Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: UVA Encompass Health Rehabilitation Hospital
WPO#2019
3640 Lonesome Pine Lane
Charlottesville, Virginia 22911
Prepared by:
Timmons Group
608 Preston Avenue, Suite 200
Charlottesville, VA 22903
Contact: John Hash, P.E.
434.327.1691
Prepared for:
Encompass Health
3600 Grandview Parkway, Suite 200
Birmingham, AL 35243
Contact: Elizabeth Mann
205.970.7850
SWPPP Preparation Date: May 24, 2019
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 1. Registration statement
(Provide a signed completed copy of the DEQ registration statement)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
DRAFT VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM FOR OFFICE USE ONLY
CONSTRUCTION ACTIVITIES ID Number:
(VAR10) REGISTRATION STATEMENT Technical Criteria: 1113 ❑ IIC ❑
NEW ISSUANCE ® RE -ISSUANCE ❑
MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑
Existing Permit Coverage Number (if applicable):
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit).
Construction Activity
Operator Name:
Contact person:
Address:
City, State Zip code:
Phone number:
Primary email:
CC Email:
B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Name: Encompass Health
Contact person: Elizabeth Mann
Address: 3600 Grandview Parkway, Suite 200
City, State Zip code: Birmingham, AL 35243
Phone number: 205-970-7850
Primary email: Elizabeth.Mann@encompasshealth.com
CC Email:
C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by
credit card and to receive your permit coverage approval letter via email:
YES ® NO ❑
DEQ 199-DRAFT PAGE 1 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT
Section II. Construction Activity Location Information. Project site information.
A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all water bodies receiving stormwater discharges from the site.
B. Construction Activity Name: UVA Encompass Health Rehabilitation Hospital
Address: 3640 Lonesome Pine Lane
City and/or County and Zip code: Charlottesville, VA 22911
Latitude and Longitude
(6-digit decimal degrees): 38.138291; 78.440016
C. Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees): Entrance located off of new road proposed by others
Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this
permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration will need
to obtain coverage under a separate VPDES permit.
A. Offsite Activity Name:
Address:
City and/or County and Zip code:
Latitude and Longitude
(6-digit decimal degrees):
B. Offsite Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section IV. Site Information.
A. Acreage totals for all land -disturbing activities to be included under
this permit coverage.
(to the nearest one -hundredth of an acre)
Total land area of development (include the entire
area to be disturbed under the approved Stormwater
6.52 AC
Management Plan):
Estimated area to be disturbed (portions with Erosion
6.52 AC
and Sediment Control Plan approval only):
Offsite estimated area to be disturbed (if applicable):
C. Property owner status:
B. Estimated Project Dates
(M M/D D/YYYY)
Start date:
12/2019
Completion date:
4/2021
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE X
D. Nature of the construction activity description (i.e.
commercial, industrial, residential, agricultural,
environmental): Commercial Rehabilitation Hospital
E. Municipal Separate Storm Sewer System (MS4)
name (if discharging to a MS4):
DEQ 199-DRAFT
Albemarle County
PAGE 2 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT
F. This construction activity is part of a common plan of development or sale: YES ® NO ❑
G. 61h Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Include additional HUCs and
receiving waters on a separate page.
HUC
RECEIVING WATERBODY(S)
020802040303
North Fork Rivanna River - Jacobs Run
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the registration
statement. By signing the registration statement, the operator is certifying that the SWPPP has been prepared.
B. Has an Erosion and Sediment Control Plan been approved for the disturbance in Section IV. A.? YES ❑ NO X
If yes, provide the date of Erosion and Sediment Control Plan approval:
C. Land disturbance has commenced: YES ❑ NO X
D. Stormwater management maintenance agreement included (if applicable): YES ❑ Not Applicable X
E. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity
Form. AS&S Entity Name (if different from the Operator identified in Section II. A.):
SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS
AND INFORMATION
DEQ 199-DRAFT PAGE 3 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT
Section VI. Certification. This Certification must be signed by a person representing the operator identified in Section II.
A. and meeting the requirements of 9VAC25-880-70. Part III. K. Please note that operator is defined in 9VAC25-870-10
as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K Signatory Requirements:
Registration statement. All registration statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this registration statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date:
Submit this form to the VSMP Authority. If DEQ is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp@deg.virginia.gov
DEQ 199-DRAFT PAGE 4 18
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
(Provide a copy of the DEQ coverage letter when obtained)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 3. Nature of activity
(Provide a detailed narrative of the construction activities. Include or reference a construction schedule
and sequence. Include any phasing.)
This project includes the construction of a rehabilitation hospital and associated parking, utilities &
landscaping. Limits of clearing and grading area is 6.52 acres.
The property is bounded by a fire rescue station and vacant land to the south. To the east, north and west
there is mostly vacant wooded property.
All construction shall take place in accordance with the Erosion and Sediment Control Sequence of
Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration
Statement.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
(Provide a reduced, 11x17 copy of the latest Erosion and Sediment Control Plan. Do not reference
only.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
EROSION AND SEDIMENT CONTROL NARRATIVE:
PROJECT DESCRIPTION
THIS PROJECT INCLUDES THE CONSTRUCTION OF A REHABILITATION HOSPITAL AND ASSOCIATED PARKING,
UTILITIES & LANDSCAPING. LIMITS OF CLEARING AND GRADING ARE 6.52 ACRES.
ADJACENT PROPERTY
THE PROPERTY IS BOUNDED BY A FIRE RESCUE STATION AND VACANT LAND TO THE SOUTH. TO THE EAST,
NORTH AND WEST THERE IS MOSTLY VACANT WOODED PROPERTY.
EXISTING SITE CONDITIONS
THE SITE WILL BE SUBDIVIDED FROM A PARCEL OWNED BY THE UNIVERSITY OF VIRGINIA FOUNDATION. THE
FUTURE PARCEL IS MOSTLY WOODED AND VACANT. SITE ACCESS WILL BE PROVIDED BY A PROPOSED ROAD,
TO THE EAST, BY OTHERS.
OFF -SITE AREAS
MINOR GRADING SHALL OCCUR ON THE ADJACENT PROPERTIES OWNED BY THE UNIVERSITY OF VIRGINIA
FOUNDATION. AGREEMENTS ARE IN PLACE FOR THIS WORK.
CRITICAL EROSION AREAS
NO CRITICAL EROSION AREA EXIST.
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL
PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED
OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION.
STORMWATER RUNOFF CONSIDERATIONS
UNDERGROUND PIPES WILL BE USED TO CONVEY STORMWATER ONSITE. THIS SITE PLAN IS PART OF AN
OVERALL DEVELOPMENT PLAN WHICH WILL UTILIZE A REGIONAL BMP TO TREAT STORMWATER RUNOFF FOR
QUALITY AND QUANTITY. REFER TO DOCUMENT TITLED "STORMWATER MANAGEMENT / BMP ANALYSIS AND
FLOODPLAN STUDY FOR THE UVA RESEARCH PARK" BY DEWBERRY & DAVIS, OCTOBER 1997. ALL EROSION
AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND THE
CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS.
STRUCTURAL PRACTICES:
1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE
PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE
MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD
TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF.
2. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIMENT BARRIERS SHAL L BE INSTALLED DOWNSLOPE OF
AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED.
ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT
SEDIMENT FROM LEAVING THE SITE.
3. STORM DRAIN INLET PROTECTION - 3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL
DRAINAGE STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM
ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION.
4. DIVERSION DIKE - 3.09 A TEMPORARY RIDGE OF COMPACTED SOIL TO DIVERT WATER FROM A CERTAIN
AREA.
5. SEDIMENT TRAP -3.13 A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE TO
DETAIN SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN 'WET" AND "DRY" STORAGE LONG ENOUGH
FOR THE MAJORITY OF SEDIMENT TO SETTLE OUT.
5.1. MAINTENANCE OF SEDIMENT TRAP- INSPECT BASIN EMBANKMENT WEEKLY TO ENSURE IT IS
STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED DURING CONSTRUCTION ACTIVITIES. THE
BASIN SHALL BE CHECKED AFTER EVERY RAINFALL EVENT. ONCE THE SEDIMENT HAS REACHED THE
DESIGNATED CLEANOUT LEVEL IT SHALL BE REMOVED AND PROPERLY DISPOSED OF.
6. DUST CONTROL - 3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO
SURFACE AND AIR MOVEMENT.
VEGETATIVE PRACTICES:
1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED
AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND
SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION.
2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30
DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING
GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT
IS APPLIED.
3. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE
COVER BY PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL
BEAUTY.
4. SOIL STABILIZATION BLANKETS & MATTING - 3.36 A PROTECTIVE COVERING BLANKET OR SOIL
STABILIZATION MAT SHALL BE INSTALLED ON PREPARED PLANTING AREAS OF CHANNELS TO PROTECT
AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF.
MANAGEMENT STRATEGIES
1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH
IMMEDIATELY FOLLOWING INSTALLATION.
2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING.
3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO
MINIMIZE PERIMETER CONTROLS.
4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER
REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW.
PERMANENT STABILIZATION
ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING
IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC.
3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND
"GENERAL SLOPES" IN THE HANDBOOK FOR SLOPES LESS THAN 3:1. FOR SLOPES GREATER THAN 3:1, SEED
TYPE SHALL BE AS SPECIFIED FOR "LOW MAINTENANCE SLOPES" IN TABLE 3.32-D OF THE HANDBOOK. FOR
MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED,
FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING.
SEQUENCE OF INSTALLATION
PHASE I (SEE SHEET C3.3)
1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR, CONTRACTOR,
OWNER, AND ENGINEER. THIS MEETING SHALL TAKE PLACE AT ALBEMARLE COUNTY COMMUNITY
DEVELOPMENT BUILDING. CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1)
WEEK OF NOTICE.
2. INSTALL CONSTRUCTION ENTRANCE, SILT FENCE, SUPER SILT FENCE AND OTHER PERIMETER MEASURES.
3. CLEAR AND GRADE SEDIMENT TRAPS.
4. INSTALL DIVERSION DIKES & INLET PROTECTION.
5. AFTER ALL EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, SITE WORK CAN BEGIN.
6. SEED ALL DENUDED AREAS PER VESCH STANDARDS.
PHASE II (SEE SHEET C3.4)
1. BEGIN ROUGH GRADING THE PROJECT AREA. INSTALL STORMWATER STRUCTURES 112, 110, 108, 106,
104, 102 & 100 ALONG WITH PIPES 111, 109, 107, 105, 103 & 101 TO DIVERT RUNOFF FROM THE "LOOP
ROAD" ACCORDINGLY. INSTALL THE END SECTION AND OUTLET PROTECTION AS NOTED ON SHEET C3.4.
SEE SHEETS C5.1 & C7.1 FOR STORM STRUCTURE DETAILS.
2. CONTINUE GRADING OPERATIONS TO ELIMINATE THE EXISTING DITCH AND ESTABLISH THE BUILDING
PAD ELEVATION.
3. ADJUST ALL DIVERSION DITCHES AND SEDIMENT TRAPS AS NECESSARY TO PREVENT SILT/SEDIMENT
FROM LEAVING THE SITE.
4. SEED ALL DENUDED AREAS PER VESCH STANDARDS.
PHASE III (SEE SHEET C3.5)
1. INSTALL ADDITIONAL INLET PROTECTION WHERE SHOWN ON THE PHASE II EROSION AND SEDIMENT
CONTROL PLAN AS THE STORM SYSTEM IS CONSTRUCTED AND BECOMES OPERATIONAL.
2. FINE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN
DAYS AFTER FINAL GRADE IS ACHIEVED.
3. ALL STORMWATER PIPING & STRUCTURES SHALL BE INSPECTED FOR SILT/SEDIMENT. IF PRESENT,
SILT/SEDIMENT SHALL BE CLEANED OUT FOR THE SYSTEM TO THE SATISFACTION OF THE E&S
INSPECTOR.
4. ONCE THE SITE UP HILL FROM A SEDIMENT TRAP HAS BEEN STABILIZED AND APPROVED BY ESC
INSPECTOR, REMOVE THE SEDIMENT TRAP.
5. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS
ACHIEVED.
6. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION
CONTROL MEASURES CAN BE REMOVED UPON APPROVAL FROM THE E&S INSPECTOR.
MINIMUM STANDARDS:
AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE
FOLLOWING CRITERIA, TECHNIQUES AND METHODS:
MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY
STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4. SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT
SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL
BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
MS-6. SEDIMENT TRAPS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE
SERVED BY THE TRAP.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE
AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL
BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE
PROVIDED.
MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR
OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL,
ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE
ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT
POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF
CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY
NONERODIBLE COVER MATERIALS.
MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY
SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT
FLOWING STREAMS OR OFF -SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE
MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED
THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED
ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL
DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.
MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL
SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS
RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT
FURTHER EROSION AND SEDIMENTATION.
MS-19.PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT
DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF
STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE
STANDARDS AND CRITERIA LISTED IN SECTION 19 OF VIRGINIA ADMINISTRATIVE CODE 9VAC25-840-40 MINIMUM
STANDARDS.
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION
AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE
LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND
EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN.
ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING,
GRADING, OR LAND DISTURBANCE.
ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES.
ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS
(INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY
EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT
CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE.
ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE)
ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING
LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT.
ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE.
ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT.
MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL
DEVICES IMMEDIATELY.
SOILS INFORMATION
47C- LOUISBURG SANDY LOAM, 7 TO 15 PERCENT SLOPES. MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC SOIL GROUP: A
47C - LOUISBURG SANDY LOAM, 15 TO 25 PERCENT SLOPES. MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC SOIL GROUP: A
94B - WEDOWEE SANDY LOAM, 2 TO 7 PERCENT SLOPES. MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC SOIL GROUP: B
94C-WEDOWEE SANDY LOAM, 7 TO 15 PERCENT SLOPES. MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC SOIL GROUP: B
TI Qp
/n� f
la, N. 31371
5-24-11
O 1
S'g7ONALO
m�
••
•
•
•
O
f
f
51612019
Z. DAHL
DESIGNED BY
A. ALLISON
CHECKED BY
J. HASH
SCALE
N/A
J
Q
I�
v I
0
z
O
Q
J
1M-I
W
I
Lu
I
J
Lu
12
`v^I
V I
Q
ca
G
O
z
w
Q
D
J
Q
Lu
(n
Lu
O
z
}< J
F LY
o Z
W O
U
ED
mw
Q
Lu
L
0-
z
_O
O
Lu
OB NO.
43266
C3.0
TH 0p
`J
In°. N. 31371
5-24- I q
y.S ..NNGi
'gTONAL L•'
A PIPE OUTLET CONDITIONS A
3do d
PIPE OUTLET TO FLAT
W AREA WITH NO
TABLE 3.31-B
ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS
"QUICK REFERENCE FORALL REGIONS'
PLANTING DATES SPECIES RATE(LBEJACREI
SEPT. 1-FEB. 15 50150 MIX OF
ANNUAL RYEGRASS
(LOLIUM MULTI-FLORUM)
CEREAL (WINTER) RYE 50.100
(SEAL ( CEREALS)
\ -� GRAVEL CURB INLET SEDIMENT FILTER
-�
COMPACTED SOL
1a =.IN I
-
11011111 M1111 i Milli i Milil i Mill i Milli I Milli I Millill M
OD CWO 3.08O
TEMPORARY DIVERSION DIKE
DEFINED CHANNEL
PLANVIEW
FEB. 16-APR. 30 ANNUAL RYEGRASS 60.100
(LOLIUM MULTI-FLORUM)
MAY 1-AUG. 31 GERMAN MILLET 50
y
/
o 0
1.SETTRE SLaPE
ALOrvc THE urvE or sTAKEs.
La
o %-
1 - Ttlj
1II =
(SETARIA ITALICA)
TB 3.31
cw.vEL FlLTER
au NOFFwA---R�-- FILTERED WA�_�
_. -
��
s
oRmE AKES AND PACT THE
ND IT IPLE INT REND OI CO
XS EAN
E NCR. EXCAVA
n
> E
o LL 3
ED O `m
4 J U
Z
TEMPORARY SEEDING PLANT MATERIALS
H
TABLE3.32-0
SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA
SECTION A -A FILTER KEY IN 6"-9"; RECOMMENDED
CLOTH FOR ENTIRE PERIMETER
A
A 3da(MIN.)
do
TOTAL LBS. PER ACRE
MINIMUM CARE LAWN
COMMERCIAL OR RESIDENTIAL 175-200 LBS.
KENTUCKY 310R TURFTYPETALL FESCUE 90.1OOY
IMPROVED PERENNIAL RVEGRASS 0.5%
KENTUCKY BLUEGRASS 0.5q
GENERAL SLOPE(3:1 OR LESS)SPECIFIC
KENTULKY 31 FESCUE 12BS. 2 L
RED TOP GRASS L
E CROP' 20 LBS.
SEASONAL NURSBS.
150 LBS.
LOW -MAINTENANCE SLOPE (STEEPER THAN 3H)
KENTUCKY31 FESCUE 1D8 LBS.
."
SEDIMENTY�
GVTIER `•Ou6e WEST
1x
GRAVEL SHAu aE vOoias. pasT ORscouesE AccREOATE.
APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT
RDADE TO A.- RTsraucruRES AND YTO
ATS
ENPROTECTEDAREAs.
IP 3.0]-6
/TO /
FL wE°�M
O '
SHEET FLOW INSTALLATION
(PE SPECTIVEVIEW)
�mqX
A
\�
C -m
; o m
u N N N
L7w w
'-'<
30'
O � w LL
F Q
0
d
U
N
w
STORMWATER INLET PROTECTION
PIPE OUTLET TO
RED TOP GRASS 2LBS.
SEASONAL NURSE CROP' 20 L85.
WELL DEFINED
CHANNEL
PLAN VIEW
CROWNVETCH •• 20 LBS.
150 LeS.
•
POINTS A SHOULD SE HICHeRTHAN POINT
SF DRAINAGEWAY INSTALLATION 3.OS2DO
O (FRONT ELEVATION) NIA O
01
TEMPORARY RIGHT-OF-WAY DIVERSIONS
USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES
AS STATED BELOW:
FEBRUARY 16TH THROUGH APRIL.................................. ANNUAL RYE
MAYIST .........................FOXTAIUAL MILLET
°or g1
1g
COARSE r:l> , MIN.
�
'�' �
BE
U"
SILT FENCE (W/O WIRE SUPPORT)
NOGmIa
� � WIRE
P D
I SET POSTS AN EXCAVATE A 4'X4' 2 STAPLE E TENOrvc TO
TRENCH uP3LOPE ALONG 1HE urvE OF THE POSTS.
PDss. �,
6
g % M9X
I-
�
D o�v
T
d
AUGUSTE TH THROUGH BRUARY 15 H........................ ANNUAL RYE
16TH THROUGH OCTOBERRYE
NOVEMBER THROUGH FEBRUARV 15TH........................ WINTER RYE
"SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF
FARMVILLE,VA(MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL
OTHER PERIODS, USE UNHULLED SERICEA). IF FLATPEA IS USED IN LIEU
OF CROWNVETCH, INCREASE RATE TO BE LBS./ACRE. ALL LEGUME SEED
MUST BE PROPERLY INOCULATED. WEEPING LLVEGRASS MAY BE
qGG RE
y
�I I
„III ILA'
6
MMIMUMrs/
C)
_
r
�
w
U
Q
O
SECTION A -A
FILTER KEY IN 6'-9'; RECOMMENDED
CLOTH FOR ENTIRE PERIMETER
NOTES:
1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE.
AOOEDTO ANY SLOPE OR LOW -MAINTENANCE MIX DURING WARMER
SEEDING PERIODS; ADD 10-20 LBSJACRE IN MIXES.
PS 3az
TYPICAL GRAVEL STRUCTURE
CDM IED
SOILPAC
10
-
°
AND EXTEND IT 4. BACKDL AN MPACT THE
THE WREHFE EXCAVATED SOIL. GD
THE TRENCH.NCE
>
DATE
51612019
PERMANENT SEEDING MIX FOR PIEDMONT AREA
DRAWN BY
Q Q Q p
71 F
STANFENCEATTACHEGEVINVL OR STIC CONSTRUCTION
2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4.
3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES.
OP 3.18-1
M
= j j
- FLDw-
•
Z. DAHL
DESIGNED BY
A. ALLISON
TS(PLE
WEATHERED
FENCE ATTACHED TO POSTS(PRE-WEATHERED WOOD,
GAZED STEEL, IRON ORTHICK PVC PLASTIC), AT LEAST
LVANI
40' ABOVE FINISH GRADE WITH SPAN BETWEEN POSTS NO
GREATER THAN 6' ON CENTER. EVERY NINTH POST SHALL
CONTAIN A WARNING SIGN THAT CLEARLY IDENTIFIES THE
FENCE AS A TREE PROTECTION FENCE,
TP NO SCALE 3.3R
MRMUM
TYPICAL EARTHEN STRUCTURE
WO 3.11-1
W D
EXTENSION OF FABRIC A THE TRENCH.
FlLTER FABRIC
RE F
SSF 3.05-1
••
• •
•
OUTLET PROTECTION
CHECKED BY
J. HASH
No Scale
SCALE
NIA
TREE PROTECTION
TEMPORARY RIGHT-OF-WAY DIVERSION
SILT FENCE (WITH WIRE SUPPORT)
TOE REQUIREMENTS FOR
BANK STABILIZATION
•
J
2 ACRES OR LESS OF DRAINAGE AREA:
X A- WOOD SILT FENCE DROP INLET PROTECTION TFRAM, WTM
GRATE
-
FILTER CLOTH UNDERLINER (PREFERRED)
e°
MAx
KIN T
EY
FILTER CLOTH
6-g
FILTER CLOTH
(OPTIONAL)
(DOWNSTREAM VIEW)
VDOT #1 COARSE
AGGREGATE
A
U U MIN �~-�� CORNERS
PERSPECTIVE MEWS
STAKE dy}Lu
FAfiRc
PERSPECTIVE VIEW
I /1
V I
O
O
(n
J
Q
MIN.
FLOC ? J 3•
IIIII J jMIN.
%V �. U
` DETAIL A
ELEVATION OF STAKE AND FABRIC ORIENTATION
THIS IME ATODIOFA INLET PROTECTION IS APPLICABLE WHERE THE INLET
IRAIII E STDSLOPE NO GREATER II
6�. WHERETHE
wiaA'
Y �a �owouxoE
a
H�
I
FH
J
ul
LLI
O
Z
FILTER CLOTH
GRANULAR FILTER
T
::.•
T
-
COARSE AGGREGATE -
MIN. THICKNESS = 6"
OCD 3.20
TYPICAL THE METHOD HALL NO APPL I INXLS RECE NNGS.) ARE
C
CONCENiRATEDEFLOWS. SUCHT ON NAS IN STREET OR HIGHWAY MEDIANS.
IP 3.0]-1
PERSPECTINEVIEWrtm
PERSPECTIVE VIEW
SAF PLASTIC FENCE METAL FENCE 3.10
0
co
W <
Q
_
w o
0
"
W
J
Q
Ir W
1 m
Q Q
LU
I^
/v`2�L
Ln
Q
/^�
LL
�
O
J
z
O
U
Z
LcLI
G
Q
LLI
(n
x
66
z
O
H
(n
O
ROCK CHECK DAM
STORM DRAIN INLET PROTECTION
SAFETY FENCE
Nosmle
o- NOTE:
ALL TREES IN A TREE PROTECTION AREA SEE CIVIL DRAWINGS FOR LOCATION OFMIN
OR ISOLATEDSPECIMENSTHATARE NOT TREE PROTECTION FENCING.
^ SPECIFICALLY SHOWN TO BE REMOVED
ARE TO BE SAVED. ANY EXCAVATION OR TEMPORARY, PARTIAL RELOCATIONS OF
TRENCHING WHICH IMPACTS THE ROOT ENCLOSURE WILL BE ALLOWED TO
SYSTEM OR CROWN BRANCHING OF ACCOMMODATE CONSTRUCTION
_ TREE(S) NEEDS TO BE CARRIED OUT NECESSARY WITHIN DRIPLINE. AS WORK
FOLLOWING THE GUIDELINES OF THE TREE WITHIN DRIPLINE CONCLUDES,
18PRESERVATION SPECIFICATIONS. THE ENCLOSURES SHALL BE REPLACED 18"
SERVICES OF CERTIFIED ARBORIST BEYOND EXTENT OF DRPLINE.
CRITICAL ROOT ZONE SHALL BE REQUIRED.
70' MIN 5:1 EXISTING
A 3' PAVEMENT
FILTER' ' ' ..IM d. A MOUNTABLE BERM
CLOTH (OPTIONAL)
EXISTING GROUND SIDE ELEVATION ''��
]0' MwASHRACK 110' MIN.
B OPTIONAL J
10 EXISTING
12'MIN.* MIN PAVEMENT
VDOT#1 COARSE AGGREGATE B POSITIVE L10'MIN.
�DRAINAGETO
'MUST EXTEND FULL WIDTH OF SEDIMENT
INGRESS AND EGRESS OPERATION TRAPPING DEVICE
PLAN VIEW
2'MIN.
TREE PROTECTION FENCE:
CON T CHAINLINK (2" MESH, 11 GA. FABRIC)
CONSTRUCTION FENCE PANELS SET ON GRADE
SECURED BY MEANS OF CONCRETE BASES. TREE
PROTECTION FENCE SHALL NOT BE SECURED BY
3'MIN.
3'MIN.
FILTER CLOTH SECTION A -A
6-r•
.:
'- ' " ''
I.NRETE
LLJ
>
0L
LU
OPENETRATING
3.19-1
THE EXISTING GRADE. MODIFIED
TP 3.38
CE REINFORCED DRAIN SPACE 3.02
O SECTION B-B
-
TOE REQUIREMENTS FOR BANK STABILIZATION
TREE PROTECTION
STONE CONSTRUCTION ENTRANCE
30B NO,
43266
No Scale
ND B ale
SHEET NO.
C3.1
Sediment Trap design T11 0pof
drainage area (aprea) (<3) 0.64
trap wlumes_ rAssr or sro ,Y �'tld5 _Z
elevaton (T) area (sr) wlume(cy) No 31941 Gc.
574 213 p
575 345 10.3 ownownrc , �A 5-24-11
5m 50.1 157
57/ 585 220 `4�ONpL
578 1. 293
579 1128 374
1148 u
.xr Pars a��� ewrsr .mFcvr cussxsru.a �o
wet storage'.
weL sLmage req.4ed (cy) (67'DA) 429 E
tlattom of stone weir (ft) 5770 v E
wet sk age provided al Lhis elevalion (cy) 487 "'- se aggregate shall be VDOT 43, #357 of #5
.lope .. Storage aides 2.1 Q u 3
en length (It) (6xDA) 3.8 _
tlry storage_ bottom of trap cicuman (ft) 574 w 0 m
dry storage required (cy) (67'DA) 42.9 bottom trap dimensions. 18X12 u J u m z
crest otstono weir 570.E top of dam Elevation (ft) 580 w - O
zjory a
dry storage provided at this elevation (cy) EC 7 top width of dam (it) 3
Slope of dry storage altleE 2:7 [op flap dimensions 40X16:: 3 C N x N
ST LL
SEDIMENT TRAP #1 u a" o
w
Sediment Trap design ~
drainage area (acres)(<3) 2.75 1.
trap wlumes' rnesroe sra o
el-atinn (ft) area (so wlNme(cy) ar
562 989 0
563 1430 448 oar naaesr K
564 1896 61 6 r
565 2388 79.3 0
566 2904 98.0 r w
567 3446 1176
401.3
.xs Mrz x. r, �s.wwsvrz Cass r..... o
wet Storage" DATE
wet storage required toy) (67DA) 184,3 >
bottom of stone weir (ft) 565.0 51612019
wet storage provided at this elevation (cy) 1857 coarse aggregate shall be VDOT 93, #357 of #5
slope of wet storage sides 2:1 DRAWN 8V
weir length (it) (6xDA) 16.5 Z. DAHL
dry storage' bottom of trap elevation (th 562
dry storage required (ey) (67"DA) 184 3 bottom trap dimensions: 99.10 • DESIGNED BY
rest of stone weir 5670 top of dam elevation (ft) 568. •
dry storage provided at this elevation (cy) 2156
top width of dam (ft) 3. A. ALLISON
slope of dry storage aides 2.1 top trap dimensions 123x34 • CHECKED BY
ST 3.13 : • J. --
SEDIMENT TRAP #2 SCALE
N/A
•
•
Sediment Trap design • J
drainage area (acres) (<3) 1 7
hap wlumes «rsror sro t�
elevation (T) area (so wlume(cy) 191,
� omrz�uw xr \y a
555 676 I ^
558 910 88.1 oar naense r v I (n
bb9 1169 38 h O J
560 1453 41.6
561 1762 59.5 warsraruc a r� 2 Q
562 209E 714""""°'e wa �nn. amx
306 1 W
wet storage: shs wa v,s-� comic uwe�a' �uzs s � O
wet storage required (cy) (6TDA) 113.9 O 0 0
bottom of stone weir (ft) 560.0 to
wet storage provided at this elevation (cy), 11b.2 "coarse aggregate shall be VDU 1 V, M1 pt #5 W
slope of wet atorage sides I4_ 2.1 L
weir length (ft) (6xDA) 10.2 1-- O
dry storage: bottom of trap elevation (ft) 555 J z
dry storage required (cy) (67'DA) 113.9 bottom trap dimensions: 40x17 II
rest of stone weir 0 top of dam elevation (ft) 5E3 > J
on,
torag se provided at this elevation (cy) 131 131 0 [op width of dam (ft) 3
slope of dry sfnrage sides 7.1 top trap dimensions fi0x47 T
o ST 1 0 z
a 3.13 'Lou O
U
U
SEDIMENT TRAP #3 U
a 00
J m Z
Q W
a
Sediment Trap design w
drainage area (acres) (3) 1 2 Ir I LU
tmpwn,mes- .„s, cusr or sro
elevalien (ft) volume(cy) /vrw xr v.Em I^
0 543 456 \`a V` ^I
n 544 634 20.2 L I
0-6
545 W3 21.2 om sroaaae - xvnL 0a z
546 1065 35.2 O
547 1318 44.1 wsrs.oaacx _ „� 1R ` H
548 159E 54.0 t`a ama (n
m 180.7 an. O O
o wet storage: U W
LY
wet storage required (cy) (671DA) 80.4
bottom of stone weir (If 548E WI
3 wet storage provided at this elevation (cy) 82.6 "coarse aggregate shall be VDOT #3, #357 of #5 Q
9 slope ofwcL slmege, sides 2.1
cir length (ft) (6xDA) 72 \
dry storage: bottom of trap elevation (ft) 543
dry stomp. required try) (67"DA) 80 4 bottom trap dimensions_ 23x20
nest of scone weir 5480 top of dam elevation (ft) 560 -
dry storage provided at this elevation (cy) 98_t rop width of dam (ft) 3
w` slope nfdry storage. sides 2-1 rop trap dimensions 51.413
sr 3.13 � 4326E
s SEDIMENT TRAP #4 SHEE N0.
Noses„ C3.2
L
EROSION CONTROL LEGEND
LIMITS OF CLEARING AND GRADING - ' , - - / / / / -!/ , / - - - - %
- - - DRAINAGE DIVIDE 530-
SOIL AREA DIVIDE /,'/J' - - -
SAF SAF-SAFETY FENCE 3.01 _ �'550' -/-'_ /� / ��' '/ '
e 1,-'-
O STEEPS OPES _ , , - _� J�_-� "' "' "-' _% _ - - - // // _ - Lac. N. 31371
CE CONSTRUCTION ENTRANCE 3.02 AlJAGED _ - i �' _= -'_� = _\ -\ i / 5 �i = _ _ /gfP(�ES�RI/�ED�, / �'
) 54 i,; 5-24-I�1 .
SILT FENCE
3.05
S$F �8� ivy SUPER SILT FENCE 3.05_-
A
- - - - - - - - _ -- - - - -\\EENTERLIN�F�7R€AM 11 \`I,\/ ( ' / y}0 LPN ° o
IP ® INLET PROTECTION 3.07 ' ' x-�-Y _-________ \`\�`�\�\\\� �\ �\ _-
>E
CIP ® CULVERTINLET PROTECTION 3.08 %iT____ SEDIMENT TRAP#3 �555-� `` " `\�`\ \ \ -- ----- �� , �' Fry
i' / l Jam_-__- \ ` ` ` \ / I //i FU 3
PHASE1 DRAINAGE AREA=1.16 AC _ _
PHASE 2 DRAINAGE AREA=1.71 AC ----_ `\ ` \ \\ ` \ - _ �\ \ \ / /' / / / // '/ yj5� oLL o 3
DD �� DIVERSION DIKE 3.09 ,' ' �5�0 % / ' ' J I' - TOTAL STORAGE REQUIRED: 227.8 CV
�' ff0 STREAM-6UFFE •� ` ` - / / / / , I / u J u m
TOTAL STORAGE PROVIDED: 306.1 CY _ _ /
f - �' TOP OF DAM ELEVATION: 563.00�SbJ'L WPE: ` , ' - - \ / / / > N
i
OP OUTLET PROTECTION 3.18 � ��' i ,' _ / /' / _ _ _- / � a y N M
SEDIMENT TRAP #2
CD CHECK DAM 3.20
- - - -__ - PHASE I DRAINAGE AREA=1.79 AC
/k__ \
PHASE 2 DRAINAGE AREA = 2.75 AC '
\ \�'lQO'TRAM'BUF�ER \ EMERGENCY SPILLWAY
TOTAL STORAGE REQUIRED: 368.5 CV
Ts TEMPORARY SEEDING 3.31 TC \ CLASS AI RIPRAP
_ TOTAL STORAGE PROVIDED: 401.3 CY /
�W%REFENgL , \ TOP OF DAM ELEVATION: 568.00 \ " / /
EM24
ERGENCY SPILL WAY_\\ �' \ \ ` \ �\ �„T`' / L
P$ PERMANENT SEEDING 3.32 �Y� 575 , " / CLASS Al RIPRAP // /
MU SF
MULCHING 3.35
TP r TREE PRESERVATION FENCE 3.38i- ' _L - _ 565- _ / SF = = - - - - - SF
DC DUST CONTROL 3.39 f=
B/M SAREAS STEEPER THAN 3:1 TO BE
TABILIZED WITH STABILIZATION 3.36 / - _ _ _ _ _ _ _ _ - - ST2 \ 1 \ ` DD _ _ _ _ _ _� - $T3 \ \\ \
_ _ v v� EMERGENCY SPILLWAY
BLANKET l i v v v v CLASS Ai RIPRAP
SOILTYP-E-.- - ---_� -
_ _ _ _ _ SEDIMENT TRAP #4 u
rVII.-M D SEDIMENT CONTROL HANDBOOK" SPECIFICATION NUMBER 47C-A _ ' _ - \ PHASE 1 DRAINAGEAREA=1.16AC
57�TOTAL LIMITS OF/'HASE 2 DRAINAGE AREA = 0.00 AC o
DISTURBANCE = 6.52 ACRES _ _ _ - \ \ -I�01 - - _ - - - \ \ \ TOTAL STORAGE REQUIRED: 160.8 CY 'TOTAL STORAGE PROVIDED: 180.7 CY
DDTOP OF DAM ELEVATION: 550.00QDO
WIREFEN§ESEDIMENT TRAP #1_�DD , ' _ - 1II'543PHASE 1 DRAINAGE AREA = 0.64 AC -- - :-- ""585-____--�;=\
-PHASE 2 DRAINAGE AREA = 0.64 AC ; _- - � _ _ 5� - �_ �= _ ___ _ I I i }� .� - " -- � \\ I 11 1 \ I I I I I \ ST4 / � / 11 ••
l I - TOTAL STORAGE PROVIDED: g1480 CY -- ��- I_ - -�_- ,I`/Ir rllll ` ` \ _--- - - - --
DRAINAGE' / - DC _ - ------ \ \ \ I �Q I •
I TOP OF DAM ELEVATION: 580.00_ _- _ ' = _� / _ _ / i+// / /q/ / / \ - - - - - �' \\ 1 I I 1 I I �' / •
\ _------___
/
\ (� i _ ��u ,III I l l r , �I� � _ i?� � �'/'� �/// V _ _ _ - - - - - _ - .5•>5� � 1 11 ( r � l r r � r i r I � I r r � r' / �' / � i � /
EMERGENCY SPILLWAY r \� *f\\ \\� - , \ I I I I III II I r , r ' ' r r '� / TS Z •
- CLASS Al RIPRAP
_-_-___-- li I r I I I I I' I I / CL
\ A
\ ST1 �- 1QUT15"RCP `
\ \ ` IN ELEV.eS)9..77'`� // \` ` _ _ _ I I\ \ DC I r r r I H I I ' / i' / _ 7C
DRAINAGE
I / DIVIDE
' I / i - / 7 . ��� \ - - - - - - •5a, \ \ \ V ` I 11 11 11 x l I I 1 1 I ' I \ V / / / ' �y / Z _ -S/
- - -DRAI GE
DI E
E LAN E i �"1- - \ - - - - - - - O
�---low
---
�`--'�J / lNlS,(N 15'
DD AVEL ROAD ELEV=5Z0.80^ V - - I v I k i
-590-
- / / � � � � ♦ r � WIRE)FENCE �
\ SOI
�
- - -- � � �» .' ''��`� ------ ----- --- --'"" \ ♦ \ \ \ 1 \ / "��`�`�, I /' I I 11 II � II ' I II //Jl / I / / / I _-----
♦
SF
CE
- - I / /
DC \� i / -I-I _ / _ INA
/ � I RA CiE 1z
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ $F I r i i ' / / % / DIVIDE
V T$
A- --- - -----
s ROAD IMPROVEMENT BY _ - _ / > • _ -
OTHERS. SEE DRAWINGS - P N s
-----
\ TITLED "UVA RESEARCH - - - - - - - - $ sAN, ;AN sAN -�sdN s �\
56 PARK LOOP ROAD"
STORM INLET - - - / SCALE V=30'
W _ _I - ) ' - -- � , l�
TOPELEV 57256' - 0 30' 60'
INV. OUT=569.16' 18"RCP 560- - - /
5/6/2019
DRAWN 8V
Z. DAHL
DESIGNED BV
A. ALLISON
J. HASH
SCALE
1"-30'
J
O
= W
a
O a
Q z
~ a
LJ-I J
> Cf
_
L� z
LI o O
u U
w �
= Q z
Jw Lu
W a
Lu
= (n
U) 06
In
z
Qa O
o
O of
U w
z
LLJ
\Q
D
loB No.
43266
C3.3
EROSION CONTROL LEGEND
LIMITS OF CLEARING AND GRADING - _ , - - - / ' / 0 , ' !, r - -
��������� DRAINAGE DIVIDE 530-
SOIL AREA DIVIDE - _ _ _ _ - - - - - �- -
OSAF -SAF- SAFETY FENCE 3.01 _ - - - - ' - 550 _/- '_ - ' - - - / 'i' /5"�yi-
STEEPS OP�
CONSTRUCTION ENTRANCE 3.02 -'_-�_
�'rIAA%JAGEDJ _ - " - ' ; ' i , - _ - - ' /' " ,646
CE �� 'fpljES�RDEDr'-
SF --X SILT FENCE 3.05 / ' - '-/,�/ -
i i
SSF �Q(-jp� SUPER SILT FENCE 3.05 / / ' /'I,1rja323 - -- _ \ - _ _ _ _ _ _ _ _ / _ \ �\ EEN3ERLlN�FST7R AM 1 ll \ - `\ ` �� /' /' _ _ ' ' 640- j
IP ® --------
INLET PROTECTION 3.07 ,' / i 9 ,/i//__-_��x�
CIP ® CULVERTINLET PROTECTION 3.08'i%/%lT_______-'
DD �0 DIVERSION DIKE 3.09
- - -! -: ,
ff0 STREAM \ \ \�\\ •�\ ` � � � / / / / / /
OP OUT ET PROTECTION 3.18 \ \
�
CD CHECK DAM 3.20 %\' /, �,' /, / \ SEDIMENT TRAP #2 \ \ \ \ \\ \ PORTION OF SITE TO BE RAISED
_ -PHASE 1 DRAINAGE AREA = 1.79 AC \` \ \ \ \ ` `
swglNc uAGLJ� / - PHASE 2 DRAINAGE AREA=2.75 AC �'` - \ \\ TO FINAL GRADE TO ALLOW FOR, \ ` ' i ' , , .' �•
_ _\ �\ /\�'%QO'S�'\TR M'BUF�ER STORM PIPE INSTALLATIONTOTAL STORAGE
TS TEMPORARY SEEDING 3.31 REQUIRED:
OVIDED4o83 CY 1 \ TC \ \ EMERGENCYS
O _ TOTAL STORAGE PR / \ _
EMERGENCY SPILLWAY' _ ` \ \ \`\ CLASS Al RIPRAPLL - \ \�►� /' c sfwanaP y
/ _ _ OP OF DAM ELEVATION: 568.00 \\ \ \
WAY
PS � �' / CLASS Al RIPRAP �_ T .�' \ ` \ \lam i-` •_ � � 7E // //
PERMANENT SEEDING 3.32 _ X� 'S76 �, � � �'/ �' � `' _ \
MULCHING . X1T0R.D0 21
' 555 ,
r TREE PRESEVON FENCE 3.38 566Fi
DC DUST CONTROL 3.39
AREAS STEEPER THAN 3 1 TO BE / _ _ _ _ _ _ - "'_/- / ! /� \ SSS ST3 \ \ \ i a� L
B/M STABILIZED WITH STABILIZATION 3.36 i _ - _ / _ _ _ ST2
SOIL TYPE': - - - - 11 11 1 _ _ _ - DO Sss \ IP 7 z
* "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" SPECIFICATION NUMBER 47c - A 0
5,� TOTAL LIMITS OF - _"� - - ' \ \ \ _ , _ _ _ _ \ r \ , / SF •56
_-- DISTURBANCE =6.52 ACRES- ___--�_ \ \ \ -(/
_ - - - -_
I
DD
SEDIMENT TRAP #1 - i _ - -580e-� __ �r `- - _ \ \ 1 1 I \ 1 I 1 \ II �� \ -
,� �^ PHASE I DRAINAGE AREA = 0.64 AC - -585 ` . 1 I \ \ ` / 1 \ I 1 1 I III II II I 1 104
• ) _PHASE 2 DRAINAGE AREA = 0.64 AC - -
TOTAL STORAGE REQUIRED: 65.80 CY
TOTAL STORAGE PROVIDED: 114.80 CY'-_��- _ - - - _ _ _ _ _
I TOP OF DAM ELEVATION: 580.00_- _ ' = �' ' / - _ - _ -' i��+/ / / , / / \
`; SEDIMENT TRAP#3
� /, ,l \ \\ � � �_ - �-'--_ � PHASE DRAINAGE AREA=1.ifi AC I I I
-'ice-- = ---- �� __--
\ �,/l� \ \ _ \ PHASE DRAINAGE AREA =1.71 AC
ollI r / -�i < _ TOTAL STORAGE REQUIRED: 227.8 CY S I
� -- / I TOTAL STORAGE PROVIDED: 306.1 CY.
5gc - - - - - 7 ' TOP OF DAM ELEVATION: 563.00 EMERGENCY SPILLWAY / / �'_ / �\\t I� I I I rl / II % - i ,,' „/ „ - - .STS\ 1 \I 1 ( I ' / I i ' i I I I / /
AV111�t'' '\ ----- I I I I I I
CLASS Ai RIPRAP _ _ _ _ _ _ _ _ _ _ _ - - _ I 1 I 1 I 1 I , , , , INSTALL STORM INLETS &PIPES
TO CONVEY OFFSITE RUNOFF /
FROM THE "LOOP ROAD"
T11
/n� f
Inc. N. 31371
5-24-11
O i
S'gIONAL 0
•
m�
' 105
I ST1 _� v v V _ Av . A �-��II, OIL TYPE
DRAINAGE
DIVIDE -'�'..'!
DRAINAGE
- - -- DIVIDE
----- �` I Al \V I I I II I I I I I I II I I 11 II II 1V I II A/' /' / /' / ' IF
\ �I op
106
'--�----
DD �s / / ' I A . v� I I I I I I II I I / ,dRAINAGE / ' / 1 107
-590- II I II II 'DIvJ6E,' // /' /' y >'�-----
-_ SOIL TYPE:
------------
IP
\ CE ------------' / ' I -
r I
- _ _ ---_ _ - - / / 112 / ' 108
_ A �` ` - - -SBS- ------------------- - - - - -- ------/
log
-
IF
- _
rs,, _---- - - ---- -- -- ----- _
A _
'LOOP RO D , v - - - / _ �r / 10 /
s ROAD IMPROVEMENT BY -
\ OTHERS. SEE DRAWINGS
SAN S �..
\ p 4 TITLED " LIVA RESEARCH - - - - - -W - - - - - - - - ` sAN, sAN si�N BAN TsdN
PARK LOOP ROAD" - -- ---- wows,.- sI''
575 - / ' - - - _
SCALE V=30'
STORM LET
2.5'X2.5' __ - _ l r
TOP ELEV=572.56' ^ r ° r � / r \ - '- - 0 30. 60'
INV. OUT 569. 16' 18"RCP H I I _ - - /
Q
❑
DATE
51612019
DRAWN BY
Z. DAHL
DESIGNED BY
A. ALLISON
CHECKED BV
J. HASH
SCALE
J
O N
2 w
z LO
a
O a
Q z
~ a
IJ-I J
> Cf
_ � z
Lu o O
u U
w �
= Q z
Jw Lu
Lu a 0
12 (ij
v I 06
cn z
Qa O
of
O of
U w
z
Lu
Q
D
OB NO,
43266
C3.4
EROSION CONTROL LEGEND
LIMITS OF CLEARING AND GRADING {/
- - - DRAINAGE DIVIDE - ' _ _ -_' - - - s,/ \i / i 530 -
SOIL AREA DIVIDE -
OSAF —SAF— SAFETY FENCE 3.01
STEEPS OP�_'
�'rIAA%JAGEDJ _ ' " - ' - ' i ' ', - _ - -_ _ _ _ ,6q5 — - - - - - i� /gT�-EP,SL6P
CE CONSTRUCTION ENTRANCE 3.02 �� 'fpljES�RDEDr
SF -- X SILT FENCE 3.05 l \ (
S$F �8� ivy SUPER SILT FENCE 3.059"E- _19� _ _ \ \� _ _ _
---�-� - _--------- �sEN3€RtmiP\stm€atoll Is , /SqD-
IP ® INLET PROTECTION 3.07 �' / rSA ,/,i�"`-_= +____________--- \\\�`�`\`\�\`\ \ I _____` \`'I��\/ ' S�PN-'
' \ i' /
CIP ® CULVERTINLET PROTECTION 3.08'�y%�//�/,/�l*-�T---___,-' �5_� \\`\\ \ \`\ \\\ \ \--______-
DD �o DIVERSION DIKE 3.09 i'/57Ui'%/,i, ' J �' _ _ _ _ C
' � STRERM-6liFF ` � \ •� \ ` � _ \ \`\ / / / / / /
OP OUTLET PROTECTION 3.18 �',�� �/ / ' / _ _ / i l\ - - _-1 \\ \ \\ `\ \\.S�L�y.E \��`\\�-\`
CD CHECK DAM 3.20
TS TEMPORARY SEEDING 3.31 ��' /� i' '// '�` i 1
` I ��F
PS PERMANENT SEEDING 3.32 /%��575 /� i i' / i ikI\ \\ \ \ \ \ \ \ \ \ - l�A i wfo i
l � M'B \
TITI
U y50
1111 o
/w
DEPTH za
MULCHING 3.35 '
O_ - --_- \ _ - _
i
TP r TREE PRESERVATION FENCE 3.38 ' i / ,' �- - 6'- �5� / - _ \ I - /555�
i ' 5
_
\
DC DUST CONTROL 3.39','-�5s--
B/M PS
AREAS STEEPER THAN 3 1 TO BE / i "� - B/M STABILIZED WITH STABILIZATION 3.36 / / I ` - - - - - - _ - ' ' _ - - - - - - - - 0 M PS 7
BLANKET / '.� I _____- - - - \ \ \� \ IP
SOIL TYPE: - -- — — _ _ DC z
' ' \
* "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" SPECIFICATION NUMBER %" / _ _ - _ 47�- - A ' - - - - - - - - - �h
` I IP
_ /
5'" TOTAL LIMITS OF _
_ _ - - - - DISTURBANCE = 6.52 ACRES - DC
ps
DC
_ ____---- I I I I ' I ITI - /
AI I I I I I I I I I I I
PS /
f
/n�
Lac. N. 31371
5-24-19
O i
�S'glONAL �0
m9
> E
L.,z
>oN
zw ym
a
K
w
IN
o'
txJ
x
r
0
w
a
K
0
o
5/6/2019
DRAWN
DATE
8V
Z. DAHL
•
DESIGNED BY
•
A. ALLISON
•
CHECKED BY
J. HASH
• •
SCALE
1"=30'
\� / ,', � V� AA V, - PS // � � �'-4Q �/ � � � � — ---------- -- --_— V �, I, 'I � ', I ', I � � ' � / � ' ' / � '� / ,' ,-' STD' • J
=s�
pS PS
OQ
'
IP --
_ ___---__CL
0 sPS gGILL TYPE-.'
MU M'
CDC) /-_-_-__ 7'�
I LM.
U)PS
�lrt`(ID -570 -r7 T
i
—_ —
MU / d']_ - i \ --- IP
` IP I I I v v v IP / Z
� V \1 I I II II I\ 1 1 I 1 IV AV � / /' // / ' � Q
Ps Mu
DC 0
of
LIL OMUSOIL TYPE: pWU-----_ PS 94B
PS MU --- Lu
Z
PRovosE RE PS I I A \ , l l I I , I ' HAef—ON—PITA� o••: ,' �' �, / J m
IF L0
�J W
PS 572. / \ / / / / , , I I / / /
577 ' , I I I I / / .....—..r....<........ ' / PS w- -----z <
= UT
- - --577— - PS 576 _ _ s`S/y. _ _ _ _ _ _ _ --c_ _� I I' —� ' (n L yj3\ Z
PS / z S>2 B/M _ _ _ _ _ _ U)
5 O
COOP ROf1D , - ;
s - - -' " ROAD IMPROVEMENT-
\ '' OTHERS. SEE DRAWINGS _ i_ - - - - - w
p ' TITLED "UVA RESEARCH - - - - - 6AN, F= 4 N rsdN
-- ----
u �, \ W--$------�_ SAN I $ / SLIN / /, / SAN z
r , PARK LOOP ROAD" ---- _fir —Ww — — -- — %I — —
m , � � Lu
575_
` 1 loB No.
-
J _ _ _ _ - _ \ .� / / / / , , SCALE 1"=30' 43266
2.5'X2.5' I JI 0 30' 60'SHEET NO.
TOP ELEV.=572.56' ^ ' o / � / T- '� - 77 58I0- - -
o' INV. OUT 569. 16' 18"RCP H I I _ -
L
Section 5. Stormwater Management Plan
(Provide a reduced 11x17 copy of the latest stormwater management plan. Do not reference only.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
/ E FENG�E
`
la, N. 31371
5-24-19
IONAL
G�$�' i'W/RE1`ENCP' / / / / _(___________ \\ 5fi5 00
/ ' ,%� 4% __ ________
W/R FENCE -- — —'\
— — — — — _ —
----------------
/ /-------
-----------_' / / _ 135
/--____---_-- = _ '--"--_,--_ -_-� \
/ _----' _-_-_---- -- 4" .w '
' ------ "-" _ -°
> MET
--------------
j DATE
- _ - _ - - _ - _ _ - _ _
- - - - - - - K
--_ 5/6/2019
DRAWN 8V
_ / 1
\ — — — — — — \ S%S\ Z. DAHL
F90 139 — SS _ _ _ • A. ALLISON
_
CHECKED BY
-______
142
114
CL
PROPOSED REHABILITA-IION'Hi sPITQL �8�- O
144 _ FEE=573'25. \ \
/Lo 1 124
w - Z
' \ w Q
kill co
--- LU
CO § C7
w
/ \ w Q Q
.,�rq�/
_ -----" i - \ w w � Q
_------- ------ I /s — — --- a o-6
M M A K. \0' \ \ S SAS i _ \ 2 Q
\ \ / (n
Ln
0
� �c�_572
577 — — — — — 571 — — / / /'
_ _ Z
577 _576 S� S� _ _ _ _ _ _ �._
_— _ _ _ _ — ' O
148
___--- -----—------—— --
�S Lda'ROAD — — _ — — - - _- --- ----- --- ;� - -- - / NPR D
-- SCALE 1"=20' —
N0' o
-------------- SAN o 20' 4roe3266
d — ----- - --- — ------ „ -mow— — — — — — C5.0
"0
/I
STEEP SLOPES la, No. 31371
(MANAGED) _ - ,_ ; " i ' �,� i _\� yy5 _ _ _ / �gpPS. '' \ - i i -'
y /�%' -C 5-24-19
.�� RVED
Sl ONAL Eta
hh�/ �.< 39"E _ _ - _ _ \\ EEN3ERtlN�F�7R€AM �p �PN
/
ro
11`__" - ---� _ �555-
u m z
/swgNcuAGLJ�!— ------ ---'" _\ \�)qO-#R Ma U R
WIREFFpr�,//
24
_565- - _ _ _ _ _ _ _ _ -
--- -- --- - - - - -- \ 5
'W/RE FENCE END
/LEG _ \ 585
_ -570- _ 570 O
/AREA C_ __- - - - - -- 134
INLET_ _--_'_-----� _ \ \ \
.50
--- --- 570
DATE
-'�__�I�� 571A
03
5/6/2019
DRAWN BY
670 \ \ \ \\ \\ \ 11 1 11 11 1 1 \ / �� 04 Z. DAHL
8
n- "
_ _ - , _ - ...
/ 5 �� � - b \ ` �Z .... DESIGNED BV
Li/ / . -'/ --- ,585 _ _ - - o 5 1 1 1 1 1 _ - ••
A. ALLISON
I � / � ' / i �; � 55 '' / /// ` \ � ----" �\ \ � 1 1 1 1 1 1 I i I I I 1 r , 0.220.35 � •
_ _ — — CHECKED BY
325'
\FFE325 \ 1 1 1 I 1 - 132 / ' J. HASH
1 � I
/� .' / �� SCALE
y�
� � �-__ --_- -_-_-_ ___ 1"_30,
FE6]3.2rt
F E 5/' / /1 I / •
7 z5'
� / \ v v v / v Y' I 0.06 0.90 ]3.zs•
FFE-ft,3.25' ` 1 _-FFE--5N.2k'
eb�
0,891,- - - - v v I I , I H 012 090/67 \ _ ��--____ __ �4 / 143��� FFE=54 . 1 I / / �♦ - m I z
'�_,__ -'� � ♦ 142 / / I/ �i"��138� � / � � .�`� � - - - - -�o I v i 1 51 1 I 1 v 1 � 1 11 ' 1 II ` ,' / /� 05 �♦� z - -5�
44
�_ i � / / � '•� � - _ � ---- ----- 12 I 1 1 I I / // 572 fps _----- � � Z
46 1 ' V `, - - .FFE--57_25. AI A 1 1 I , 1 1 I A / / Q a
\ 1 I I 1 1 1 1 1 1 1 1 1 3\ ' 121
JS,Y �� / 1 I I 1 / ' / ^rye --- �'I-- of
I A I 1
T11� > Q
I ZZ G
147 0.20 0.90 W p
0.17 0.81
q14
- FFE=5]325•
.' 144 I 5Y3 I A v IPA / 1 11 1 1 1 1 I I I 1 /'''r� 6.3p o.as I a W
S -- -/ - - - I -- I \ \ I I � / 1 I 11 I I 1 I I I 1 / /
�.I 1 I� _ _ / 'LU -- --- rll\ ' / ' I / l l I r ' 0.570.90 / Q
FEE=5]Y5'
Lu 2:
Q
`578- - 577— -576 _>SS1Q. - - - - - _14 - - - - 146 - - - - : I I I 5�... ♦ z (n
V
1 / 0.17 0.41
y -5B0
----�1- -- 3 — _ _-T-4 — °�-- _ _ ♦ SAN
W -- ------ a SANS SAN 8 Nam— SANS-r-T-r SAN / , ♦ /------�-- - Z
B0 _ W—iIT-W_ _- _ �. �\ I I S1 'II r 1 / l _l -�l
—Vy� = �N'T-�W LI..I
- — — = — W Q
-7 / -- Dii ---\ /�-'------.rr---�-
_ 575_
_ _ >
SCALE 1'=30' I B No. o 'S ` h I - 1 •\.r - ` / `' 575 _ - _ / / / / 1
_ - - ' ' 0 30' 60. 43266
II 2.5'X 2.5' I �C 1 ♦�.� SHEET NO.
TOP ELEV 57256' / o / \♦/ ` ._ _--
\ o' 1 \ 1' 1NV. OUT 569 16' 18"RCP y 1 I I ♦♦/ _ - SBO - - C6. 6
L
LD�347 PROJECT: UVA ENCOMPASS HEALTH REHABILITATION HOSPITAL
HYDRAULIC GRADE LINE ANALYSIS
INCIDENCE PROBABILITY I Year
DESIGNED BY: A. MABEE
Checked:
LD-229
STORM SEWER DESIGN COMPUTATIONS
STORM FREQUENCY 10
PROJECT: UVA ENCOMPASS HEALTH REHABILITATION HOSPITAL D-iig-d by: A. MABEE
LOGA ION: ALULMARLL. COUNTY
COUN IY: Ch.,I.Hce M Ch.eked by:
NOAA STATION.
UNITS ENGLISX
II2
DII
2gl�l
!22�1
Il.i�
��.IIT!
Bw-1c'Lr.
llnnmaln
n.�)n
av
o.m
.11
ZwL;.
0
I
0
0
AhcuA/1U.
-
ORkiH1
11,.,.11
z.
a
1
,1Ili
41-'B41111
5111
57175
11111i
1i
1]0
1t 11)
U.11'1
-I
U.-16N
2112
2.QW
0.91-
6.1-
1-IK
�Ji�
1.160
b. 0
1.'1!N
1. Q(i
II.
(1.000
207
rO1
141,
DI-.M1R
111)0
It
(iOfi
f110Y
1tn 11
)„lt
11+1
-I
IIL2
11
—
111 ?li
11.1)?IM
i 1fM
—
—
II.IKK22
1.—
1).9'li
—
11.11iX
II Ili2'1
—
—
I—
—
119311
—
1252
;190.11
21111,
092
1.IDfi
T=N.011
TFI Q�r
/n� f
lac. N. 31371
5-24-19
0 1
S'gIONAL O
00
> E
v E
u � 3
¢Ju z
zjo a
zw�p
M I uui
oe= o
o
r ¢' "'IE
in
z
00
c�
x
r
O
w
U O
O
DATE
51612019
00
DRAWN BY
Z. DAHL
• DESIGNED BY
• A. ALLISON
• CHECKED BY
J. HASH
• • SCALE
• N/A
•
•
• J
C a
o
z z
O o
O a
�- U
cc J J
— U
m �
Q w
W a
O G-
TT W
1 Q w
� J
EDz_
z W a Y
=Q
O Lu
a �
� o
o cn
U
z
w
Q
D
3 N.
43266
SHEEP N0.
C6.1
SCALE V=60'
PROJECT SUMMARY /
- - DEVELOPMENT AREA = 6.27 AC
IMPERVIOUS COVER =4.12AC
PERVIOUS COVER 2.15 AC / y
� IE
STORMWATER NARRATIVE
sit �_ _ANIa
III
�e
__ RR.
T-DEVELOPEDO
L '21,E
aVmil , /
111
THIS PROJECT INCLUDES THE CONSTRUCTION OF A REHABILITATION HOSPITAL AND ASSOCIATED PARKING, UTILITIES & LANDSCAPING. THIS DEVELOPMENT WILL UTILIZE EXISTING ACCESS POINTS DIRECTLY ADJACENT TO THE PROPERTY. SEE PROJECT TITLED
"UVA RESEARCH PARK LOOP ROAD" FOR ADDITIONAL INFORMATION.
PER THE DOCUMENT TITLED "STORMWATER MANAGEMENT / BMP ANALYSIS AND FLOODPLAN STUDY FOR THE UVA REASEARCH PARK AT NORTHFORK' BY DEWBERRY & DAVIS, OCTOBER 1997, THE RESEARCH PARKING PONDS HAVE BEEN MASTER PLANNED FOR
STORMWATER MANAGEMENT FOR THE FUTURE BUILD -OUT OF THE RESEARCH PARK.
THIS DEVELOPMENT DRAINS TO THE LARGE WETPOND, DESIGNATED POND 1, TO THE NORTH THAT WAS DESIGNED AND CONSTRUCTED TO HANDLE QUANTITY AND QUALITY FOR THE FUTURE BUILD -OUT OF THE RESEARCH PARK, INCLUDING THIS PROPERTY
DEVELOPMENT. THIS POND IS REFERRED TO AS POND 1 ON SDP 199800043. FOR THE APPROVED DRAINAGE AREAS AND CN VALUES, SEE DRAINAGE SUBBASIN MAP - DEVELOPED CONDITION, FLAT BRANCH - TRIBUTARY TO NORTH FORK RIVANNA RIVER, UVA
RESEARCH PARK AT NORTH FORK.
THE PROPOSED DEVELOPMENT WAS ANALYZED TO DETERMINE THE AMOUNT OF IMPERMEABLE AND PERMEABLE SURFACE AREA. THESE VALUES HAVE BEEN INCORPORATED INTO THE OVERALL CN VALUE FOR THE DRAINAGE AREA MAP PREVIOUSLY APPROVED
IN DRAWINGS BY OTHERS. FOR ADDITIONAL INFORMATION AND ASSOCIATED STORMWATER MANAGEMENT EXHIBIT FOR POND 1, REFER TO DESIGN CALCULATIONS & NARRATIVE BOOKLET ASSOCIATED WITH THIS DEVELOPMENT.
`I'II OF G
14AS z
I.ie. Na 31TA
5-24-IG 6�
IONA'
0E
0
0
w
0
K
'o
•
a
z
O
f
f
DATE
51612019
DRAWN BY
Z. DAHL
DESIGNED BY
A. ALLISON
CHECKED BY
J. HASH
SCALE
1"=60'
t
I
z
O z
Q
Q a
J z
w
m < 57
w
= z
LLi o z
w <J
Of ^'
L.L
JD, w
m �
Q a Q
W
2 g
U) 0
O
Q ul
d
O
z
w
OB NO.
43266
C6.2
i
146: DI-38 8 ft ThroatA
DI-313 8 ft Throat
STA 12+02.03
DI-3B 8 ft Throat
DI-3C 6 ft Throat
102: DI-3C 8 ft Throat
STA 15+41.47
STA 11+32.76
TOP 571.02
STA 12+94.71
STA
TOP 570.84
TOP 571.65
INV IN 564.94 (147)
�141:
INV IN 564.22 (143)
[111:
TOP 569.61
[134:
569.3.70
TOP 569.34
INV IN 561.83 (135)
INV IN 561.50 (131)
INV OUT 564.84 (145)
INV IN 566.28 (141)
iu�i ni it zaa �� ��aa�
INV IN 563.42 (137)
INV OUT 563.32 (1351
INV OUT 561.73 (133)
INV IN 561.55 (103)
IN
OUT 553.50(
01)
1
590
590
/
\
I
565 @
/
\
585
1
Q
E
O
~
�m
N.
580
'mOZDOME
n
m
" � 1
m
m�Mci
N
w ~
580
a0m0»mFOOOzz
�vi??a575
575
FUTURE
GRADE
570
570
TERLINES
\
1
\
1' MIN
\
565
\
/
E.
147
143
\
132.76' OF
6' OF
54.65' OF
\
12" HDPE
15" HDPE
39.9390E
52.74 OF
74'
(2
@ 0.75 %
15" HDPE
HDPE
560
1457
@ 0.75%
@ 0.75%
@
135
560
14.62' OF
199.00' OF
133
\
12" HDPE
18" HDPE
327.63' OF
\
@ 0.75%
@ 0.75%
24" HDPE
\
@ 0.75%
555
\
EX. GROUND
555
\
550
550
9+50 10+00 11+00 12+00 13+00 14+00 15+00
5
0
0 50
PROFILE SCALE
HORIZ SCALE: 1 "=50'
VERT SCALE: 1"=5
�
r7
O
U
3
_
124: 15" Basin with Dome Grate
"
m
o N
'O
STA 10+24.38
F
�+Nr
dap
TOP 572.68
0
INV IN 568.74(125)
��0>
�mr--
z
�FO>
wmFz
INV OUT 568.64(123)
■
4
F U
YO �'Z mo Nm
unmi mN w
monk-
umi
~
U�oN�C6'M
Mt- ��zz
0���0 oazZO
�uriO
m t-
p�v�i z_p
> o~Ozzz �¢a>
m F z N f--- �
y O z
¢a»»
-� O Z Z z z
EX GROUND
590
590
585
585
580
580
575
575
FUTURE
GRADE
570
570
565
565
141
120.71' OF
12" HDPE
@ 0.75 %
560
560
555
555
16+00 17+00 18+00 18+50 9+50 10+00 11+00
STRM 142-140
HORIZ SCALE: 1"=50'
VERT SCALE: 1"=5
12
M�colb�
F, zzp
o N0>>>
580
580
\
FUTURE
575
GRADE
575
\
570
570
565
123
121
125
181.30' OF
98.92' OF
24.38' OF
10"HDPE
/
12" HDPE
10' HDPE
@0.75%
\
@3.00%
@1.21%
560
\
560
EX. GROUND
555
1
555
580
580
575
575
FUTURE
GRADE
570
570
565
565
560
560
131
74.15' OF
12' HDPE
@ 3.00
$55
555
GROUND
550
550
545
545
12+00 9+50 10+00 11+00 11+50
o
m
v$
U2
o
o
fO
a
E
o
0
w
E
102: DI-3C 8 ft Throat
N
m w
o o
oorpon
o mF
m�O1�F
v n
MT
m
moor
+ri6�
v
mNNF
o cO1i `
m
104: DI-313 8 ft Throat
STA 14+76.01
STA 15.41.47
TOP 570.84
INVIN 561.50131
( )
,p
m 1 N
�A
�urzO
o�mzp
p�uizz�
TOP 571.61
INV IN 561.55
N¢0
O
mrO»
Qa-0
"¢ate>Qa--O
m�Ozz
rOrO»>
INV IN 562.14(105)
(103)
m�Oz
¢a�
MHO
�mFz
>
z
�mFzz
�wt-__
?m0zzz
NV OUT 562.04(103)
INV IN 559.27133
( )
�mt--
580
580
EX GROUNIE
575
/
575
\
FUTU
E
/
\
GRAD
570
570
565
A�
\
565
111
109
116.50' OF
04.47' OF
07
24" HDPE
102".1 V OF
I
0.7%
5
@ 0.75%
24@ HDPE
\
560
@ 0.75%
\
560
105
152.93'OF
,47I'1SO0%3
371.72' OF
24" HDPE
410
24HDPE
@ 0.75%
O`
@ 2.64%
555
555
\
550
550
9+50 10+00 11+00 12+00 13+00 14+00 9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 16+50
STRM 126-106 STRM 112-102
HORIZ SCALE: 1"=50' HORIZ SCALE: 1"=50'
VERT SCALE: 1"=5 VERT SCALE: 1"=5
TFI Q�
/n� f
�'e�1as z
)a, No 31371
5-24-11
0 1
�S'glONAL �G
o p
> E
v E
u b 3
a�� z
O
�>o ataw ^'6
z
uuon
oe= o
z
00
c�
x
0
w
U O
0
DATE
' 51612019
o
� DRAWN 8V
F. M53AMAME
• DESIGNED BY
• FALAS67SME
• CHECKED BY
F. N1HI48AF1E
• • SCALE
•
•
• J
LQ
r
U)
O
z
O O
LQ
r
1-- LA
co iz:
w0I LL
W O
O
ci� W a
0
J m O
z LLJ
Qa�
0V)
Q
c�
G
O
z
w
\Q
D
JOB No,
43266
SHEET NO.
C7.1
L
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
(Provide a reduced I Ix17 copy of a site plan on which all of the following activity locations are clearly
marked. Keep this plan up-to-date with ongoing site changes and inspections.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
u. hources of ronutants. locations. ana
Pollutant, or Pollutant Location on site Prevention Practices,
Generating Activity Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and un-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbent/oil dry for all paving
machines to limit leaks ands ills
Concrete washout shall occur in area
Direct concrete wash water into a leak -
Concrete washout and
adjacent to the construction entrance as
proof container or leak -proof settling basin
cement waste
designated on the Pollution Prevention
that is designed so that no overflows can
Plan.
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing com ounds.
Dewatering if necessary when
Water shall be filtered, settled or similarly
Dewatering operations
converting culvert inlet protection
treated prior to discharge as shown on
shown on plans
plan,
Designated areas for material delivery and
Material delivery and storage
Adjacent to construction entrance and
storage. Placed near construction
construction trailer.
entrances, away from waterways and
drainage paths
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Material use during building process
Building areas
Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
waterway. Containers have lids covered
before periods of rain, or are in a covered
area. Scheduled collection to prevent
As provided by contractor
overfilling. MATERIALS NOT TO BE
Solid waste disposal
BURIED ON -SITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash area is located at the construction
control as specified on plan. Minimize
Wash Waters
entrance. Adjacent diversion dike will
the discharge of pollutants from
divert wash water to sediment trap.
e ui ment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other
materials present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing
site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater
discharges.)
D. Non-stormwater discharges
Discharge Pollutants or Pollutant Location on Site
Constituents
Dust control water Sediment As shown on plan
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Discharge Pollutants or Pollutant Location on Site
Constituents
E. Persons responsible for pollution prevention practices
(Provide the names and contact information for all persons responsible for prevention practices as listed
above.)
Elizabeth Mann
3600 Grandview Parkway, Suite 200
Birmingham, AL 35243
205-970-7850
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement
chemical spill and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows;
Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage
trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter,
sand, saw dust, and plastic and metal trash containers.
All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of
discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash
containers for disposal.
Report all spills, leaks and discharges as follows;
(Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.)
Reports will be made to the following:
Virginia Department of Emergency Management
Emergency Operations Center (EOC)
Phone: (800) 468-8892
Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
G. Pollution Prevention Awareness
(Describe training and procedures to provide awareness and compliance for all measures in this
document; waste management, wash waters, prevention measures, etc.)
The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention
measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land
disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by
registered land disturber each time a new E&SC procedure is constructed.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
-560
oe
570
\
=58=
I
%//y°//111/1vj
00,
III/I I/ / 5y5 / //%/ //
vo�-
y' /
— — — ' CONSTRUCTION
TRAILER ` _ ` — /� \ \ \ I IIII 1 I 1111 11 1 / / / / / / 570—
_ 1 1 I
\\ I I I IIIII IIIIIIII\ // // / ��--—
� .� PROPOSED
CONSTRUCTION ABOVE GROUND FUEL CONTAINER
/ WITH IMPERMEABLE HEAVY -MIL
ENTRANCE / LINER. VOLUME SUFFICIENT TO \ ` 1 I I III *IIII ► 1 1 I / / J / / / / / —
CONTAIN STORED FUELED S \ \ ' 'VOLUME /10/(GAS/DEISEL I ' ►IIII '/IIIIIIII IIJill
TEMPORARY \A/ 'A'
CONCRETE WASHOUT r /I ' r
\ s,s�
L
co -
MORTAR MIXING STATIONT—j rt —I —I— l I / / / y/
\ \ \ \ \ \ /
moo_
S�s�\`\\ — DUMPSTE-575
R
UVA ENCOMPASS HEALTH REHABILITATION HOSPITAL
POLLUTION PREVENTION PLAN - PHASE 1 MAY 2412019
SCALE 1 "=60'
1 OEM
0 60' 120'
•000000
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
-560
585
I
/ /�h/ \ T \ \ I I ► 111 II III /� _,—'/ ''''/ /
lo
�----------�—\
\
'/ /' I / � h / /'� ��— � i i � ��� \.\�✓�>� \�� \ \ \ I I Illllllyllll ll, l / //// //, //// / // � ��--�
I CONSTRUCTION 570—
TRAILER el
` _ _1_ — \ < \ �— — — — �\ \\ — — — — / °� \ \ \ I IIIII ► 1 1 1 1 1 1 \1 1 / // / // /'/// / �� / / /' / / I�
�—� \
PROPOSED _ —IJ
ABOVE GROUND FUEL CONTAINER
CONSTRUCTION / WITH IMPERMEABLE HEAVY —MIL \ \ \ \ \
— — / ENTRANCE \ \ / \ I I I I I I I I I I I I 1 I ► I / / J / / , / / ' I — — — .
_ I / (LINER. VOLUME SUFFICIENT TO
rICONTAIN STORED FUELED � —
,/ 1VO1 I IMF .�16%TG-ASQFISEL
' TEMPORARY �—�—_ -- // // I �I►I ► III II I II II I _� ��, ✓11 ► II 1
/
TOILETS \ r/ — /.�. COilCRETE WASHOUT — _ — I , ♦ \\ \\\ / / / / ' /'III I II I ;I
MORTAR MIXING STATION y/
580—
ER
S�S�\�\\\\\\\ \ DUMPST_ _—_____ — ' J / , ' ' / / /' �J _--575
lo—
—
UVA ENCOMPASS HEALTH REHABILITATION HOSPITAL
POLLUTION PREVENTION PLAN - PHASE 2 MAY 2412019
.•••0
SCALE 1 "=60'
0 60' 120' TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
------------------
Ki NN %
/ / \ , .,, _ � % /i � \ \ \ - \ ► I I I ( III 1 1 I / / / � / / ,: ", ? /
5g0
CONSTRUCTION
TRAILER
PROPOSED
AINERABOVE GROUND FUEL CONT
TEMP ORARY-
TOILETS CONSTRUCTION WITH IMPERMEABLE HEAVY -MIL
.. I'
ENTRANCE—
_ I_ LINER. VOLUME SUFFICIENT TO
CONTAIN STORED FUELED
VOLUME + 10% (GAS/DEISEL \ \ \ / I / ) I I I I I I I I I I III / / / I / V;l
// � / I � I
\ \ l r \ ,,1 CONCRETE WASHOUT D
1,
_—
\ —MORTAR MIXING STATION — \ / / / / I I I I /
--------------------------
-
\
--- J - - - - --
--
\
\ _ -----II—-_--- — — — ---_ / / s
-575
UVA ENCOMPASS HEALTH REHABILITATION HOSPITAL
POLLUTION PREVENTION PLAN - PHASE 3 MAY 2412019
•0000
SCALE 1 "=60'
0 60' 120' TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
Section 7. Discharges to impaired waters, surface waters within an applicable
TMDL wasteload allocation, and exceptional waters.
This site discharges to impaired waters as detailed on the following sheets.
Enhanced inspection frequency is required as outlined below:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business
days or (ii) at least once every five business days and no later than 48 hours following a
measurable storm event. In the event that a measurable storm event occurs when there are
more than 48 hours between business days, the inspection shall be conducted on the next
business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
Addition items for implementation:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site.
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 8. Qualified personnel
The following personnel are responsible for inspections;
(Provide the name, telephone number, and qualifications of the qualified personnel conducting
inspections.)
Elizabeth Mann
3600 Grandview Parkway, Suite 200
Birmingham, AL 35243
205-970-7850
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 9. Signed Certification
(Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this
certification should be the owner of the property, the same signature as appears on the bonds and
applications. Another operator can be designated on the delegation of authority form to follow.)
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted
is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
Owner/Operator Name:
Company:
Title:
Signature:
Date:
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
(Provide the persons or positions with authority to sign inspection reports or to modify the stormwater
pollution prevention plan. A formal, signed delegation of authority is needed.)
Delegation of Authority
I, (name), hereby designate the person or specifically described position below
to be a duly authorized representative for the purpose of overseeing compliance with environmental
requirements, including the Construction General Permit, at the
construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans
and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set
forth in the Construction General Permit (CGP), and that the designee above meets the definition of a
"duly authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 11. General permit copy
(Provide a copy of the construction general permit, 9VAC25-880)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
General Permit No.: VAR10
Effective Date: July 1, 2014
Expiration Date: June 30, 2019
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION
ACTIVITIES
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT
In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia
Stormwater Management Act and regulations adopted pursuant thereto, operators of construction
activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of
Virginia, except those specifically named in State Water Control Board regulations that prohibit such
discharges.
The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization
and Special Conditions, Part 11 - Stormwater Pollution Prevention Plan, and Part III - Conditions
Applicable to All VPDES Permits as set forth herein.
General Permit No.: VAR10
Page 1 of 23
PART I
DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS
A. Coverage under this general permit.
1. During the period beginning with the date of coverage under this general permit and lasting until the
general permit's expiration date, the operator is authorized to discharge stormwater from construction
activities.
2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or
asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal
areas, borrow areas) located on -site or off -site provided that:
a. The support activity is directly related to the construction activity that is required to have general
permit coverage for discharges of stormwater from construction activities;
b. The support activity is not a commercial operation, nor does it serve multiple unrelated
construction activities by different operators;
c. The support activity does not operate beyond the completion of the last construction activity it
supports;
d. The support activity is identified in the registration statement at the time of general permit
coverage;
e. Appropriate control measures are identified in a stormwater pollution prevention plan and
implemented to address the discharges from the support activity areas; and
f. All applicable state, federal, and local approvals are obtained for the support activity.
B. Limitations on coverage.
1. Post -construction discharges. This general permit does not authorize stormwater discharges that
originate from the site after construction activities have been completed and the site, including any
support activity sites covered under the general permit registration, has undergone final stabilization.
Post -construction industrial stormwater discharges may need to be covered by a separate VPDES
permit.
2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are
mixed with sources of nonstormwater, other than those discharges that are identified in Part I E
(Authorized nonstormwater discharges) and are in compliance with this general permit.
3. Discharges covered by another state permit. This general permit does not authorize discharges of
stormwater from construction activities that have been covered under an individual permit or required
to obtain coverage under an alternative general permit.
4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface
waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated
Report or for which a TMDL wasteload allocation has been established and approved prior to the
term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended
solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this
general permit unless the operator develops, implements, and maintains a SWPPP that minimizes
the pollutants of concern and, when applicable, is consistent with the assumptions and requirements
of the approved TMDL wasteload allocations. In addition, the operator shall implement the following
items:
General Permit No.: VAR10
Page 2 of 23
a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be
identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously
covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A
3 c are not eligible for coverage under this general permit unless the operator implements the
following:
a. The exceptional water(s) shall be identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to exceptional waters.
6. There shall be no discharge of floating solids or visible foam in other than trace amounts.
C. Commingled discharges. Discharges authorized by this general permit may be commingled with other
sources of stormwater that are not required to be covered under a state permit, so long as the
commingled discharge is in compliance with this general permit. Discharges authorized by a separate
state or VPDES permit may be commingled with discharges authorized by this general permit so long as
all such discharges comply with all applicable state and VPDES permit requirements.
General Permit No.: VAR10
Page 3 of 23
D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges
covered by this general permit shall be composed entirely of stormwater associated with construction
activities. All other discharges including the following are prohibited:
1. Wastewater from washout of concrete;
2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds,
and other construction materials;
3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
4. Oils, toxic substances, or hazardous substances from spills or other releases; and
5. Soaps, solvents, or detergents used in equipment and vehicle washing.
E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction
activities are authorized by this general permit when discharged in compliance with this general permit:
1. Discharges from firefighting activities;
2. Fire hydrant flushings;
3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been
used and the wash water has been filtered, settled, or similarly treated prior to discharge;
4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge;
5. Potable water sources, including uncontaminated waterline flushings;
6. Routine external building wash down where soaps, solvents or detergents have not been used and
the wash water has been filtered, settled, or similarly treated prior to discharge;
7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or
where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or
detergents have not been used; and where the wash water has been filtered, settled, or similarly
treated prior to discharge;
8. Uncontaminated air conditioning or compressor condensate;
9. Uncontaminated ground water or spring water;
10. Foundation or footing drains where flows are not contaminated with process materials such as
solvents;
11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have
been filtered, settled, or similarly treated prior to discharge; and
12. Landscape irrigation.
F. Termination of general permit coverage.
1. The operator of the construction activity shall submit a notice of termination in accordance with
9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met:
General Permit No.: VAR10
Page 4 of 23
a. Necessary permanent control measures included in the SWPPP for the site are in place and
functioning effectively and final stabilization has been achieved on all portions of the site for which
the operator is responsible. When applicable, long term responsibility and maintenance
requirements shall be recorded in the local land records prior to the submission of a notice of
termination;
b. Another operator has assumed control over all areas of the site that have not been finally
stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For residential construction only, temporary soil stabilization has been completed and the
residence has been transferred to the homeowner.
2. The notice of termination should be submitted no later than 30 days after one of the above conditions
in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the
date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through
1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in
subdivision 1 a of this subsection shall be effective upon notification from the department that the
provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice
of termination, whichever occurs first.
3. The notice of termination shall be signed in accordance with Part III K of this general permit.
G. Water quality protection.
1. The operator must select, install, implement and maintain control measures as identified in the
SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that
the operator's discharge does not cause or contribute to an excursion above any applicable water
quality standard.
2. If it is determined by the department that the operator's discharges are causing, have reasonable
potential to cause, or are contributing to an excursion above any applicable water quality standard,
the department, in consultation with the VSMP authority, may take appropriate enforcement action
and require the operator to:
a. Modify or implement additional control measures in accordance with Part II B to adequately
address the identified water quality concerns;
b. Submit valid and verifiable data and information that are representative of ambient conditions and
indicate that the receiving water is attaining water quality standards; or
c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3.
All written responses required under this chapter must include a signed certification consistent with Part
III K.
General Permit No.: VAR10
Page 5 of 23
PART II
STORMWATER POLLUTION PREVENTION PLAN
A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a
registration statement and implemented for the construction activity, including any support activity,
covered by this general permit. SWPPPs shall be prepared in accordance with good engineering
practices. Construction activities that are part of a larger common plan of development or sale and disturb
less than one acre may utilize a SWPPP template provided by the department and need not provide a
separate stormwater management plan if one has been prepared and implemented for the larger
common plan of development or sale.
The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans
such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of
the federal Clean Water Act or best management practices (BMP) programs otherwise required for the
facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All
plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan
incorporated by reference does not contain all of the required elements of the SWPPP, the operator must
develop the missing elements and include them in the SWPPP.
Any operator that was authorized to discharge under the general permit issued in 2009, and that intends
to continue coverage under this general permit, shall update its stormwater pollution prevention plan to
comply with the requirements of this general permit no later than 60 days after the date of coverage under
this general permit.
A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items:
1. General information.
a. A signed copy of the registration statement, if required, for coverage under the general VPDES
permit for discharges of stormwater from construction activities;
b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of
stormwater from construction activities (i.e., notice of coverage letter);
c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction
activities;
d. A narrative description of the nature of the construction activity, including the function of the
project (e.g., low density residential, shopping mall, highway, etc.);
e. A legible site plan identifying:
(1) Directions of stormwater flow and approximate slopes anticipated after major grading
activities;
(2) Limits of land disturbance including steep slopes and natural buffers around surface waters
that will not be disturbed;
(3) Locations of major structural and nonstructural control measures, including sediment basins
and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or
similarly treat sediment, that will be installed between disturbed areas and the undisturbed
vegetated areas in order to increase sediment removal and maximize stormwater infiltration;
(4) Locations of surface waters;
General Permit No.: VAR10
Page 6 of 23
(5) Locations where concentrated stormwater is discharged;
(6) Locations of support activities, when applicable and when required by the VSMP authority,
including but not limited to (i) areas where equipment and vehicle washing, wheel wash
water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels,
fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling
and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on
the construction site; and (vi) construction waste storage; and
(7) When applicable, the location of the on -site rain gauge or the methodology established in
consultation with the VSMP authority used to identify measurable storm events for inspection
purposes.
2. Erosion and sediment control plan.
a. An erosion and sediment control plan approved by the VESCP authority as authorized under the
Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as
defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan
prepared in accordance with annual standards and specifications approved by the department.
Any operator proposing a new stormwater discharge from construction activities that is not
required to obtain erosion and sediment control plan approval from a VESCP authority or does
not adopt department -approved annual standards and specifications shall submit the erosion and
sediment control plan to the department for review and approval.
b. All erosion and sediment control plans shall include a statement describing the maintenance
responsibilities required for the erosion and sediment controls used.
c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a
plan," or erosion and sediment control plan prepared in accordance with department -approved
annual standards and specifications, adequately:
(1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion;
(2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to
minimize erosion at outlets and to minimize downstream channel and stream bank erosion;
(3) Minimizes the amount of soil exposed during the construction activity;
(4) Minimizes the disturbance of steep slopes;
(5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount,
frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater
runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the
site;
(6) Provides and maintains natural buffers around surface waters, directs stormwater to
vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless
infeasible;
(7) Minimizes soil compaction and, unless infeasible, preserves topsoil;
(8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any
clearing, grading, excavating, or other land -disturbing activities have permanently ceased on
any portion of the site, or temporarily ceased on any portion of the site and will not resume for
a period exceeding 14 days; and
General Permit No.: VAR10
Page 7 of 23
(9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the
permanent pool or wet storage water surface elevation), unless infeasible, when discharging
from sediment basins or sediment traps.
3. Stormwater management plan.
a. New construction activities. A stormwater management plan approved by the VSMP authority as
authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-
870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10
from the VSMP authority, or a stormwater management plan prepared in accordance with annual
standards and specifications approved by the department. Any operator proposing a new
stormwater discharge from construction activities that is not required to obtain stormwater
management plan approval from a VSMP authority or does not adopt department -approved
annual standards and specifications shall submit the stormwater management plan to the
department for review and approval.
b. Existing construction activities. Any operator that was authorized to discharge under the general
permit issued in 2009, and that intends to continue coverage under this general permit, shall
ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the
VSMP Regulation, including but not limited to the water quality and quantity requirements. The
SWPPP shall include a description of, and all necessary calculations supporting, all post -
construction stormwater management measures that will be installed prior to the completion of
the construction process to control pollutants in stormwater discharges after construction
operations have been completed. Structural measures should be placed on upland soils to the
degree possible. Such measures must be designed and installed in accordance with applicable
VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits
must be obtained.
4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -generating
activities that may reasonably be expected to affect the quality of stormwater discharges from the
construction activity, including any support activity. The pollution prevention plan shall:
a. Identify the potential pollutant -generating activities and the pollutant that is expected to be
exposed to stormwater;
b. Describe the location where the potential pollutant -generating activities will occur, or if identified
on the site plan, reference the site plan;
c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or
will be commingled with stormwater discharges from the construction activity, including any
applicable support activity;
d. Identify the person responsible for implementing the pollution prevention practice or practices for
each pollutant -generating activity (if other than the person listed as the qualified personnel);
e. Describe the pollution prevention practices and procedures that will be implemented to:
(1) Prevent and respond to leaks, spills, and other releases including (i) procedures for
expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii)
procedures for reporting leaks, spills, and other releases in accordance with Part III G;
(2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and
maintenance activities (e.g., providing secondary containment such as spill berms, decks,
spill containment pallets, providing cover where appropriate, and having spill kits readily
available);
General Permit No.: VAR10
Page 8 of 23
(3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction
materials, including the clean-up of stucco, paint, form release oils, and curing compounds
(e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with
stormwater; (ii) collection and proper disposal in a manner to prevent contact with
stormwater; and (iii) a similarly effective means designed to prevent discharge of these
pollutants);
(4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water,
and other types of washing (e.g., locating activities away from surface waters and stormwater
inlets or conveyance and directing wash waters to sediment basins or traps, using filtration
devices such as filter bags or sand filters, or using similarly effective controls);
(5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The
container or basin shall be designed so that no overflows can occur due to inadequate sizing
or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner
consistent with the handling of other construction wastes. Liquid concrete wastes shall be
removed and disposed of in a manner consistent with the handling of other construction wash
waters and shall not be discharged to surface waters;
(6) Minimize the discharge of pollutants from storage, handling, and disposal of construction
products, materials, and wastes including (i) building products such as asphalt sealants,
copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides,
herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and
domestic wastes such as packaging materials, scrap construction materials, masonry
products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or
building materials;
(7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes,
and sanitary wastes; and
(8) Address any other discharge from the potential pollutant -generating activities not addressed
above; and
f. Describe procedures for providing pollution prevention awareness of all applicable wastes,
including any wash water, disposal practices, and applicable disposal locations of such wastes, to
personnel in order to comply with the conditions of this general permit. The operator shall
implement the procedures described in the SWPPP.
5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL
wasteload allocation established and approved prior to the term of this general permit, and
exceptional waters. The SWPPP shall:
a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters
identified in 9VAC25-260-30 A 3 c, when applicable;
b. Provide clear direction that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events; and
(3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B
5.
General Permit No.: VAR10
Page 9 of 23
6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel
conducting inspections required by this general permit.
7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part
III K, to sign inspection reports or modify the SWPPP.
8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K.
B. SWPPP amendments, modification, and updates.
1. The operator shall amend the SWPPP whenever there is a change in the design, construction,
operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters
and that has not been previously addressed in the SWPPP.
2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified
personnel, or by local, state, or federal officials, it is determined that the existing control measures are
ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the
SWPPP shall include additional or modified control measures designed and implemented to correct
problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary
for the control measure, revisions to the SWPPP shall be completed no later than seven calendar
days following approval. Implementation of these additional or modified control measures must be
accomplished as described in Part II G.
3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control
measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that
will implement and maintain a control measure.
4. The operator shall update the SWPPP no later than seven days following any modification to its
implementation. All modifications or updates to the SWPPP shall be noted and shall include the
following items:
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of the site; and
(3) Stabilization measures are initiated;
b. Documentation of replaced or modified controls where periodic inspections or other information
have indicated that the controls have been used inappropriately or incorrectly and where modified
as soon as possible;
c. Areas that have reached final stabilization and where no further SWPPP or inspection
requirements apply;
d. All properties that are no longer under the legal control of the operator and the dates on which the
operator no longer had legal control over each property;
e. The date of any prohibited discharges, the discharge volume released, and what actions were
taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge; and
g. Measures taken to address any evidence identified as a result of an inspection required under
Part 11 F.
General Permit No.: VAR10
Page 10 of 23
5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K.
C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a
copy of the notice of coverage letter near the main entrance of the construction activity. For linear
projects, the operator shall post the notice of coverage letter at a publicly accessible location near an
active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall
maintain the posted information until termination of general permit coverage as specified in Part I F.
D. SWPPP availability.
1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the
SWPPP available at a central location on -site for use by those identified as having responsibilities
under the SWPPP whenever they are on the construction site.
2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon
request to the department, the VSMP authority, the EPA, the VESCP authority, local government
officials, or the operator of a municipal separate storm sewer system receiving discharges from the
construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are
present, notice of the SWPPP's location must be posted near the main entrance of the construction
site.
3. The operator shall make the SWPPP available for public review in an electronic format or in hard
copy. Information for public access to the SWPPP shall be posted and maintained in accordance with
Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at
a time and at a publicly accessible location convenient to the operator or his designee but shall be no
less than once per month and shall be during normal business hours. Information not required to be
contained within the SWPPP by this general permit is not required to be released.
E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments,
modifications, and updates from commencement of land disturbance until termination of general permit
coverage as specified in Part I F.
1. All control measures must be properly maintained in effective operating condition in accordance with
good engineering practices and, where applicable, manufacturer specifications. If a site inspection
required by Part II F identifies a control measure that is not operating effectively, corrective action(s)
shall be completed as soon as practicable, but no later than seven days after discovery or a longer
period as established by the VSMP authority, to maintain the continued effectiveness of the control
measures.
2. If site inspections required by Part II F identify an existing control measure that needs to be modified
or if an additional control measure is necessary for any reason, implementation shall be completed
prior to the next anticipated measurable storm event. If implementation prior to the next anticipated
measurable storm event is impracticable, then alternative control measures shall be implemented as
soon as practicable, but no later than seven days after discovery or a longer period as established by
the VSMP authority.
F. SWPPP Inspections.
1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit
shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator
is responsible for insuring that the qualified personnel conduct the inspection.
2. Inspection schedule.
a. Inspections shall be conducted at a frequency of:
General Permit No.: VAR10
Page 11 of 23
(1) At least once every five business days; or
(2) At least once every 10 business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted no later than the next
business day.
b. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due
to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection
frequency may be reduced to once per month. If weather conditions (such as above freezing
temperatures or rain or snow events) make discharges likely, the operator shall immediately
resume the regular inspection frequency.
c. Representative inspections may be utilized for utility line installation, pipeline construction, or
other similar linear construction activities provided that:
(1) Temporary or permanent soil stabilization has been installed and vehicle access may
compromise the temporary or permanent soil stabilization and potentially cause additional
land disturbance increasing the potential for erosion;
(2) Inspections occur on the same frequency as other construction activities;
(3) Control measures are inspected along the construction site 0.25 miles above and below each
access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature
intersects the construction activity and access does not compromise temporary or permanent
soil stabilization); and
(4) Inspection locations are provided in the report required by Part II F.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and when applicable the date and rainfall amount
of the last measurable storm event;
(2) Record the information and a description of any discharges occurring at the time of the
inspection;
(3) Record any land -disturbing activities that have occurred outside of the approved erosion and
sediment control plan;
(4) Inspect the following for installation in accordance with the approved erosion and sediment
control plan, identification of any maintenance needs, and evaluation of effectiveness in
minimizing sediment discharge, including whether the control has been inappropriately or
incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping
measures;
(c) Completed earthen structures, such as dams, dikes, ditches, and diversions for
stabilization;
General Permit No.: VAR10
Page 12 of 23
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other measures installed to control
sediment discharge from stormwater;
(f) Temporary or permanent channel, flume, or other slope drain structures installed to
convey concentrated runoff down cut and fill slopes;
(g) Storm inlets that have been made operational to ensure that sediment laden stormwater
does not enter without first being filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access paved roads for minimizing
sediment tracking;
(5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for initiation of stabilization activities;
(6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for completion of stabilization activities within seven days of reaching grade or stopping work;
(7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu
of a plan," or erosion and sediment control plan prepared in accordance with department -
approved annual standards and specifications has not been properly implemented. This
includes but is not limited to:
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that
have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to
remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins
that discharge to surface waters. Inlets and catch basins with failing sediments controls
due to improper installation, lack of maintenance, or inadequate design are considered
unprotected;
(d) Sediment deposition on any property (including public and private streets) outside of the
construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed on portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins that
allow the discharge of stormwater from below the surface of the wet storage portion of
the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow the
discharge of stormwater from below the surface of the wet storage portion of the trap;
and
(h) Land disturbance outside of the approved area to be disturbed;
(8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper
implementation, maintenance and effectiveness of the procedures and practices;
(9) Identify any pollutant generating activities not identified in the pollution prevention plan; and
General Permit No.: VAR10
Page 13 of 23
(10) Identify and document the presence of any evidence of the discharge of pollutants prohibited
by this general permit.
4. Inspection report. Each inspection report shall include the following items:
a. The date and time of the inspection and when applicable, the date and rainfall amount of the last
measurable storm event;
b. Summarized findings of the inspection;
c. The location(s) of prohibited discharges;
d. The location(s) of control measures that require maintenance;
e. The location(s) of control measures that failed to operate as designed or proved inadequate or
inappropriate for a particular location;
f. The location(s) where any evidence identified under Part II F 3 a (7) exists;
g. The location(s) where any additional control measure is needed that did not exist at the time of
inspection;
h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as
a result of the inspection or to maintain permit compliance;
i. Documentation of any corrective actions required from a previous inspection that have not been
implemented; and
j. The date and signature of the qualified personnel and the operator or its duly authorized
representative.
The inspection report and any actions taken in accordance with Part II must be retained by the operator
as part of the SWPPP for at least three years from the date that general permit coverage expires or is
terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection
report does not identify any incidents of noncompliance, the report shall contain a certification that the
construction activity is in compliance with the SWPPP and this general permit. The report shall be signed
in accordance with Part III K of this general permit.
G. Corrective actions.
1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as
practicable but no later than seven days after discovery or a longer period as approved by the VSMP
authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP
authority, or the department) is necessary, additional control measures shall be implemented to
minimize pollutants in stormwater discharges until such approvals can be obtained.
2. The operator may be required to remove accumulated sediment deposits located outside of the
construction activity covered by this general permit as soon as practicable in order to minimize
environmental impacts. The operator shall notify the VSMP authority and the department as well as
obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the
removal of sediments accumulated in surface waters including wetlands.
General Permit No.: VAR10
Page 14 of 23
PART III
CONDITIONS APPLICABLE TO ALL VPDES PERMITS
NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor
stormwater discharges or control measures, the operator must comply with the requirements of
subsections A, B, and C, as appropriate.
A. Monitoring.
1. Samples and measurements taken for the purpose of monitoring shall be representative of the
monitoring activity.
2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or
alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures
have been specified in this general permit. Analyses performed according to test procedures
approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under
regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46).
3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and
analytical instrumentation at intervals that will ensure accuracy of measurements.
B. Records.
1. Monitoring records and reports shall include:
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) and time(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
2. The operator shall retain records of all monitoring information, including all calibration and
maintenance records and all original strip chart recordings for continuous monitoring instrumentation,
copies of all reports required by this general permit, and records of all data used to complete the
registration statement for this general permit, for a period of at least three years from the date of the
sample, measurement, report or request for coverage. This period of retention shall be extended
automatically during the course of any unresolved litigation regarding the regulated activity or
regarding control standards applicable to the operator, or as requested by the board.
C. Reporting monitoring results.
1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in
accordance with this general permit, unless another reporting schedule is specified elsewhere in this
general permit.
2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided,
approved or specified by the department; or in any format provided that the date, location, parameter,
method, and result of the monitoring activity are included.
General Permit No.: VAR10
Page 15 of 23
3. If the operator monitors any pollutant specifically addressed by this general permit more frequently
than required by this general permit using test procedures approved under 40 CFR Part 136 or using
other test procedures approved by the U.S. Environmental Protection Agency or using procedures
specified in this general permit, the results of this monitoring shall be included in the calculation and
reporting of the data submitted in the DMR or reporting form specified by the department.
4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic
mean unless otherwise specified in this general permit.
D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which
the board may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating this general permit or to determine compliance with this general permit. The board,
department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans,
specifications, and other pertinent information as may be necessary to determine the effect of the wastes
from his discharge on the quality of surface waters, or such other information as may be necessary to
accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall
also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required
to be kept by this general permit.
E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports
on, interim and final requirements contained in any compliance schedule of this general permit shall be
submitted no later than 14 days following each schedule date.
F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in
compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater
discharge from a construction activity.
G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of
sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous
substance or oil in an amount equal to or in excess of a reportable quantity established under either 40
CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs
during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge
that may reasonably be expected to enter surface waters, shall notify the Department of Environmental
Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24
hours after said discovery. A written report of the unauthorized discharge shall be submitted to the
department and the VSMP authority within five days of discovery of the discharge. The written report shall
contain:
1. A description of the nature and location of the discharge;
2. The cause of the discharge;
3. The date on which the discharge occurred;
4. The length of time that the discharge continued;
5. The volume of the discharge;
6. If the discharge is continuing, how long it is expected to continue;
7. If the discharge is continuing, what the expected total volume of the discharge will be; and
8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or
any future discharges not authorized by this general permit.
General Permit No.: VAR10
Page 16 of 23
Discharges reportable to the department and the VSMP authority under the immediate reporting
requirements of other regulations are exempted from this requirement.
H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a
"bypass" or "upset," as defined herein, should occur from a facility and the discharge enters or could be
expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours,
the department and the VSMP authority by telephone after the discovery of the discharge. This
notification shall provide all available details of the incident, including any adverse effects on aquatic life
and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to
the department and the VSMP authority within five days of discovery of the discharge in accordance with
Part III 1 2. Unusual and extraordinary discharges include but are not limited to any discharge resulting
from:
1. Unusual spillage of materials resulting directly or indirectly from processing operations;
2. Breakdown of processing or accessory equipment;
3. Failure or taking out of service of some or all of the facilities; and
4. Flooding or other acts of nature.
I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect
surface waters or may endanger public health.
1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the
time the operator becomes aware of the circumstances. The following shall be included as
information that shall be reported within 24 hours under this subdivision:
a. Any unanticipated bypass; and
b. Any upset that causes a discharge to surface waters.
2. A written report shall be submitted within five days and shall contain:
a. A description of the noncompliance and its cause;
b. The period of noncompliance, including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time it is expected to continue; and
c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The department may waive the written report on a case -by -case basis for reports of noncompliance
under Part III I if the oral report has been received within 24 hours and no adverse impact on surface
waters has been reported.
3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in writing
as part of the SWPPP. The reports shall contain the information listed in Part III 12.
NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP
authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours,
leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the
Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-
8892.
General Permit No.: VAR10
Page 17 of 23
4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect
information in any report, including a registration statement, to the department or the VSMP authority,
the operator shall promptly submit such facts or correct information.
J. Notice of planned changes.
1. The operator shall give notice to the department and the VSMP authority as soon as possible of any
planned physical alterations or additions to the permitted facility or activity. Notice is required only
when:
a. The operator plans an alteration or addition to any building, structure, facility, or installation that
may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-
420;
b. The operator plans an alteration or addition that would significantly change the nature or increase
the quantity of pollutants discharged. This notification applies to pollutants that are not subject to
effluent limitations in this general permit; or
2. The operator shall give advance notice to the department and VSMP authority of any planned
changes in the permitted facility or activity, which may result in noncompliance with state permit
requirements.
K. Signatory requirements.
1. Registration statement. All registration statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a
responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the
corporation in charge of a principal business function, or any other person who performs similar
policy -making or decision -making functions for the corporation; or (ii) the manager of one or more
manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the
explicit or implicit duty of making major capital investment recommendations, and initiating and
directing other comprehensive measures to assure long-term compliance with environmental laws
and regulations; the manager can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for state permit application requirements; and
where authority to sign documents has been assigned or delegated to the manager in
accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or
ranking elected official. For purposes of this chapter, a principal executive officer of a public
agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer
having responsibility for the overall operations of a principal geographic unit of the agency.
2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information
requested by the board or the department shall be signed by a person described in Part III K 1 or by a
duly authorized representative of that person. A person is a duly authorized representative only if:
a. The authorization is made in writing by a person described in Part III K 1;
b. The authorization specifies either an individual or a position having responsibility for the overall
operation of the regulated facility or activity such as the position of plant manager, operator of a
well or a well field, superintendent, position of equivalent responsibility, or an individual or position
having overall responsibility for environmental matters for the operator. (A duly authorized
General Permit No.: VAR10
Page 18 of 23
representative may thus be either a named individual or any individual occupying a named
position); and
c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to
the department and VSMP authority, if requested.
3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a
different individual or position has responsibility for the overall operation of the construction activity, a
new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority
as the administering entity for the board prior to or together with any reports or information to be
signed by an authorized representative.
4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following
certification:
"I certify under penalty of law that I have read and understand this document and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit
noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water
Act, except that noncompliance with certain provisions of this general permit may constitute a violation of
the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds
for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial
of a state permit renewal application.
The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean
Water Act for toxic pollutants within the time provided in the regulations that establish these standards or
prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been
modified to incorporate the requirement.
M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the
expiration date of this general permit, the operator shall submit a new registration statement at least 90
days before the expiration date of the existing general permit, unless permission for a later date has been
granted by the board. The board shall not grant permission for registration statements to be submitted
later than the expiration date of the existing general permit.
N. Effect of a state permit. This general permit does not convey any property rights in either real or
personal property or any exclusive privileges, nor does it authorize any injury to private property or
invasion of personal rights, or any infringement of federal, state or local law or regulations.
O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal
action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant
to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except
as provided in general permit conditions on "bypassing" (Part III U) and "upset' (Part III V), nothing in this
general permit shall be construed to relieve the operator from civil and criminal penalties for
noncompliance.
P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the
institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to
which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water
Control Law or § 311 of the Clean Water Act.
General Permit No.: VAR10
Page 19 of 23
Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all
facilities and systems of treatment and control (and related appurtenances), which are installed or used
by the operator to achieve compliance with the conditions of this general permit. Proper operation and
maintenance also includes effective plant performance, adequate funding, adequate staffing, and
adequate laboratory and process controls, including appropriate quality assurance procedures. This
provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by
the operator only when the operation is necessary to achieve compliance with the conditions of this
general permit.
R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or
management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such
materials from entering surface waters and in compliance with all applicable state and federal laws and
regulations.
S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of
this general permit that has a reasonable likelihood of adversely affecting human health or the
environment.
T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an
enforcement action that it would have been necessary to halt or reduce the permitted activity in order to
maintain compliance with the conditions of this general permit.
U. Bypass.
1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any
portion of a treatment facility. The operator may allow any bypass to occur that does not cause
effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient
operation. These bypasses are not subject to the provisions of Part III U 2 and 3.
2. Notice
a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall
submit prior notice to the department, if possible at least 10 days before the date of the bypass.
b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in
Part III I.
3. Prohibition of bypass.
a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take
enforcement action against an operator for bypass unless:
(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage.
Severe property damage means substantial physical damage to property, damage to the
treatment facilities that causes them to become inoperable, or substantial and permanent
loss of natural resources that can reasonably be expected to occur in the absence of a
bypass. Severe property damage does not mean economic loss caused by delays in
production;
(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment
facilities, retention of untreated wastes, or maintenance during normal periods of equipment
downtime. This condition is not satisfied if adequate back-up equipment should have been
installed in the exercise of reasonable engineering judgment to prevent a bypass that
occurred during normal periods of equipment downtime or preventive maintenance; and
(3) The operator submitted notices as required under Part III U 2.
General Permit No.: VAR10
Page 20 of 23
b. The department may approve an anticipated bypass, after considering its adverse effects, if the
department determines that it will meet the three conditions listed in Part III U 3 a.
V. Upset.
1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is
unintentional and temporary noncompliance with technology -based state permit effluent limitations
because of factors beyond the reasonable control of the operator. An upset does not include
noncompliance to the extent caused by operational error, improperly designed treatment facilities,
inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -
based state permit effluent limitations if the requirements of Part III V 4 are met. A determination
made during administrative review of claims that noncompliance was caused by upset, and before an
action for noncompliance, is not a final administrative action subject to judicial review.
3. An upset does not include noncompliance to the extent caused by operational error, improperly
designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or
careless or improper operation.
4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through
properly signed, contemporaneous operating logs or other relevant evidence that:
a. An upset occurred and that the operator can identify the cause(s) of the upset;
b. The permitted facility was at the time being properly operated;
c. The operator submitted notice of the upset as required in Part III I; and
d. The operator complied with any remedial measures required under Part III S.
5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the
burden of proof.
W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP
authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon
presentation of credentials and other documents as may be required by law to:
1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or
where records must be kept under the conditions of this general permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of
this general permit;
3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and
control equipment), practices, or operations regulated or required under this general permit; and
4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as
otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any
substances or parameters at any location.
For purposes of this section, the time for inspection shall be deemed reasonable during regular business
hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection
unreasonable during an emergency.
General Permit No.: VAR10
Page 21 of 23
X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause.
The filing of a request by the operator for a state permit modification, revocation and reissuance, or
termination, or a notification of planned changes or anticipated noncompliance does not stay any state
permit condition.
Y. Transfer of state permits.
1. State permits are not transferable to any person except after notice to the department. Except as
provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the
state permit has been modified or revoked and reissued, or a minor modification made, to identify the
new operator and incorporate such other requirements as may be necessary under the Virginia
Stormwater Management Act and the Clean Water Act.
2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a
new operator if:
a. The current operator notifies the department at least 30 days in advance of the proposed transfer
of the title to the facility or property;
b. The notice includes a written agreement between the existing and new operators containing a
specific date for transfer of state permit responsibility, coverage, and liability between them; and
c. The department does not notify the existing operator and the proposed new operator of its intent
to modify or revoke and reissue the state permit. If this notice is not received, the transfer is
effective on the date specified in the agreement mentioned in Part III Y 2 b.
3. For ongoing construction activity involving a change of operator, the new operator shall accept and
maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over
operations at the site.
Z. Severability. The provisions of this general permit are severable, and if any provision of this general
permit or the application of any provision of this state permit to any circumstance, is held invalid, the
application of such provision to other circumstances and the remainder of this general permit shall not be
affected thereby.
General Permit No.: VAR10
Page 22 of 23
DEFINITIONS
"Business day" means Monday through Friday excluding state holidays.
"Commencement of land disturbance" means the initial disturbance of soils associated with clearing,
grading, or excavating activities or other construction activities (e.g., stockpiling of fill material).
"Construction site" means the land where any land -disturbing activity is physically located or conducted,
including any adjacent land used or preserved in connection with the land -disturbing activity.
"Final stabilization" means that one of the following situations has occurred:
1. All soil disturbing activities at the site have been completed and a permanent vegetative cover has
been established on denuded areas not otherwise permanently stabilized. Permanent vegetation
shall not be considered established until a ground cover is achieved that is uniform (e.g., evenly
distributed), mature enough to survive, and will inhibit erosion.
2. For individual lots in residential construction, final stabilization can occur by either:
a. The homebuilder completing final stabilization as specified in subdivision 1 of this definition; or
b. The homebuilder establishing temporary soil stabilization, including perimeter controls for an
individual lot prior to occupation of the home by the homeowner, and informing the homeowner of
the need for, and benefits of, final stabilization.
3. For construction projects on land used for agricultural purposes, final stabilization may be
accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed
that were not previously used for agricultural activities, such as buffer strips immediately adjacent to
surface waters, and areas that are not being returned to their preconstruction agricultural use must
meet the final stabilization criteria specified in subdivision 1 or 2 of this definition.
"Immediately" means as soon as practicable, but no later than the end of the next business day, following
the day when the land -disturbing activities have temporarily or permanently ceased. In the context of this
general permit, "immediately" is used to define the deadline for initiating stabilization measures.
"Impaired waters" means surface waters identified as impaired on the 2012 § 305(b)/303(d) Water Quality
Assessment Integrated Report.
"Infeasible" means not technologically possible or not economically practicable and achievable in light of
best industry practices.
"Initiation of stabilization activities" means:
1. Prepping the soil for vegetative or nonvegetative stabilization;
2. Applying mulch or other nonvegetative product to the exposed area;
3. Seeding or planting the exposed area;
4. Starting any of the above activities on a portion of the area to be stabilized, but not on the entire area;
or
5. Finalizing arrangements to have the stabilization product fully installed in compliance with the
applicable deadline for completing stabilization.
This list is not exhaustive.
General Permit No.: VAR10
Page 23 of 23
"Measurable storm event" means a rainfall event producing 0.25 inches of rain or greater over 24 hours.
"Stabilized" means land that has been treated to withstand normal exposure to natural forces without
incurring erosion damage.
Section 12. Inspection logs
INSPECTION FREQUENCY:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at
least once every five business days and no later than 48 hours following a measurable storm event. In
the event that a measurable storm event occurs when there are more than 48 hours between business
days, the inspection shall be conducted on the next business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired
or for which a TMDL wasteload allocation has been established and approved prior to the term of this
general permit.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount (Inches) Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(Y/N)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Qualified Personnel
Note: If msepction report does not identify any mci
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
nce
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Other obvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leaving the
site? (Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describe measures taken to
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount (Inches) Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(Y/N)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Qualified Personnel
Note: If msepction report does not identify any mci
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
nce
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Other obvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leaving the
site? (Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describe measures taken to
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount (Inches) Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(Y/N)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Qualified Personnel
Note: If msepction report does not identify any mci
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
nce
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Other obvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leaving the
site? (Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describe measures taken to
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?