VSMP Application Completeness Check
Project Title:483 fr o n 2oc Tiai -YES&
File Number:\ j
Date: 3-5- 19
Reviewer:
Your application has been checked for completeness per section 17-409 of the County Code. All
items must be received and correct for the application to be deemed complete.
❑ This application is complete and plan review has begun
❑ This application is not complete. Please provide the missing items
checked below.
Received
Correct
•
Y N
Y N N/A
❑ Completed application ❑ ❑ ❑
❑ ❑ Signatures of the Property Owners for each parcel affected ❑ ❑ ❑
P- ❑ Correct Fees Paid ❑ ❑ ❑
❑ ❑ Registration Statement on the official DEQ form, with correct LDA ❑ ❑ ❑
❑ ❑ ' Erosion and-Sediment Control Plan satisfying the requirements
of code section 17-402. ❑ ❑ ❑
❑ ❑ Stormwater Management Plan satisfying the requirements of code
section 17-403. ❑ ❑ 0
❑ ❑ Pollution Prevention Plan satisfying the requirements of code
section 17-404. The EPA template should be used. ❑ ❑ ❑
❑ ❑ Stormwater Pollution Prevention Plan satisfying the requirements
of code section 17-405. The EPA template should be used. ❑ ❑ ❑
❑ Mitigation Plan satisfying the requirements of code section
17-406 for any proposed disturbance of stream buffers. o ❑
❑ Requested Variations or Exceptions as provided in code sections
17-407 and 408, if applicable. (SSF,MMT,etc) o ❑
❑ ye Construction Record Drawings(as-builts) for any existing facilities
in the proposal satisfying the requirements of code section 17-422. o ❑ p
Comments:
■