HomeMy WebLinkAboutSUB200400102 Bond Road Plan and Comps. 2007-10-12 Internal Use Onl
Dale Received: Fee Paid: (�, ` � M bpr�q
Received by: eft
4/��!�CCM-4{ . 4�/ t;o L 'Y \D I p�`b \ 4,yr�`AY
Forwerdgd to: t MDR : {.(`,� NCBrill
,,. r4� ��(�� r� r� ` 1` \ ��
Date:'A' rt1 f•:{I \ btFJV1\ ,a kU �l 0,m&t'l.
t late
BOND INSPECTION REQUEST
(Inspection must be requested by the Owner/Developer of the property)
DATE: 09/25/2007
PROJECT NAME: BALLARD FIELD L Co t>.�3'`,
(Include phase,section,and other relevant information to clearly identify the project)
TAX MAP/PARCEL: 56- -1 1 OWNER: M ARCH molxrlmA i N PR PERT)ES,
This is to request that an inspection be scheduled to determine if the following performance bonds can be
reduced or released (check below all that apply). Requests are required once the initial bond estimate is
prepared. Requests should be submitted to: Department of Community Development,401 McIntire
Road,Room 227,Charlottesville,VA 22902,Attention: Pam Shifflett-Phone 434-296-5832; Fax
434-972-4126.
Inspections will be scheduled within thirty days of receipt of this request and the required fee.
❑Water Protection Performance Bond (at least 30% of the work must be
satisfactorily completed before requesting an inspection for reduction) •
❑Erosion& Sediment Control ❑ Stormwater Management&Water Quality
❑ Subdivision/Road Performance Bond (at least 30% of the work must be
satisfactorily completed before requesting an inspection for reduction)
SUBMIT$60 BOND INSPECTION FEE PER BOND-make check payable to the County
of Albemarle and submit with request.
Roads&Drainage = ,\'6 I. 3
® Water& Sewer
®Other—list below(i.e. landscaping, pedestrian paths)
ptrf€sI-vict,M s
❑Site Development Performance Bond—Incomplete Site Work r
SUBMIT$60 BOND INSPECTION FEE PER BOND-make check payable to the County
of Albemarle and submit with request.
If landscape installation is part of the bonded incomplete site work, a request for reduction
should only be made once all site work is complete and the project is ready to start the one-
year landscape maintenance period. Bonds for landscape maintenance are 33.3%of the total
landscapin alue and are maintained at that amount for the one-year maintenance period.
0,s"3i Z/vo
ignature of Owner/Developer Phone
/ 747 Print Name
File:1 kDEPTENGINEERIF'oRMSaONDSlBond Inspection Request Form doc
1/1/03,Rev.322/04,Rev.I I/8/04,Rev.2/7/06