Loading...
HomeMy WebLinkAboutARB201600161 Application 2016-12-27 L 1+p4'"'O; _ --- Community Development Department I ' 3t .�Albemarle Coca -sy 41' milts Road Charlottesville,VA229D2-4598 I al :f �- ^ .vice:(434)296-5832 Fax:(434)972-4125 I N , /j Planning Application PARCEL I OWNER INFORMATION TMP 07800-00-00-.015D0 '. Owner(s): CINKOUS,JANICES Application# 'ARB201 600161 PROPERTY INFORMATION Legal Description I ACREAGE PARCEL FLOW VW - Magisterial Din.IRivanna iJ Land Use PrimarylCommercial 117 Current AFD Not in.A/F District 'j Current Zoning Primary Highway Commercial Ft] APPLICATION INFORMATION Street Address 1313 RICHMOND RD CHARLOTTESVILLE,22911 Entered By 'Jennifer Smith Application Type Architectural Review Board - lJ 12/28/2016 Project Flow Automotive Audi Showroom • Received Date 12/21/16 Received Date Final Submittal Date 12/27/16 Total Fees Closing File Date Submittal Date Final Total Paid Revision Number Comments • • Legal Ad I ' SUB APPLICATION(s) - - Type • -- I,Sub Applicatio : - - - Comment - APPLICANT /CONTACT INFORMATION CentactType _.... -..- ---- Nefie -- - --- .. __. ..__.Addfess " - " CifWState _. Zip - -Phone - PhoneCell Dnrsr/Apprsrt" -IINKDUS.JANICE S 12205 SHEPHERDS RIDGE RD CHARLOTTESVILL 22901 CKER.A_____ .1__....__HS_ 22___::.__._.�...:_:...._.:..:._......____ _: Primary Contact KURi KEESECKER.PSA 112 4TH ST NE CHARLOTTESVILL 22901 Signature of Contractor or Authorized Agent Date COUNTY OF ALBEMARLE ��a0' Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you;need to submit additional information please explain on this form for the benefit of the intake staff. All plans trust be "`: collated and folded to fit into legal size files,in order to be accepted for submittal. TO: Margaret Maliszewski DATE: IZ/Z : Es PROJECT NAME: ARB201600126 Flow Automotive Audi Showroom Submittal Type Requiring Revisions 0 indicates Submittal Code County Project Number #Copies Erosion &Sediment Control Plan (E&S) Mitigation Plan(MP) Waiver Request(WR) Stormwater Management Plan(S WMP) Road Plan (RP) Private Road Request,with private/public comparison(PRR) Private Road Request-Development Area(PRR-DA). Preliminary SitePlan(PSP) Final Site Plan(or amendment)(FSP) Final Plat(FP) _ Preliminary Plat(PP) Easement Plat'(EP.) Boundary Adjustment Plat(BAP). Rezoning Plan(REZ) Special Use Permit Concept Plan(SP-CP) Reduced Concept Plan(R-CP), Proffers(P) Bond Estimate,Request(BER) Draft Groundwater Management Plan(D-GWMP) Final Groundwater Management Plan(F-GWMP)' Aquifer Testing Work Plan(ATWP) Groundwater Assessment Report(GWAR), Architectural Review Board (ARB) ARB201600126 Other:Please explain (For staff use only) Submittal Code I #Copies Distribute To: Submittal Code ##Copies Distribute To: ARB i Margaret Maliszewski COLLINS i IRETT ST.SUITE K CHARLOTTESVILLE VA 22902 „00 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com TRANSMITTAL ❑ FAX ❑ MAIL IN DELIVERY TO: FROM: MARGARET MALISZEWSKI SCOTT COLLINS COMPANY: DATE: ALBEMARLE COUNTY 12/12/2016 FAX: TOTAL NO. OF PAGES INCLUDING COVER: PHONE NUMBER: SENDER'S PHONE NUMBER: 434.293.3719 PROJECT/SUBJECT: FLOW AUTO AUDI SHOWROOM ARB PLAN(ARB2016-126) PLEASE FIND ENCLOSED: NO.COPIES DATE DESCRIPTION 8 PLAN 1 LETTER NOTES/COMMENTS: RECEIVED BY: SIGNAT DATE (kPl'Afil fell COLLINS ENGIN«'RING wu GARRETT ST,SUITE CHARLOTTESVILLE VA 22902 434.293:371434.293.2813 . ,. _,.. 9 PH 434 293.2813 FX ' www.collins-engineering.com December 9, 2016 Margaret Maliszewski - County of Albemarle - Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: ARB-2016-126 Flow Auto Audi Showroom Thank you for your comments dated November 7,2016 on the Flow Auto Audi Showroom ARB application. Revised plans are hereby submitted incorporating the following changes in response to the items in your.letter. 1. Building Design addressed with new renderings and architectural elevations. - 2. Addressed with Architect submittal on the building glass. 3. Additional information has been incorporated with the site design to tie-in the building to the site elements and historic architecture of the area. See the attached site plan for further details. Details include the landscaping along the entrance coridor,the proposed brick wall along the front of the parking lot display area,the landscaped areas and grass plaza/sitting,area, and the pervious pavers matching the color of the showroom floor tile. 4. The standard mechanical equipment visibility note has been added to the site plan sheet as a note. The note was also added to.the architectural plans. 5. The lightingplan has been updated to make sure all the areas are visible. Also, a project limit area has been added to the plan to show the area of work for the proposed building and parking,lot modifications. 6. The lighting fc have been updated so that all of them are legible. In addition,new ° readings were taken on the site lighting and the plan has been updated with the new readings, as well as incorporating the proposed fc's from the relocated fixtures. The attached lighting plan updates all of these fc's for the site. 7. All the sheets, including the lighting plan and landscaping plan, have been updated to show what elements are existing and are to remain, and what elements are being removed and/or relocated on the site. 8. The notes and landscaping design have been updated to clearly show the existing landscaping on the property and the landscaping that is either being removed or replaced. 9. An additional ornamental tree has been added along the EC. 10. The landscaping plan has been updated to label the existing plants and remove them from the proposed landscaping chart: 11. The landscaping.plan has,been updated as requested, and the overlapping symbols have been fixed. 12. One additional perimeter parking lot tree along the southern row of parking has been added to the landscaping plan. 13. The landscaping plan has been updated to add more of a mixture of landscaping for any of the proposed landscaping to be replaced. 14. The landscaping plan has been updated to reflect the proposed landscaping for the courtyards and the plaza areas., 15. The notes and design of the existing landscaping to remain and the landscaping to be replaced has been coordinated on the plan. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE i. • r:24R C R I T E C T S www.brucewardell.com memorandum 1 1 2 fourth street ne c.harlottesville virginia 22902 [p] 434.971 .7160 [f] 434. 971 .7166 to: Margaret Maliszewski Principal Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 date: December 20, 2016 pages: 2 via: mmaliszewski@albemarle.org project: ARB201600126 Flow Automotive Audi Showroom subject: Response Letter Margaret: Thanks for sending over the Action Letter dated November 11, 2016, and work session notes dated December 9 h. Please find our responses below: In response to preliminary review notes dated November 11th 2016: 1. The building design was revised so that the metal mesh was eliminated from the exterior, substituted with glass storefront and mottled brick. The white brick was replaced with mottled brick. 2. The standard window glass note was added below architectural elevations on page 5 of ARB booklet. 3. Refer to landscaping plan by Collins Engineering for details on landscaping appearance.* 4. Mechanical equipment note was added to Collins Engineering site plan drawings, as well as architectural plans on page 5 of ARB booklet. 5. Refer to Collins Engineering drawings for lighting layout.* 6. Refer to Collins Engineering for lighting plan.* 7. Refer to Collins Engineering for lighting plan.* 8. Notes and design have been updated. Refer to Collins Engineering for plan.* 9. Ornamental tree has been added. Refer to Collins Engineering for landscaping plan.* 10. Landscape plan has been revised. Refer to Collins Engineering for landscaping plan.* 11. Overlapping symbols have been fixed and plan has been updated. Refer to Collins Engineering for landscaping plan.* 12. Additional tree has been added. Refer to Collins Engineering for landscaping plan.* 13. The landscaping plan has been updated to meet requirements. Refer to Collins Engineering for landscaping plan.* 14. The plan has been updated to clarify appearance and planting proposed for the walls, paving, and planters at the front and east side of the site. Refer to Collins Engineering for landscaping plan.* T:\15026 FLOW Automotive Expansion\2 Permit Authority,ARB 8 BAR\County ARB COA\2016.12.09 Revised Booklet\BOOKLET and LETTER\20161220_15026Flow ARB Letter.docx Ih2/►1 • 15. Existing landscape to remain and existing landscape to be replaced have been reflected in the updated plan from Collins Engineering.* *See Collins Engineering response letter dated December 9th. In response to ARB work session notes dated December 5th 2016: 1. The design of the building was updated to reflect the Architectural Review Board's preference. The metal mesh was eliminated from the exterior elevations, and replaced with more glass storefront and mottled brick. This change is shown in ARB booklet renders and elevations. 2. The previously proposed all white brick has been replaced with mottled brick. This change is shown in ARB booklet renders. A physical sample of the brick will be provided at the ARB meeting. 3. The planting area between the front parking area and the western retaining wall has been maintained. Refer to Collins Engineering plans for existing plan and new landscaping plan. 4. New trees have been added to landscape as the base of retaining wall to soften the edge as requested. See landscape plans from Collins Engineering. from: kurt keesecker, aia kkeesecker@brw-architects.com brw architects cc: T:15026 FLOW Automotive Expansion 2 Permit Authority,ARB 8 BAR\County ARB COA\2016.12.09 Revised Booklet\BOOKLET and LETTER\20161220 15026_Flow ARB Letter.docx vs COLLINS ENGIIvdRING (200 GARRETT ST,SUITE K CHARLOTTESVILLE VA 22902 �434.293.3719 PH 434.293.2813 EX Www.collins-engineering.com December 9, 2016 Margaret Maliszewski County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: ARB-2016-126 Flow Auto Audi Showroom Thank you for your comments dated November 7, 2016 on the Flow Auto Audi Showroom ARB application. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter. 1. Building Design addressed with new renderings and architectural elevations. 2. Addressed with Architect submittal on the building glass. 3. Additional information has been incorporated with the site design to tie-in the building to the site elements and historic architecture of the area. See the attached site plan for further details. Details include the landscaping along the entrance corridor, the proposed brick wall along the front of the parking lot display area,the landscaped areas and grass plaza/sitting area, and the pervious pavers matching the color of the showroom floor tile. 4. The standard mechanical equipment visibility note has been added to the site plan sheet as a note. The note was also added to the architectural plans. 5. The lighting plan has been updated to make sure all the areas are visible. Also, a project limit area has been added to the plan to show the area of work for the proposed building and parking lot modifications. 6. The lighting fc have been updated so that all of them are legible. In addition, new readings were taken on the site lighting and the plan has been updated with the new readings, as well as incorporating the proposed fc's from the relocated fixtures. The attached lighting plan updates all of these fc's for the site. 7. All the sheets, including the lighting plan and landscaping plan,have been updated to show what elements are existing and are to remain, and what elements are being removed and/or relocated on the site. 8. The notes and landscaping design have been updated to clearly show the existing landscaping on the property and the landscaping that is either being removed or replaced. 9. An additional ornamental tree has been added along the EC. 10. The landscaping plan has been updated to label the existing plants and remove them from the proposed landscaping chart. 11. The landscaping plan has been updated as requested,and the overlapping symbols have been fixed. 12. One additional perimeter parking lot tree along the southern row of parking has been added to the landscaping plan. 13. The landscaping plan has been updated to add more of a mixture of landscaping for any of the proposed landscaping to be replaced. 14. The landscaping plan has been updated to reflect the proposed landscaping for the courtyards and the plaza areas. 15. The notes and design of the existing landscaping to remain and the landscaping to be replaced has been coordinated on the plan. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE a � ! RECEIVED DEC 1 2 2016 COMMUNITY DEVELOPMENT