Loading...
HomeMy WebLinkAboutARB201700014 Correspondence 2017-08-17 � J 17 August 2017 Ms.Margaret Maliszewski Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 RE: Scottsville Elementary School Security Addition Ms.Maliszewski: Attached please find revised drawings for the Scottsville Elementary School Security Addition project, for your review. As I outlined to you by email,the following items represent the major changes to the exterior of the proposed work: 1) The new classroom has been eliminated from the scope,significantly reducing the footprint of new construction. 2) All proposed roof-level HVAC equipment has been completely eliminated. The new system is to be a VRF,with the condenser completely hidden at grade level behind a new brick site wall around the Loading Dock area.This site wall will match existing brick in every respect. As a further comment,please note the addition of SHEET A-9.2-ADD ALTERNATES,which was not included in the original Bid Documents. This additive work will posted in an upcoming Addendum. As previous,the intent is to replace the existing skylight with a new unit that approximates existing in appearance as closely as possible. Please let me know if you have any questions or comments about these materials. Sincerely, • Steve Mundt Principal • Grimm+Parker Architects 123 East Main St, 2"Floor Charlottesville,VA 22902 434-270-0145 smundt@gparch.com Margaret Maliszewski From: Steve Mundt <smundt@gparch.com> Sent: Wednesday, April 26, 2017 3:39 PM To: Margaret Maliszewski Cc: Jonathan Moore; Steven Hoffmann Subject: RE: Scottsville Elementary School Addition -ARB review comments Thanks, Margaret, Today was bid day and no bids were received.The Owner is putting their heads together to decide how to proceed, but we will get in those revised drawings asap. Also,we need to start the process on getting approval for the letters we intend to mount to the building, so you will see that from us in coming days. Steve Stephen Mundt,AIA, LEED AP Principal OP GRwNA AND PARKER Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street,2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments grimmandparker.com From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent:Wednesday,April 26, 2017 2:37 PM To: Steve Mundt<smundt@gparch.com> Cc:Jonathan Moore<jmoore@gparch.com>; Craig Kotarski<craig.kotarski@timmons.com>;Jonathan Showalter <Jonathan.Showalter@timmons.com>; Steven Hoffmann<shoffmann@albemarle.org> Subject: RE: Scottsville Elementary School Addition -ARB review comments Steve, 1. The landscape plan was not included in the plan set I received.Jonathan has emailed me the correct plan set, so I can review that now. 2. Regarding the visibility of equipment note, I was making a distinction between the site plan drawings and the architectural drawings. I need the note on both sets of drawings. I saw that it was on the site plan drawings. I need to see it on the architectural drawings. 3. I don't have a roof plan, but a roof plan would be helpful in explaining the proposed rooftop equipment and screening. 4. Please do submit the revised elevation sheet with the updates for equipment and screening. 5. The screening explanation can be supplied in the cover memo that accompanies the resubmittal. 1 If there are other questions, please let me know. Thanks. Margaret From:Steve Mundt [mailto:smundt@gparch.com] Sent:Wednesday,April 26,2017 1:01 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Jonathan Moore<imoore@gparch.com>; Craig Kotarski<craig.kotarski@timmons.com>;Jonathan Showalter <Jonathan.Showalter@timmons.com>; Steven Hoffmann <shoffmann@albemarle.org> Subject: RE:Scottsville Elementary School Addition-ARB review comments Hi Margaret, Are you saying these notes did not make it onto the drawings that were resubmitted to the County? Because the most current civil drawings that I have,that went out as the Bid Set, are marked as you required below,which makes me wonder if the wrong drawings were plotted for the re-submission. Attached are the drawings I have as the current ones, with the notes you reference highlighted, and the correct number of maple trees called out.Are these not the drawings you have? The screen for the RTU is noted on the roof plan, however, I agree that I do not see where we put the language you required on the Architectural Drawings.We can revise our elevation sheet,show the RTU and screen, and put the statement you require on the drawings.As far as the explanation you require below, highlighted, is that information also to be supplied on the drawings?Or is that to be sent to you in letter or email form? Stephen Mundt,AIA,LEED AP Principal G- P GRYMA AND PARKER Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street,2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments grimmandparker.com From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent:Wednesday,April 26, 2017 11:03 AM To: Steve Mundt<smundt@gparch.com> Subject: RE:Scottsville Elementary School Addition-ARB review comments Steve, A revised plan was submitted to the County for the Site Development Plan application for the Scottsville Elementary School project. I provided the following ARB comments and am sending them to you to keep you updated on the project status. 2 Margaret Maliszewski From: Margaret Maliszewski Sent: Wednesday, April 26, 2017 11:03 AM To: 'Steve Mundt' Subject: RE: Scottsville Elementary School Addition - ARB review comments Steve, A revised plan was submitted to the County for the Site Development Plan application for the Scottsville Elementary School project. I provided the following ARB comments and am sending them to you to keep you updated on the project status. 1. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. v2. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed t to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall L., be pruned minimally and only to support the overall health of the plant." The applicant has indicated that this item was addressed, but the landscape plan was not included in the 4/3/2017 revision. ffA note on the landscape plan near a maple tree symbol indicates "5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. If you have questions, please let me know. Margaret From:Steve Mundt [mailto:smundt@gparch.com] Sent:Tuesday, March 21, 2017 9:13 AM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject: RE: Scottsville Elementary School Addition -ARB review comments Got it, thanks, Stephen Mundt,AIA,LEED AP Principal OP GRMM ANO PARKER Dir:434.270.0145 I Tel:434.296.5353 I Email:smundtPgparch.com 123 East Main Street,2nd Floor I Charlottesville VA 22902 Calverton l Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments 1 grimmandparker.com From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent:Tuesday, March 21, 2017 9:08 AM To: Steve Mundt<smundt(agparch.com> Subject: RE:Scottsville Elementary School Addition-ARB review comments Actually,the application for a sign permit is a combined application that covers zoning, building and ARB reviews, so you don't need to submit a separate ARB application for that. From: Steve Mundt [mailto:smundt@gparch.com] Sent:Tuesday, March 21, 2017 9:04 AM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject: RE: Scottsville Elementary School Addition -ARB review comments Hi Margaret, With respect to the comment about signage,just confirming, if we want to mount letters on the building,that has to have a separate Certificate of Appropriateness? Sorry to be dense, but your letter had separate permit, and I have worked in many jurisdictions where signage requires separate permits but are not affected by ARB conditions. I am now rereading after talking to the Owner, and am realizing this means separate Certificate of Appropriateness..? Which is not a problem,the answer is still the same, I am just confirming we need to get the ball rolling on submitting an application for a CoA to mount those letters on the building.Thanks, Steve Stephen Mundt,AIA,LEED AP Principal G+p GRIMM AND PAW R Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street, 2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments grimmandparkercom From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent: Monday, March 20, 2017 10:43 AM To:Steve Mundt<smundt@gparch.com> Subject: RE:Scottsville Elementary School Addition -ARB review comments Thanks. From:Steve Mundt [mailto:smundt@gparch.com] Sent:Sunday, March 19, 2017 11:32 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> 2 Cc:Steven Hoffmann<shoffmann@albemarle.org>;Jim Boyd <jboyd@gparch.com>; Craig Kotarski <craig.kotarski@itimmons.com>;Joe Letteri<jletteri@k12albemarle.org>;Sheila Hoopmann <shoopmann@k12albemarle.org> Subject: RE:Scottsville Elementary School Addition-ARB review comments Hi Margaret, Here is our response to your revisions for the Certificate of Appropriateness, all of which are accepted. Thanks, Steve Stephen Mundt,AIA,LEED AP Principal GaMM AND MRKER Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street, 2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions ( Engaging Environments grimmandparker.com From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent: Friday, March 10, 2017 3:29 PM To:Steve Mundt<smundt@gparch.com> Cc:Steven Hoffmann<shoffmann@albemarle.org>;Jim Boyd<iboyd@gparch.com> Subject: RE:Scottsville Elementary School Addition-ARB review comments Please see comments in red. From: Steve Mundt [mailto:smundt@gparch.com] Sent: Friday, March 10, 2017 2:49 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Steven Hoffmann<shoffmann@albemarle.org>;Jim Boyd<jboyd@gparch.com> Subject: RE: Scottsville Elementary School Addition -ARB review comments Hi Margaret, This looks good,and Us 2 through 4 are easy enough to address. Questions about#1: a) Is this referring also to EXISTING mechanical equipment on the roof? No,just new equipment.That would be outside of the scope of our project to try to eliminate view of existing roof top equipment. b) Does providing roof top screens qualify as"eliminating the visibility"of mechanical equipment?We have one new roof top unit as part of this project,and can provide an rtu screen if that meets the requirement.Adding a screen is typically a last choice.The preference is for the building itself to accomplish the screening. But, in this case,given the distance from the road, the equipment screen may be acceptable.The screen should look as coordinated with the rest of the addition as possible. 3 Thanks, Steve Stephen Mundt,AIA,LEED AP Principal GP DAIWA AND to IR Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street, 2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments grim mandparker.corn From: Margaret Maliszewski [inailto:MMaliszewski@albemarle.org] Sent: Friday, March 10, 2017 10:52 AM To:Steve Mundt<smundt@gparch.com> Cc:Steven Hoffmann<shoffmann@albemarle.org> Subject:Scottsville Elementary School Addition -ARB review comments Hello,Steve and Stephen. I have a few minor comments on the Scottsville plan.The comments are listed in the attached letter. If you have questions, please feel free to contact me. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 4 it re tilt • 11 * 608 Preston Avenue Suite 200 P 434.295.5624 T I M M O N S GROUP Charlottesville,VA 22903 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. www.timmons.com April 3, 2017 Sarah Baldwin - Albemarle County Community Dev. 401 McIntire Rd Charlottesville, VA 22903 RE: Scottsville ES Security—Minor Site Plan Review Comment Response Letter (SDP20I 700010) Dear Ms. Baldwin: We have reviewed all of your comments from March 23, 20l 7 and made the necessary revisions. Please find our responses to the comments below in bold lettering. CDD Engineering- David James: I. An approved VSMP plan's required before FSP approval. Acknowledged. 2. Remove E&SC and SWM plan from site plan (sheets C3.0, C3.I, C3.2, C6.0) E&SC and SWM plan sheets have been removed from the set. 3. Callout MH-I at connection, and provide a detail. A cleanout has been added at the connection between the existing 12 'steel pipe and proposed HDPE. See sheet C5.0. 4. Sidewalks abutting parking to be 5' minimum wide with bumper blocks or s/w 6' minimum (Design. manual Sect. 7). Bumper blocks have been added between parking spaces adjacent to sidewalk. See sheet C4.0. 5. Include note about the pipe extension and installation. Note has been added. See sheet C5.0. 6. Sheet CO.0—Source topography says Dec 2017. Provide actual date and existing site conditions. (18-32.6.2). Date has been updated on cover Sheet CO.0. Survey data was obtained on December 13, 2016. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES a 7. Sheet C 1.0— Fix the AC SWM notes that are running off sheet (bottom of plan) to fit in the layout view. Sheet C I.0 has been revised accordingly. 8. Proposed parking area should not exceed 5%grade in any direction and you are just exceeding the limit (I8-4.12). Parking slop is a function of the slope of the existing road. Much of this area is already along the road is already being used as existing gravel parking at thtsame slope as the proposed condition. Regrading of the road is beyond the scope of this project. 9. Sheet C4.0—Show the actual parking spaces for the parking lots, and any existing pavement markings. Sheet C4.0 has been revised to show all existing parking spaces and pavement markings. 0.Sheet L I.0—The table shows 6 for Red Maple. 5 are called out in the plan, but it appears that 6 are shown, please revise. Label has been revised accordingly on Sheet L I.O. CDD Inspections--Keith Huckstep: I. Plans dated 02/21/2017 need specifications/drawings of the new 7' and I I' wide concrete ramps to verify ADA compliance. Ramps layout and grading are shown on sheets C4.0 & C5.0. The surface will be in accordance with the sidewalk section and details located on sheet C 1.0. Handrail is detailed on architectural sheet A-9.I submitted under a separate cover. CDD Planning—Sarah Baldwin: I. Provide minor Amendment to SDP 1979-42 on front cover. Sheet CO.0 has been revised accordingly. 2. Provide overall parking count, parking removed and parking spaces added on front cover. Overall parking count, parking removed and parking spaces added has been updated on Sheet CO.0 under"Site Data". 3. Please label security entrance on Sheet C-4. Security Entrance has been labeled on Sheet C4.0. 4. [4.12.19] Dumpster pad must be screened. Dumpster pad is shown to be screened with a wooded'fence. See Sheet C4.0 for detail. • CDD ARB—Margaret Maliszewski: - I. Please add the following note to both the architectural and site plan drawings: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated". See note#23 under"General Notes"on Sheet C I.0 for revision. 2. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant". See last bullet under "Inspections/Guarantee"on Sheet LI.0 for note. 3. A note on the landscape plan near a maple tree symbol indicates "5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. Label has been revised accordingly. 4. Note that new and replacement signs require a separate permit and review. Acknowledged. We have included 6 copies of the plans for your review. If you have any questions or comments, please feel free to give me a call at 434.964.7148. Sincerely, Jonathan Showalter Project Engineer CC: Craig Kotarski, PE U'i.;e Margaret Maliszewski From: Steve Mundt <smundt@gparch.com> Sent Sunday, March 19, 2017 11:32 PM To: Margaret Maliszewski Cc: Steven Hoffmann;Jim Boyd; Craig Kotarski;Joe Letteri; Sheila Hoopmann Subject RE: Scottsville Elementary School Addition -ARB review comments Attachments: 2017-03-19_21487-10_Response_to_M_Maliszewski.pdf Hi Margaret, Here is our response to your,revisions for the Certificate of Appropriateness, all of which are accepted. Thanks, Steve Stephen Mundt,AIA,LEED AP Principal Gip MAIM fl40 Pnaxec Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street, 2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments grimmandparker.com From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent: Friday, March 10, 2017 3:29 PM To:Steve Mundt<smundt@gparch.com> Cc:Steven Hoffmann<shoffmann@albemarle.org>;Jim Boyd <jboyd@gparch.com> Subject: RE:Scottsville Elementary School Addition-ARB review comments Please see comments in red. From:Steve Mundt [mailto:smundt@gparch.com] Sent: Friday, March 10, 2017 2:49 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Steven Hoffmann <shoffmann@albemarle.org>;Jim Boyd <jbovd@gparch.com> Subject: RE:Scottsville Elementary School Addition -ARB review comments Hi Margaret, This looks good, and #s 2 through 4 are easy enough to address. Questions about#1: a) Is this referring also to EXISTING mechanical equipment on the roof? No,just new equipment.That would be outside of the scope of our project to try to eliminate view of existing roof top equipment. 1 b) Does providing roof top scrc ..c qualify as "eliminating the visibility" of mechanical equipment? We have one new roof top unit as part of this project, and can provide an rtu screen if that meets the requirement.Adding a screen is typically a last choice.The preference is for the building itself to accomplish the screening. But, in this case,given the distance from the road,the equipment screen may be acceptable.The screen should look as coordinated with the rest of the addition as possible. Thanks, Steve Stephen Mundt,AIA, LEED AP Principal G-f-P =WA AND PAPJ:EA Dir:434.270.0145 I Tel:434.296.5353 I Email:smundt@gparch.com 123 East Main Street, 2nd Floor I Charlottesville VA 22902 Calverton I Tysons I Charlottesville Creative Collaboration I Sustainable Solutions I Engaging Environments grim mandparker.com From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] TM v Sent: Friday, March 10, 2017 10:52 AM To:Steve Mundt<smundt@gparch.com> Cc:Steven Hoffmann<shoffmann@albemarle.org> Subject:Scottsville Elementary School Addition-ARB review comments Hello,Steve and Stephen. I have a few minor comments on the Scottsville plan.The comments are listed in the attached letter. If you have questions, please feel free to contact me. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 2 G p GRIMM AND PARKER 19 March 2017 Ms.Margaret Maliszewski,Principal Planner County of Albemarle,Department of Community Development 401 McIntire Road,North Wing Charlottesville,VA 22902-4596 RE: ARB-2017-14:Scottsville Elementary School Security Vestibule Addition Certificate of Appropriateness Dear Ms.Maliszewski, We have received your letter of March 9 regarding the referenced project and County-wide Certificate of Appropriateness.We agree to all four revisions listed in your letter. 1.The note:"Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." Will be added to both architectural and site plan drawings. 2.The note:"All site plantings of trees and shrubs shall be allowed to reach and be maintained at mature height;the topping of trees is prohibited.Shrubs and trees shall be pruned minimally and only to support the overall health of the plant."will be added to the landscape plan. 3.The indications on the landscape plan will be revised to consistently reflect the number of maples. 4.This project does not propose any freestanding signage,but if the Owner elects to pursue signage mounted on the building,a separate permit will be applied for. With regard to comment number 1 above,the project will comply with the clarification in your email of March 10.The new roof top unit will be screened in a way that coordinates architecturally with the rest of the addition. Sincerely, Stephen R M nd .I LEED AP Principal C: Joe Letteri,Albemarle County Public Schools Building Services Department Sheila Hoopman,Albemarle County Public Schools Building Services Department Steve Hoffman,Albemarle County Facilities and Environmental Services Craig Kotarski,Timmons Group Grimm + Parker Architects Jim Boyd,Grimm+Parker Architects 123 East Main Street,2nd Floor Charlottesville,VA 22902 Tel:434.296.5353 Visit online at grimmandparker.com Calverton Tysons Charlottesville Location: 2511 Avinity Drive,on the east side of Avon Street-Extended,approximately 60' south of Avinity Drive Motion: Mr.Binsted made a motion that the following items should be provided(for staff review)prior- to making a recommendation to the Planning Commission on the proposed rezoning: 1. Revise the application plan to indicate that stormwater facilities will be located under the parking lot. 2. Confirm that there are no utilities or easements on the property that would conflict with required planting.If such elements do exist,revise the plan to provide planting area clear of utilities and easements. 3. Adjust site elements to provide planting area consistently along the south side of the parking lot. 4. In the event that the proposal moves forward, ensure that trees are provided sufficient to meet Entrance Corridor perimeter and interior parking lot requirements. 5. Allow for the possibility of increasing the setback on the northern property line depending.on the need for landscaping along the building elevations. 6. Revise the Application Plan to show the approved landscaping along Avinity Drive for context and coordination. - 7. Provide a pedestrian connection to Avinity Drive and Avon Street. , 8. Reorganize site elements for better coordination of existing and proposed open space. Mr.Van Der Werf seconded the motion. The motion passed by a vote of 3:0. (Missel, Stoner absent) OTHER BUSINESS a. Scottsville Elementary School:Addition In consensus,the ARB agreed that the application for the school addition could be reviewed and approved by staff as a Countywide Certificate of Appropriateness. b. Avenue Realty Sign • In consensus,the ARB agreed that a signicould be located in the second story gable of the building, if the sign is consistent with the approved criteria for signs on the Hamrick Buildings. c. Next ARB Meeting: March 20, 2017 ADJOURNMENT The meeting was adjourned at 1:37 p.m. to the next ARB meeting on Monday, March 20, 2017 in Room 241, Second Floor, County Office Building at 1:00 p.m. Albemarle County Architectural Review Board Final Action Memo March 6,2017—page 2