HomeMy WebLinkAboutWPO201900018 Bond Estimates 2019-06-05Project Name: Peabody School - VSMP/WPO Plan WP0201900018 WPO file number: WP0201900018 TM P(s): 0761V11-00-00-01500 Date Estimate Completed: 05-30-19; checked o6-05-19 by CDD/Engineering Erosion and Sediment Control Bond Estimate Item Item Number 1 stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length 0 ft 6 Sediment Basin - N/A 7 earthwork for Sediment Basin #1 8 structures for Sediment Basin#1 9 Sediment Trap #1 io earthwork for trap/basin 11 height of dam at toe 3 ft lz height of fill at face 1 ft 13 length of dam 25 ft 14 top width IL 2 ft 15 (area above transition 4 sf 16 (total width of dam) 6 ft 17 (height below transitio 2 ft 18 (area below transition; 2 sf 19 (total fill volume) 5.6 cy zo length of spillway ft zl width of spillway � ft 22 structures for basin 23 riser height 0 ft 24 riser diameter J in 25 barrel length ft 26 barrel diameter 0 in 27 28 29 30 silt fence inlet protection (IP) 31 stone inlet protection (IP) 32 outlet protection (OP)-Trap#1 length ft 33 outlet protection (OP)-Basin#1 length Ift pipe diameter 0 in cut at high side 3 ft cut at face 1 ft length of cut ft width of cut ft (area below transitic 12 sf (total width of cut) 18 ft (depth below transit 2 ft (area above transitii 14 sf (total fill volume) 38.5 cy (TOAL CY estimate 40 cy (spillway stone tons 3.5 tons (riser unit price) $0.00 base plate or fdn - (barrel unit price) $0.00 barrel collars baffle length Mft width Mftftwidth No. Unit Unit Cost installed 0.91acres $5,000.00 575.0 ft $5.00 60.0 ft $5.00 Aft $13.00 $0.00 $13.00 $50.00 $200.00 $200.00 $50.00 $100.00 $200.00 $0.00 $0.00 Cost $4,700.00 $2,875.00 $300.00 $0.00 $0.00 $520.00 $175.00 $0.00 $0 $0.00 $0 $0 $1,400.00 $200.00 $0.00 $0.00 6/5/2019 Project Name: Peabody School - VSMP/WPO Plan WP0201900018 WPO file number: WP0201900018 TM P(s): 0761V11-00-00-01500 Date Estimate Completed: 05-30-19; checked o6-05-19 by CDD/Engineering Erosion and Sediment Control Bond Estimate Item Item Number 34 35 36 37 38 39 40 41 42 43 44 45 outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed length length depth in channel depth width survey and layout (price per 0.1 mi.) acres mobilization Temporary Access road 10 ft width 0 ft width 0 ft channel width 0 ft length 0.0 0.94 traps and basins WP02o1900018 Peabody School -Collins Engr 053019_ESC_bond_est_o9-27-17_o6o5igja No. Unit Unit Cost Cost installed 6 ft 2 $270.00 $540.00 0 ft $0.00 0 ft $0.00 $0.00 $2,500.00 $0.00 $2,000.00 $2,000.00 mi $3,500.00 $3,500.00 0.0 ft $60.00 $0.00 1 $970.00 $2,500.00 cost sum $19,680.00 contingency $1,968.00 Total $21,650 6/5/2019