HomeMy WebLinkAboutARB201600127 Application 2016-09-26 Community Development Departn
Athernarre C 'Pity I
401
McIntire Road Charlottesville VA22902-4.
N"` Name (434?296-5832 Fax (434:972-4
Planning Application
PARCEL I OWNER INFORMATION
TMP 07600-00-00-055A0 Owner(s): FTV INVESTMENTS LLC
Application # AR8201600.E 27
PROPERTY INFORMATION
Legal Description I ACREAGE PARCEL A -
Magisterial Dist. ; Scottsville Land Use Primary Open
Current AFD Not in A/F District Current Zoning Primary Highway Commercial
APPLICATION INFORMATION
Street Address Entered
� Judy Martinl
Application Type j Architectural Review Board L:El 19}27/2016
Project 5th Street Commercial -Initial
Received Date 09/26/16 Received Date Final Submittal Date 09/26/16 Total Fees
Closing File Date Submittal Date Final Total Paid
Revision Number
Comments 4
Legal Ad
SUB APPLICATION(s)
Type Sub Application Comment
Initial Site Plan 09/26/16
APPLICANT/ CONTACT INFORMATION
ContactType ( Name Address CityState l Zip I Phone PhoneC€
Owner/Applicant :Fly INVESTMENTS LLC '943 GLENWOOD STATION LN S CHARLOTTESVILL 22901
4.
Applicant KATURAH ROELL/PIEDMONT DELVELOPME 2811 HYDRAULIC ROAD CHARLOTTESBILL 22901 434906270
Primary Contact SCOTT COLLINS/COLLINS-ENGINEERING 200 GARRETT ST, STE. K CHARLOTTESVILL 22902 4342933719
Signature of Contractor or Authonzed Agent Date
ti t
--........, ,......,
. '411.• o-104,---.....
_. Architectural Review Board
Preliminary Review of a Site Development Plan
ttl
Submittal Requirements Checklist
Part A: Applicant Contact and Parcel Information
Project name. &4k -�'.ps7 Cc. N c rc yi- c
Tax map and parcel#. ---76 5s�1 Z(G 7"l I - I 0 C '� "7 fr ` -5 1-=-
j
Physical street address (if assigned) 674E 7*'x-6. '-IL --1 ) ) t (- ,,1 i�
Location of property (landmarks, intersections, or other)
Contact person. t- 4- /x -et k <e.fir, ) I
Business name. 1 Cl A. 'l1 D-ti1,4- L>E' )�2_....:�- 6 ,--t
t� i �Address 2t ? I� t q 11C c City. C?7Ve State 1iftzip22°iC1
Daytime phone '13 `� 2717ZFax: Email. V tr c e) I e. `rain-t 71 C. Nc I
Part B: Preliminary Site Development Plan Requirements Checklist
Important Note Submittal packages must contain (8)collated copies of all information unless otherwise
indicated.
A. Written description of the proposal I
El Provide
Provide a general description of all proposed work. W I ) J '' 1ti7 }t
E -Explain how the proposal is compatible with the surrounding area and the Entrance Corridor
B. Site plan showing the following (drawn to the scale of 1"=20', clearly legible and folded):
dLocation(s) of proposed building(s) on the site
[''Schematic layout of parking, travelways, and other improvements.
Location of existing and proposed tree lines. Individually identify trees of a 6-inch caliper or greater
Er—Existing and proposed topography drawn with contour intervals of 2-feet, and with sufficient off-site
topography to describe prominent and pertinent off-site features and physical characteristics, but in
n case less than 50-feet outside of the site
Location and size of existing and proposed utilities and easements. Identify type of utility and extent
--,,/of easement.
LK Conceptual stormwater management plan
E' Conceptual landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
['Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings.
1
Revised 7/28/10
'goer VOW
C. Appearance of the proposed building(s)
1137:Show a representation of the appearance of the proposed building(s). This must include architectural
elevations drawn to the scale of at least 1/16"=1'-0" This may also include perspective sketches, or
photos of the proposed building(s). These documents should provide a basic understanding of.
The size, form, and scale of the building
El/he architectural style of the building
LT The proposed building materials and color(s) }--' t ) CC.c0-67
D. Additional material
2/Provide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
ErThe applicant is welcome to submit any additional material that will make the preliminary review more
productive Drawings or other submittal items that clarify topography, visibility, utilities, landscaping,
or other unique or unusual conditions are welcome.
Site sections may be useful
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a preliminary site development plan review by the ARB Additional submittal materials may be
required, depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided on this application, and all accompanying information, is accurate, true and correct
to the best of my knowledge, and that the attached plans contain all information required by this checklist.
)41-- *2Z 6
Signature of person completing checklist Date
,44 CO( 11
Pr npted Na /Title f Daytime phone number of Signatory
fii&P) 1:‘•t•-?Vi• einle
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434)296-5832 Tel, (434) 972-4126 Fax
www.albemarle.orq
2
Revised 7/28/10