HomeMy WebLinkAboutWPO201800073 Bond Estimates 2019-06-02 (2)Project Name: Lewis and Clark Drive Road Extension VSMP Plan WPO201800073
WPO file number: WPO201800073
TMP(s) 03200-00-00-006RO
Date Estimate Completed: 06-02-19
Mitigation Plan Bond Estimate
Item Item
Number
1
2
No. Unit Unit Cost Cost
installed
litigation
eedlings; container -grown ( 700 per acre, 1.6 Ac.) 1120 ea $9.00 $10,080.00
as -built drawings (per facility)
WP020i800073 Lewis and Clark Drive Ext_Mitigation_bond_est_o9-27-i7_o6o2i9
1 ea $2,000.00
cost sum
contingency
Total
$2,000.00
$12,080.00
$1, 208.00
$13,288
6/2/2019