Loading...
HomeMy WebLinkAboutWPO201900016 Checklist WPO VSMP 2019-03-05 ,lw. COUNTY OF ALBEMARLE .t`* ;, Department of Community Development 40] McIntire Road Charlottesville,Virginia 22902 VSMP Application Completeness Check Project Title:483 fr o n 2oc Tiai -YES& File Number:\ j Date: 3-5- 19 Reviewer: Your application has been checked for completeness per section 17-409 of the County Code. All items must be received and correct for the application to be deemed complete. ❑ This application is complete and plan review has begun ❑ This application is not complete. Please provide the missing items checked below. Received Correct • Y N Y N N/A ❑ Completed application ❑ ❑ ❑ ❑ ❑ Signatures of the Property Owners for each parcel affected ❑ ❑ ❑ P- ❑ Correct Fees Paid ❑ ❑ ❑ ❑ ❑ Registration Statement on the official DEQ form, with correct LDA ❑ ❑ ❑ ❑ ❑ ' Erosion and-Sediment Control Plan satisfying the requirements of code section 17-402. ❑ ❑ ❑ ❑ ❑ Stormwater Management Plan satisfying the requirements of code section 17-403. ❑ ❑ 0 ❑ ❑ Pollution Prevention Plan satisfying the requirements of code section 17-404. The EPA template should be used. ❑ ❑ ❑ ❑ ❑ Stormwater Pollution Prevention Plan satisfying the requirements of code section 17-405. The EPA template should be used. ❑ ❑ ❑ ❑ Mitigation Plan satisfying the requirements of code section 17-406 for any proposed disturbance of stream buffers. o ❑ ❑ Requested Variations or Exceptions as provided in code sections 17-407 and 408, if applicable. (SSF,MMT,etc) o ❑ ❑ ye Construction Record Drawings(as-builts) for any existing facilities in the proposal satisfying the requirements of code section 17-422. o ❑ p Comments: ■