Loading...
HomeMy WebLinkAboutWPO201900024 Bond Estimates 2019-06-02 (2)Project Name: Hillcrest Vineyard & Winery LLC - VSMP IWPO201900024 WPO file number: WP0201900024 TMP(s): 06900-00-00-02000, 06900-00-00-020B0 Date Estimate Completed: 06-02-19 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 700 ft $13.00 $9,100.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rep, cmp (15 to 48") in d lo11 ES-,2 1 EC-1 58.0 ft $40.00 $3,320.00 aggregate base or drainage stone in d ft L ft W 4.6 ton $35.00 $159.86 (Pipe is part of SW M bond, Str. for basin (Ex. Detention pond); VDOT end section above (ES-1), outfall protection (EC-1), above earthwork for trap/basin (Ex. detention pond) - Part of E&S bond for sediment trap height of dam at toe ft cut at high side 0 ft height of fill at facePoo ft cut at face 0 ft length of damft length of cut 0 ft top width ft width of cut .ft (area above transition) 0 Sf (area below transition; 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitior 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway woftft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height Min ft riser diameterin (riser unit price) $150.00 $525.00 barrel lengthft base plate or fdn $200.00 $200 barrel diameter (barrel unit price) $40.00 $6,800.00 barrel collars $200.00 $400 baffle length Elift $50.00 $0 trees 5 ea $275.00 $1,375.00 shrubs - 1 GAL. Creeping Juniper (C-1.02, 9th bullet) - 16,800 sf / plants 1' O.C. r 200 ea $25.00 $105,000.00 seedlings 5 ea $5.00 $25.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 1 ea $1,500.00 $1,500.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth 1.5 ft length -ft 6/2/2019 Project Name: Hillcrest Vineyard & Winery LLC - VSMP IWPO201900024 WPO file number: WP0201900024 TMP(s): 06900-00-00-02000, 06900-00-00-020B0 Date Estimate Completed: 06-02-19 Stormwater Management Bond Estimate Item Item Number width 4.5 (tons) survey and layout (price per 0.1 mi.) acres 2.09 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 4.05 1 WP0201900024 Hillcrest Vineyard -Winery SWM Bond Estimate 060219.xlsx Values reflect design takeoff values, except earthwork, which is included with ESC plan bond estimate. Ref. Applicant email: 5/14/2019 11:29 AM No. Unit Unit Cost Cost installed $60.00 $243.00 $1, 545.00 $2,500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 1 ea $3,000.00 $3,000.00 cost sum contingency Total $0.00 $139,692.86 $13,969.29 $153,670 6/2/2019