HomeMy WebLinkAboutARB201800136 Checklist 2019-05-22 Add sill courses below the second story windows on elevations facing Rt. 29.
ill courses were added; however, at the ARB work session on April 1, 2019, the ARB indicated that the
following changes are required:
a. Remove the dormers.
b. Remove the closed gable and replace with an open gable.
c. Remove the small windows in the open gables and replace with vents.
fie 1i1(-.6frYt r1. tat.. we 2
/4“)/ N//�
Mcs
. Add 2 large shade trees, 21/4"caliper at planting, on both sides of Lewis& Clark Drive, (for a
total of 4 trees) within 400' of the Rt.29 intersection.
It appears that one tree previously shown on the plan has been shifted closer to Lewis&Clark Drive,
but no trees have been added. Please add 2 large shade trees,2A"caliper at planting, on both sides of
Lewis&Clark Drive, (for a total of 4 trees)within 400' of the Rt. 29 intersection.Please provide an
annotated plan clearly identifying the added trees.
f Add 4'-6' evergreen trees in the mixed median planting.
It appears that no trees have been added and no changes in species have been made.Please add 4'-6'
evergreen trees in the mixed median planting and provide an annotated plan clearly identifying the
added trees. p0 G eLJ v ?I /- 'fl w I Am.
/
v.
9. Provide a landscape maintenance agreement for the median plants.
Demonstrate that all landscaping will be maintained by the HOA.
Include on the subdivision plat a landcape easement(s)for all areas that show landscaping on
individual lots.
•
... Revise the species of shrubs proposed along Lewis&Clark Drive to ones that can easily be
acquired at 24"planting height.
The shrub species remain as in the previous plan. Please revise the species of shrubs proposed along
Lewis& Clark Drive to ones that can easily be acquired at 24"planting height. Please provide an
annotated plan clearly identifying the changes.
itce
13. Confirm with Anchor block, and provide documentation, that 3' is sufficient spacing between
large trees and the retaining w wall where geo-grid is used. Otherwise, increase planting area to
accommodate the trees.
No change appears on the plan. Please provide documentation from Anchor Block stating that
minimum spacing required between large trees and the retaining wall where geo-grid is used. If trees
are shifted to coordinate with Anchor Block planting requirements, provide an annotated plan clearly
identifying the changes.
prRevise the plan to show landscaping at the stormwater facility located at the south end of the
oject area consistent with the previous approval.
The previous approval showed landscaping along the west side of the maintenance access path to the
stormwater facilitly located at the south end of the project area. Please add this landscaping to the
current plan.
ttlintdt 4Sc L
fig q- , to a
•
PLANT SCHEDULE
cer Rubru is listed as both a canopy tree and an understory tree, nd Redlpd is listed as a
creenmg tree in the plant schedule. Please place the trees in the correc ategories and double-check
all plant counts.
And #11nw
4 .t-
COLLINS ENGINE I N G 2C IETT ST.SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-engineering.com
TRANSMITTAL
❑ I'AX ❑ MAIL ■ DELIVERY
TO: FROM:
MARGARET MALISZEWSKI SCOTT COLLINS
COMPANY: DATE:
ALBEMARLE COUNTY 5/8/2019
FAX: TOTAL NO.OF PAGES INCLUDING COVER:
PHONE NUMBER: SENDER'S PHONE NUMBER:
434.293.3719
PROJECT/SUBJECT:
NORTH POINTE ARB PLAN
ARB201800136
PLEASE FIND ENCLOSED:
NO.COPIES DATE DESCRIPTION
�' PLANS - f/,��i .-
/ Db--, //hG/f G(!.einth S-55-
Sxfa= Aka
NOTES/COMMENTS:
RECEIVED BY:
SIGNATURE DATE
•
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files,in order to be accepted for submittal.
TO: /144 't DATE: f7/9
PROJECT NAME: ARB-2018-136: North Pointe Northwest Residential Area Final Site Plan
Submittal Type Requiring Revisions()indicates Submittal Code County Project Number #Copies
Erosion&Sediment Control Plan(E&S)
Mitigation Plan(MP)
Waiver Request(WR)
Stormwater Management Plan(SWMP)
Road Plan(RP)
Private Road Request,with private/public comparison(PRR)
_Private Road Request—Development Area(PRR-DA)
Preliminary Site Plan(PSP)
Final Site Plan(or amendment)(FSP)
Final Plat(FP)
Preliminary Plat(PP)
Easement Plat(EP)
Boundary Adjustment Plat(BAP)
Rezoning Plan(REZ)
Special Use Permit Concept Plan(SP-CP)
Reduced Concept Plan(R-CP)
Proffers(P)
Bond Estimate Request(BER)
Draft Groundwater Management Plan(D-GWMP)
Final Groundwater Management Plan(F-GWMP)
Aquifer Testing Work Plan(ATWP)
Groundwater Assessment Report(GWAR)
Architectural Review Board(ARB) ARB201800136
Other:Please explain
(For staff use only)
Submittal Code #Copies Distribute To: Submittal Code #Copies Distribute To:
ARB 1 Margaret
Maliszewski
41(NI
Revise the elevation drawings`w include notes indicating that 1)a maximu _ .'two adjacent facades shall be co-
planar, 2) adjacent townhouses shall not have the same siding color, and 3)two townhouses having full brick
facades shall not be adjacent.
cY°'1 j
a
dd sill courses below the second story windows on elevations facing Rt. 29.
die ,glt6 Athettotra ram.. 41-0-2-L-0-n - 0/4 `ro 'lid 4
- n�.,—sc
Provide elevations for all tow ouse oc s.
AhAnl ,4,0-0-,[j .. U 4.401.4 al ,�-W-ten: -- ,l
ee
or 6,..)(7)-‘,4 to \--.
Revise the landscape plan to address the requirement for the 40' landscape buffer along the LC frontage of the
development and show how the buffer is coordinated with /existing wooded area to remain and proposed frontage
improvements. n 9 , �./ /7 �t .. 40' t„s , (.24,c& f. fir/4.c-..
Resolve the tree and sewer lateral conflicts near units 47 and 109.
6. Coordinate the quantities of linden and abelia drawn on the plan with the quantities listed in the plant schedule.
Use a single symbol for the TCG plant.
(c2-w11u&/ G - e " tf to Mt-€ -k fey-) 9 U crrn
• dd 2 large shade trees, 2%"caliper at planting, on both sides of Lewis &Clark Drive, (for a total of 4 trees)0
within 400' of the Rt../29 intersection. 14 / p (�t TA-St- ^ et0 —� PCB` - anarr cr_ Cf,-61,61`�i/�
8. dd 4'-6' evergreen trees in the mixed median planting.
pl u.-n6 040-44,6 I it,0 o? cam,,o9. rovide a landscape maintenance agreement� for the median plants.
pqi'2 "`e - cc- "'-
. Shift the locations of the gi _ of Virginia pine and Sweetbay magnolt.—coordinate with the retaining wall
location.
Agia
Oemonstrnte that all landscaping will be maintained by the HOA. ,
49/ lam, p Gdit , /l viYB�/''�-z�'/ jJ
12.( jise the species of shrubs proposed along Lewis &Clark Drive to ones that can easily be acquired at 24"
lanting height.
C 13. Confirm with Anchor block, and provide documentation,that 3' is sufficient spacing between large trees and the
retaining wall where geo-grid is used. Otherwise, increase planting area to accommodate the trees.
Revise the plan to show landscaping at the stormwater facility located at the south end of the project area
consistent with the previous approval.
5 , coy Z l.d- at)) a- ,ui:, cAJ c(Alo let---c_ ,off cie-3-P-.
e Laix... - -d V / '" '' 'r '-
—p/c "-?- -76 1- "t '` A' ` V , c 7