Loading...
HomeMy WebLinkAboutSDP201600049 Review Comments Letter of Revision 2 2019-05-31COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 (434) 296-5832 May 31, 2019 Bill McClellan and Gina Schimming Pinnacle Construction & Development Corp 1821 Avon St, Ste 200 Charlottesville VA 22902 wam@pinnacleconstructionva.com gschimming(&pinnacleconstructionva.com RE: SDP201600049 The Vue — LOR #2 Dear Mr. McClellan and Ms. Schimming, Your LOR application has been reviewed. In order for the amended site plan to be approved the following revisions are required: [32.6.2(k), 4.17] It appears a few lighting fixtures are located on the photometric plan but not included in the analysis, as indicated by the lack of light contours and low footcandle values around these fixtures. Please review and revise to ensure the placement of the fixtures and the calculation grid is correct. 2. [32.6.2(k), 4.17] If approved, this sheet will effectively replace the Site Lighting Plan sheet in the approved 2016 site plan. As such, this or a second sheet will need to include cut sheets for all six (6) proposed fixtures (i.e. fixtures A-F of the luminaire schedule table) and identify which symbol (A-F) is used to represent each fixture on the plan. [32.6.2(k), 4.17] Albemarle County assesses photometric plans based on a maintenance factor, or "LLF", of 1.0. Please revise the luminaire schedule table on the photometric plan to reflect this requirement. (Note: Before the C/O is issued, site inspectors will use the lighting plan to evaluate whether the as -built lighting aligns with the site plan. It is therefore recommended to base the lighting plan on a "Day 1" scenario.) 4. [32.6.2(a), 32.5.2(a)] Provide the following general information on the plan: a. A North arrow b. A scale bar c. A revision date in the title block (for the resubmittal) 5. [Advisory Comment] Be advised that the revised lighting fixture locations will require a revised electrical plan to show locations and a submittal of the light fixtures will also be needed for building inspections. Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may be found on the County Attorney's website which may be found under "Departments and Services" at Albemarle.org. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about the comments please feel free to contact me. Sincerely, kda* Mariah Gleason Senior Planner Planning Division