Loading...
HomeMy WebLinkAboutARB201700069 Correspondence 2017-11-02 waters ,et studio MEMORANDUM DATE 10/31/17 PROJECT North Pointe Landscape Entrance Plan TO Margaret Maliszweski FROM Luke Waldron SUBJECT RE: ARB-2017-69: North Pointe Landscape Entrance Plan Margaret, In Response to your letter dated October 23, 2017, please find our written response to points 1—2. 1. Trees added to median. 2. Tree caliper amended to 3 Y2" caliper. Please feel free to call me if there are any more outstanding issues. Kind Regards, Luke Waldron Waterstreet Studio On behalf of David Mitchell, Great Eastern Management The above record constitutes our understanding of the matters discussed and the decisions made. Please send any additions or corrections to the recorder within five(5)days of receipt. 418 East Main Street Charlottesville, Virginia 22902 434.295.8177 www waterstreetstudio.net COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files,in order to be accepted for submittal. TO: MAR-GA.-Cr M q t,I I LE N c'1 DATE: 10 I l l f 4- PROJECT NAME: ARB-2017-69: North Pointe Middle Entrance Landscape Plan Submittal Type Requiring Revisions()indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan(E&S) Mitigation Plan (MP) Waiver Request(WR) Stormwater Management Plan(SWMP) Road Plan(RP) Private Road Request,with private/public comparison (PRR) Private Road Request-Development Area(PRR-DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment)(FSP) Final Plat(FP) Preliminary Plat(PP) Easement Plat(EP) Boundary Adjustment Plat(BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan(SP-CP) Reduced Concept Plan(R-CP) Proffers(P) Bond Estimate Request(BER) Draft Groundwater Management Plan(D-GWMP) Final Groundwater Management Plan(F-GWMP) Aquifer Testing Work Plan(ATWP) Groundwater Assessment Report(GWAR) Architectural Review Board(ARB) ARB201700069 ?- Other: Please explain (For staff use only) Submittal Code #Copies Distribute To: Submittal Code #Copies Distribute To: ARB 1 Margaret Maliszewski Margaret Maliszewski From: Margaret Maliszewski Sent: Monday, October 23, 2017 5:45 PM To: 'Luke Waldron' Subject RE: North Pointe Hi,Luke. I'm so sorry—I thought I had responded to the engineer's message. I would like you to resubmit showing the trees in the median and revising the tree planting size to meet the 31/2"requirement, as indicated in my October 12 comments(which I've copied below,and modified,for easy reference). 1. To address tree/utility conflicts,the trees were removed from the median of the entrance road.Placing trees in the median is consistent with previous ARB actions for this type of development. ean-remain?Given.the recent information provided on the-depth of the pipe,please show the trees in the median. 2. On September 18 and October 2,the ARB considered the information in the articles you provided on the relationship between tree planting size and establishment/growth.At this time,the ARB cannot support the smaller planting size for Entrance Corridor frontage trees for this proposal.The ARB did note that they are willing to consider additional information on the subject,and acknowledged that a change of this type would require Board of Supervisors approval of a revision to the Entrance Corridor Design Guidelines.The landscape plan will need to show a 31/4"caliper planting size for EC frontage trees at a quantity equivalent to one tree for every 35' of frontage. Please provide revised drawings addressing these conditions.Please Include updated revision dates on the drawings and submit the Revised Application Submittal form(attached)with the revisions. If you have questions,please let me know. Thanks. Margaret From: Luke Waldron [mailto:lwaldron@waterstreetstudio.net] Sent: Monday, October 23, 2017 1:38 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject: North Pointe Margaret, Have you had time to review the comments from the Civil Engineer?Would you like us to resubmit showing the trees in the median? Many Thanks, Luke Luke Waldron waterstreet studio 418 East Main Street Charlottesville VA 22902 434.295.8177 www.waterstreetstudio.net I facebook I twitter 1 Margaret Maliszewski From: Margaret Maliszewski Sent Thursday, October 12, 2017 11:26 AM To: 'Luke Waldron' Cc: 'Jessie Calder'; David Mitchell Subject ARB-2017-69: North Pointe Middle Entrance Landscape Plan Attachments: resubmittal form.docx Luke, I have reviewed the plan with revision date of 25 September 2017 submitted for the North Pointe Middle Entrance Landscape application. I have the following comments: 1. To address tree/utility conflicts, the trees were removed from the median of the entrance road. Placing trees in the median is consistent with previous ARB actions for this type of development. Can the pipe be moved so the trees can remain? 2. On September 18 and October 2,the ARB considered the information in the articles you provided on the relationship between tree planting size and establishment/growth. At this time,the,ARB cannot support the smaller planting size for Entrance Corridor frontage trees for this proposal. The ARB did note that they are willing to consider additional information on the subject, and acknowledged that a change of this type would require Board of Supervisors approval of a revision to the Entrance Corridor Design Guidelines. The landscape plan will need to show a 31/4"caliper planting size for EC frontage trees at a quantity equivalent to one tree for every 35' of frontage. Please provide revised drawings addressing these conditions. Please Include updated revision dates on the drawings and submit the Revised Application Submittal form(attached)with the revisions. If you have questions, please let me know. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434i 296-5832 x3276 mmaliszewski@albemarle.org 1 20. Provide an additional site section from Polo Grounds Road looking north/northeast to clarify the visibility of the apartment buildings. Mr. Stoner seconded the motion. The motion carried by a vote of 4:0. (Wardell absent) The ARB clarified that architectural elevations should be provided for the north and south elevations of both the north and south buildings, and the west elevations facing the EC should also be provided. b. ARB-2017-95: Avinity Phase 2 Townhomes Amendment Lots 19-26-Amendment to an approved Certificate of Appropriateness(TM/Parcel 091A0000001900) Proposal: To revise the architectural design of the townhouses on lots 19 through 26. Location: East of Avon Street,north side of Avinity Drive, south of Avinity Place Motion: Mr. Hancock moved for approval of ARB-2017-95: Avinity Phase 2 Townhomes Amendment Lots 19-26 — Amendment to an approval Certificate of Appropriateness pending staff administrative approval of the conditions listed in the staff report,amended as follows. 1. Maintain the hoods over the entrances facing Avinity Drive as required features. 2. The Pearl Gray, Gray Slate and Rich Espresso Hardieplank colors submitted at the meeting are acceptable. 3. Add the Fypon detail trim and casings on the windows on the end unit side elevation to match the trim provided on the front elevations. Mr. Stoner seconded the motion. The motion passed by a vote of 4:0. (Wardell absent) OTHER BUSINESS a. ARB-2015-49: Riverside Center: Awnings The ARB considered the revised awning proposal and, in consensus, determined that the awning on the west elevation was acceptable, but encouraged the applicant to consider holding the canvas awning back from the corner(in line with the control joint)to avoid visual conflict with the canopy on the front elevation. b. ARB-2017-86: Piedmont Power Sign: Colors Staff reported that the sign refacing was completed without an approved permit and asked the Board for direction regarding the colors and fonts. It was the consensus of the ARB that the design should be revised to meet the guidelines regarding number of colors and fonts. c. ARB-2017-69: North Pointe Middle Entrance Landscape Plan: Tree size The ARB viewed the revised landscape plan and considered the applicant's request to use a smaller planting size for EC street trees. It was the consensus of the ARB that the 31/2"planting size requirement should be followed for this application, but staff should present additional information on the planting size issue for continued ARB discussion on a more general basis. Albemarle County Architectural Review Board Final Action Memo October 2,2017 3 waterst et studio MEMORANDUM DATE 09/26/17 PROJECT North Pointe Landscape Entrance Plan TO Margaret Maliszweski FROM Luke Waldron SUBJECT RE: ARB-2017-69: North Pointe Landscape Entrance Plan Margaret, In Response to your letter dated September 26, 2017, please find our written response to points 1-14. 1. All utility issues resolved. Areas clouded on page 8. 2. New pages added 4 and 4, showing hatched 40' buffer zone. 3. 1 new species of shrub added, clouded on page 9. 4. No comment 5. No comment Please feel free to call me if there are any more outstanding issues. Kind Regards, Luke Waldron Waterstreet Studio On behalf of David Mitchell, Great Eastern Management The above record constitutes our understanding of the matters discussed and the decisions made. Please send any additions or corrections to the recorder within five(5)days of receipt. 418 East Main Street Charlottesville, Virginia 22902 434.295 8177 www waterstreetstudio.net COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution.County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files,in order to be accepted for submittal. TO: MA2kft-4.ET MertAlZwEs�t DATE: QOl / 1C ( I l PROJECT NAME: ARB-2017-69: North Pointe Community Sim Submittal Type Requiring Revisions 0 indicates Submittal Code County Project Number # Copies Erosion& Sediment Control Plan(E&S) Mitigation Plan(MP) Waiver Request(WR) Stormwater Management Plan(SWMP) Road Plan(RP) Private Road Request, with private/public comparison(PRR) Private Road Request—Development Area(PRR-DA) Preliminary Site Plan(PSP) Final Site Plan(or amendment)(FSP) Final Plat(FP) Preliminary Plat(PP) Easement Plat(EP) Boundary Adjustment Plat(BAP) Rezoning Plan(REZ) Special Use Permit Concept Plan(SP-CP) Reduced Concept Plan(R-CP) Proffers(P) Bond Estimate Request(BER) Draft Groundwater Management Plan(D-GWMP) Final Groundwater Management Plan(F-GWMP) Aquifer Testing Work Plan(ATWP) Groundwater Assessment Report(GWAR) Architectural Review Board(ARB) ARB201700069 Other: Please explain (For staff use only) Submittal Code #Copies Distribute To: Submittal Code #Copies Distribute To: ARB 2 Margaret Maliszewski watersi,' -yet studio MEMORANDUM DATE 08/31/17 PROJECT North Pointe Landscape Entrance Plan TO Margaret Maliszweski FROM Luke Waldron SUBJECT RE: ARB-2017-69: North Pointe Landscape Entrance Plan Margaret, In Response to your letter dated August 11, 2017, please find our written response to points 1-14. 1. Full length of proposed landscaping shown on page 6 of submittal 2. Property Lines, utilities and easements shown, no conflicts in property boundary 3. 40' Buffer shown on page 6 of submittal 4. Quantity of large shade trees equal to 35' on center 5. Quantity of large trees at entrance shown as 40' on center 6. Parking outside current project area, drawings updated to reflect this 7. Standard health note added to plan(s) 8. Details of mounting/installation of sign will be submitted with sign permit application 9. Side elevation and detailed drawing of sign to be submitted with sign permit application 10. Weathering of.sign to be addressed with sign permit application 11. Elevations and plans coordinated 12. Actual intended sign height shown on page 18.To be submitted with sign permit application. 13. Complete details and illumination detail to be submitted with sign permit application 14. Trees extended and wall reduced. Please also find included 2 copies of,Survival and Growth of Transplanted Large-and Small-Caliper Red Oaks, and Influence of Tree Size on Transplant Establishment and Growth, in support of the request to reduce the planting size of frontage trees from 3'/:"to 2" caliper. Kind Regards, Luke Waldron Waterstreet Studio On behalf of David Mitchell, Great Eastern Management The above record constitutes our understanding of the matters discussed and the decisions made.Please send any additions or corrections to the recorder within five(5)days of receipt. 418 East Main Street Charlottesville, Virginia 22902 434.295.8177 www.waterstreetstudio.net COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. • TO: MP4&i\Q T MhLI SZE w S►.c\ DATE: 08/')JL/f4- PROJECT NAME: ARB-2017-69: North Pointe Community Sign Submittal Type Requiring Revisions()indicates Submittal Code County Project Number # Copies Erosion& Sediment Control Plan(E&S) Mitigation Plan(MP) Waiver Request(WR) Stormwater Management Plan(SWMP) • Road Plan(RP) Private Road Request,with private/public comparison(PRR) Private Road Request-Development Area(PRR-DA) Preliminary Site Plan(PSP) Final Site Plan(or amendment)(FSP) Final Plat(FP) Preliminary Plat(PP) Easement Plat(EP) Boundary Adjustment Plat(BAP) Rezoning Plan(REZ) Special Use Permit Concept Plan(SP-CP) Reduced Concept Plan(R-CP) Proffers(P) Bond Estimate Request(BER) Draft Groundwater Management Plan(D-GWMP) Final Groundwater Management Plan(F-GWMP) Aquifer Testing Work Plan(ATWP) Groundwater Assessment Report(GWAR) Architectural Review Board(ARB) ARB201700069 '2- Other: Please explain (For staff use only) Submittal Code #Copies Distribute To: Submittal Code #Copies Distribute To: ARB 2 Margaret Maliszewski RECEIVED AUG 3 1 2017 COMMUNITY DEVELOPMENT