HomeMy WebLinkAboutARB201700001 Checklist 2018-04-12 ¢ je
2 s-lvcw lvr5' ,. eM-t, 11-62,41 "%uktac-69 aCite
Revise the elevation drawings(the black and white line drawings)to identify the proposed building colors.
8n ad- Ctflk_ — VJ4sttiriwc1er eta ssie.. 05 - PALS en et CO
S'tiGW P4a4-tc `�fVWLU•1Z1.1r0 . 4 itTkjreei0��
vic t7.er Csmrn\ Lop S irQ rub - pituenty Act gthESZ Sr/41N
;Alm miNUM Coonpo, Nt S- &LEW"-
�2. Indicate for review the colors proposed for the metal canopies and aluminum post and identify the colors on the elevation
drawings. ��
alkw,. ConnpaQ�- s -. -P z4_
Revise the front•'f levation of Building A to show the drive-through window.
V\ "Include a note on the elevation drawings that the window glass for Building A meets the following specs: visible light
transmittance shall not drop below 40% and isible light reflectance shall not exceed 30%.
. Indicate on the plan that the light loss factor (LLF) used to calculate the photometrics eq aklTs 1.0. If the 7/12/2017
photometric plan did not use 1.0 as the LLF, recalculate the photometrics, ensure,spillover and maximum light levels
still meet all requirements, and resubmit the lighting plan for review. ers .e /y1J7 r 2
Revise the lighting plan to include the locations of, and illumination from, the LED downlights in the canopies of
Building A and all other building-mounted light fixtures. If building-mounted lights other than the Building A canopy
lights are proposed,revise the elevation drawings accordingly. , -e.c ,0.IM /2
•
\I/. Provide a copy of the E&S plan showing coordinated tree protection fencing.
/62A- . , 1 3 VS 4I P d- .22_>4 t/ S D?
/8. Correct the Comprehensive Sign Plan to identify Holly Green as 3630-76. /OQ 4 "fit ed
Note that individual signs will ire sign applications and sign designs '.•, be required to meet standard ign
guidelines regarding size, scale and proportion relative to the sign band and the overall building. (nvbi<-
P,
&Ok dam
. Eliminate the 3,000-lumen note where it references internal illumination. A-4'11'W`S tArw' i
e'l1t 1
1111 V1/44-1'2 U
v1. Revise the Comprehensive$ign Plan to clarify that the backgrounds of graphics may be required to be opaque to meet
(((/// the sign guidelines. /+w a4 Lt.4 p3 = p 4- c S l°
L. Note that the freestanding sign location will not be approved with the site plan; it will be approved wi h a separate sign
application. Ensure that the minimum sign setback will be met. ur1,GL el°-' 44 t 1 't'. alr
1,13. With the freestanding sign application,clearly identify all sign materials and colors on the drawings so that a full review
can be completed. Ana .teaoil t-n ra-era 1.c* S'9e 'X"liminate the freestanding sign detail from the site plan. ...4-4'1"-av"40
A '
rTi, Architectural Review Board
.� ,.e c bi
Final Review of a Site Development Plan Checklist for Completeness
L��3 collated copies ,
LDS 1 set of color/material samples •
•
A. Written description of the proposal
Written description of the proposal.
0 Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
BB../Site plan showing the following (drawn to the scale of 1"=20',clearly legible and folded):
L���Location(s) of proposed building(s) on the site.
y' Location • • •.osed parking, travelways, walkways a d other improvements.
It ‘•� _-,,,, - ••� • 7• - -< containers, I mg and service areas, other similar features and
i '== ociated screening. -
t� IExisting and proposed-topogaphy drawn with contour intervals of 5-feet or less, and with sufficient
I off-site topography to describe prominent and pertinent off-site features and physical characteristics,
/
but in no case less than 50-feet outside of the site.
I vocation and size of existing and proposed utilities and easements. Identify type of utility and extent
/of easement.
—
r tormwater management plan.
Location of retaining walls Indicating top and bottom elevations, maximum wall height, and proposed
�aterials, with material and color samples.
L✓i Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings, clearly identify revisions made.
JC. dscape plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
�xisting landscaping to be removed. Include the location, size, and species.
dandscape key including all landscape symbols and a description of what they represent.
ocation of existing and proposed tree lines and tree save areas.
E( cation of existing natural features.
Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
Or Location and height of above-ground utilities and associated easements, and location of below-
und utilities and associated easements.
Stormwater facilities.
krgfo
❑ P vide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
Include tree protection fencing and limits of work on the landscape, grading and E&S plans.
1
OVER-.
N
D. Ugh ing plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
ocation of all proposed building and site lighting.
El/righting schedule identifying all proposed light fixtures, poles and brackets.
,,-
1111 cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color, finish, and installation height.
El/Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
S ction 4.17 of the Zoning Ordinance.
Coordination of lighting with landscaping and other site elements.
E. earance of the building(s) (architectural elevations, color perspective sketches,site sections):
imensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 1/8"=l'-0". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design.
CColor perspective sketches that show the proposed development as seen from the Entrance Corrid r(
`` 111'Site sections that clarify proposed changes in topography and illustrate the visibility of the propose
development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) at
/roof height(s) relative to the natural elevations along the Entrance Corridor. 4.
v e set of all building materials/colors. V)
A floor plan adequate to show exterior walls, windows and doors. - _
F; Additional material '
Provide labeled, color, 8-1/2" x 11" photographs of the site as seen from both directions on the
(ikk.)‹..Ei ' ntrance Corridor.
Signatures
2
OVER-,
. y