HomeMy WebLinkAboutSP201900002 SP Checklist 2019-03-18SPECIAL USE PERMIT CHECKLIST for
Preapp2018-121- Pleasant Green- TMP 056A1-01-00-02600
Project Name / Tax Map Parcel Number-
`1c -_
k7r`
After the mandatory pre -application meeting, county staff will mark this checklist appropriately so
�IRGINIP
that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with
the official application
PLANNER INITIALS
DBB
Required for
P�V7
application?
(County Staff)
(Applicant)
SECTION 33.4(c)
X
NOTE to staff: if providing additional comments are provided within the checklist boxes,
please distinguish those comments with different color print AND italic/underlined print
YES
NO
or some other method that can be distinguished when copied with a black and white
copier/printer.
X
/
✓
A narrative of the project proposal, including its public need or benefit;
X
A narrative of the proposed project's consistency with the comprehensive plan,
including the land use plan and the master plan for the applicable development area;
X
A narrative of the proposed project's impacts on public facilities and public
infrastructure.
X
A narrative of the proposed project's impacts on environmental features.
X
One or more maps showing the proposed project's regional context and existing natural
and manmade physical conditions;
X
A conceptual plan showing, as applicable: Include as much detail as possible applicable
to the
proposed use; specifically, please be clear where the crossing was to be located
as approved with SP2016-00003
X
✓
1) the street network, including circulation within the project and connections to
existing and proposed or planned streets within and outside of the project;
X
2) typical cross -sections to show proportions, scale and streetscape/cross-
sections/circulation;
X
3) the general location of pedestrian and bicycle facilities;
X
4) building envelopes;
X
5) parking envelopes;
X
6) public spaces and amenities;
SPECIAL USE PERMIT CHECKLIST 02/2015 Page 1 of 2
X
✓
7) areas to be designated as conservation and/or preservation areas;
X
✓
8) conceptual stormwater detention facility locations;
X
�-
9) conceptual grading; Designate floodplain and floodway on the plans. Grading is not
allowed in the floodway [18-30.3.11].
X
✓
10) conceptual lot layout;
X
Other special studies or documentation listed below (see also attached comment letters
from Zoning and Engineering):
1. Traffic Study (Contact Kevin McDermott or Dan Butch to set up scoping
meeting)
2. For the proposed residential development — A variance granted by the Board of
Zoning Appeals will be required for a building height increase above the 35'
limit set in Section 16.3 of the Zoning Ordinance. See Section 34 of the Zoning
Ordinance (34.4) for more on variance applications and criteria for granting a
variance.
3. Provide justification for any existing conditions that were approved with the
prior SP requesting to be removed, including new or updated language for the
conditions as well.
4. Community meeting- the applicant is required by ordinance to undertake a
community meeting process as part of the review of the rezoning/SP request.
This meeting should be held, if possible, within 30 days from the date the
rezoning application is submitted, and can be held prior to the submittal of the
rezoning application. See attached Community Meeting Guidelines for detailed
information.
S. If the applicant knows of any of any waivers or modifications that are needed to
implement the proposed plan, staff recommends that those requests be
submitted with the initial application. Staff will then determine if the waivers
should be approved with the rezoning action or deferred for action with site
plan and/or subdivision plat approval.
Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit.
Read and Sign
I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on
this checklist as required for application.
—=�k
Signature of person completing this checklist
Print Name
Date
y3y' 2-y3-
Daytime phone number of Signatory
SPECIAL USE PERMIT CHECKLIST 02/2015 Page 2 of 2