Loading...
HomeMy WebLinkAboutWPO201800073 Bond Estimates 2019-06-02 (2)Project Name: Lewis and Clark Drive Road Extension VSMP Plan WPO201800073 WPO file number: WPO201800073 TMP(s) 03200-00-00-006RO Date Estimate Completed: 06-02-19 Mitigation Plan Bond Estimate Item Item Number 1 2 No. Unit Unit Cost Cost installed litigation eedlings; container -grown ( 700 per acre, 1.6 Ac.) 1120 ea $9.00 $10,080.00 as -built drawings (per facility) WP020i800073 Lewis and Clark Drive Ext_Mitigation_bond_est_o9-27-i7_o6o2i9 1 ea $2,000.00 cost sum contingency Total $2,000.00 $12,080.00 $1, 208.00 $13,288 6/2/2019