this week's resubmission. Can the ARB progress without grading and drainage plans? Thanks, Michele "Shelly" Wright Ph 540.969.8221 michelew@ldreeves.com On Nov 29, 2018, at 3:22 PM, Heather McMahon <hmcmahon@albemarle.org> wrote: Hello Michele and Jack, I have just checked your application package for completeness and it is incomplete. Review cannot commence until the missing information is provided and the application is deemed complete. 8 hardcopies of a complete site plan set are required for a full review of an Initial Site Plan. Your scheduled ARB meeting date may be postponed if copies are not received in a timely manner. Please see the attached checklist for the areas in which your application is deficit. Furthermore, your previous submittal of an Initial Site Plan included the following: Sheet # Drawing Name Dra Dat, C1.1 Cover Sheet 8/2' C2.1 General Notes/Tree Conservation Plan 8/2 C2.2 Demolition Plan 8/2 C2.3 Site Plan 8/2- C2.4 Grading Plan 8/2 C2.5 Drainage & Utility Plan A 8/2 C2.6 Drainage & Utility Plan B 8/2 C3.1 Utility Profiles (Storm) 8/2 C3.2 Utility Profiles (Sanitary) 8/2- C3.3 Utility Profiles (Sanitary) 8/2- C4.1 Lighting Plan 8/2 C4.2 Lighting Plan Details 8/2 C5.1 Soil Erosion & Sediment Control Plan 8/2 C5.2 Soil Erosion & Sediment Control Notes & Details 8/2 C6.1 Construction Details 8/2* C6.2 Construction Details 8/2 C6.3 Construction Details 8/2 C6.4 Construction Details 8/2- C6.5 Construction Details 8/2 C6.6 Construction Details 8/2 C7.1 Soil Boring Logs 8/2 C8.1 Vehicle Circulation Plan (WB-67) 8/2 C8.2 Vehicle Circulation Plan (Refuse) 8/2 L1.1 Landscape Plan 8/2