Loading...
HomeMy WebLinkAboutWPO201800073 Bond Estimates 2019-06-02Project Name: Lewis and Clark Drive Road Extension VSMP Plan WP0201800073 WPO file number: WP0201800073 TMP (s): 03200-00-00-006RO Date Estimate Completed: 06-02-19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) 14.7 acres $5,000.00 $73,250.00 2 silt fence (SF) 1732.0 ft $5.00 $8,660.00 3 safety fence (SAF) 0.0 ft $5.00 $0.00 4 diversion (DID, FD, RWD) 2494 ft $13.00 $32,422.00 5 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 6 Sediment Trap #1, C3.3 7 earthwork for trap/basin 8 height of dam at toe 4 ft cut at high side 9.5 ft 9 10 height of fill at face length of dam 2 ft 50 ft cut at face 15 ft length of cut ft 11 top width 6 ft width of cutKMM�ft 12 (area above transition urea oeiow transitic 51 sf 13 (total width of dam) 8 ft (total width of cut) 53 ft 14 (height below transitio 2 ft (depth below transit 8 ft 15 (area below transition 4 sf (area above transitil 148 sf 16 (total fill volume) 44.4 cy (total fill volume) 368.5 cy 17 length of spillway ft (TOAL CY estimate 383 cy $13.00 $4,979.00 18 width of spillway 22 ft (spillway stone tons 22.8 tons $50.00 $1,140.00 19 Sediment Trap #2, C3.4 20 earthwork for trap/basin 21 height of dam at toe 0 ft cut at high side MMFMMMMffft 22 23 height of fill at face length of dam 0 ft ft cut at face 5 ft length of cut 120 ft 24 top width061�ft width of cut ft 25 (a. - .,.rove transition 0 sf -. -- --.iw transiti( 155 sf 26 (total width of dam) 0 ft (total width of cut) 57 ft 27 (height below transitio 0 ft (depth below transit 8 ft 28 (area below transition: 0 sf (area above transitil 164 sf 29 (total fill volume) 0.0 cy (total fill volume) 1417.8 cy 30 length of spillway ft (TOAL CY estimate 1418 cy $13.00 $18,434.00 31 width of spillway ft (spillway stone tons 18.6 tons $50.00 $930.00 32 Sediment Trap #3, C3.4 33 earthwork for trap/basin 34 height of dam at toe 4 ft cut at high side 12 ft 35 height of fill at face 1 ft cut at face 5 ft 36 length of dam 50 ft length of cut 50 ft 6/2/2019 Project Name: Lewis and Clark Drive Road Extension VSMP Plan WP0201800073 WPO file number: WP0201800073 TMP (s): 03200-00-00-006RO Date Estimate Completed: 06-02-19 Erosion and Sediment Control Bond Estimate Item Item Number 37 top width �4 ft 38 (area above transition 6 sf 39 (total width of dam) 8 ft 40 (height below transitio 3 ft 41 (area below transition 3 sf 42 (total fill volume) 16.7 cy 43 length of spillway ft 44 width of spillway 10 ft 45 silt fence inlet protection (IP) 46 stone inlet protection (IP) 47 outlet protection (OP)-Trap#1 length 0 ft 48 outlet protection (OP)-Trap#2 length 0 ft 49 outlet protection (OP)-Trap#3 length 0 ft 50 channel (SCC, matted) - Ref. 3.5, 3•6 length 1090 ft Ref. SU1320i80017i, Road Plan, sheet C7.0, for ditch section 51 BM stabilization, sloPes > 31 (Ref. sheets 3.5, 3.6) 62388 ft Area = 62,388 sf (sheets 3,5�3.6) 52 check dam depth in channel 2 ft 53 construction entrance (CE) 54 wash rack 55 paved construction entrance 56 rip -rap, placed -Culvert 1, inlet) depth 2 ft 57 ( sheet C3L.A) width 14.0 58 rip -rap, placed -Culvert 2, inlet depth 2 ft 59 ( sheet C1.4) width 8.0 60 rip -rap, placed -Culvert 3, inlet depth ft 61 ( sheets C3.3) width 62 rip -rap, placed -Culvert 1, outlet) depth ft 63 (sheet C3.4) width 3 64 rip -rap, placed -Culvert 2, outlet depth 3 ft 65 (sheet C3..4) width 20.0 66 rip -rap, placed -Culvert 3, outlet depth 2 ft &.0 67 ( sheets C3-3) -Approx =inlet width 68 Also, see Culv. 3 outfall riprap email sent Timmons, 6/2/20i9 4:30 PM 69 survey and layout (price per 0.1 mi.) acres 70 mobilization width of cut -ft (area below transiti( 200 sf (total width of cut) 64 ft (depth below transit 7 ft (area above transitil 175 sf (total fill volume) 694.4 cy (TOAL CY estimate 700 cy (spillway stone tons 6.9 tons width width width width width channel width length (tons) length (tons) length (tons) length (tons) length length (tons) traps and basins 'ft ft ft 8.0 ft ft ft -ft 32.2 tons -ft 20.24 tons -ft 17.25 tons -ft 181.125 tons -ft 86.25 tons �ft 17.25 tons No. Unit Unit Cost Cost installed $13.00 $9,100.00 $50.00 $345.00 $3,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.30 $11,336.00 $2.30 $81,104.40 $360.00 $1,440.00 $2,500.00 $0.00 $2,000.00 $4,000.00 $3,500.00 $7,000.00 $60.00 $1,932.00 $60.00 $1,214.40 $60.00 $1,035.00 $60.00 $10,867.50 $60.00 $5,175.00 $60.00 $1,035.00 $8,825.00 $2,500.00 6/2/2019 Project Name: Lewis and Clark Drive Road Extension VSMP Plan WP0201800073 WPO file number: WP0201800073 TMP (s): 03200-00-00-006RO Date Estimate Completed: 06-02-19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 71 Temporary Access road 72 Temporary Culvert $0.00 WP0201800073 Lewis and Clark Drive Road Extension ESC Bond Estimate 060219 cost sum $289,724.30 contingency $28,972.43 Total $318,700 6/2/2019