HomeMy WebLinkAboutWPO201900018 Bond Estimates 2019-06-05Project Name: Peabody School - VSMP/WPO Plan WP0201900018
WPO file number: WP0201900018
TM P(s): 0761V11-00-00-01500
Date Estimate Completed: 05-30-19; checked o6-05-19 by CDD/Engineering
Erosion and Sediment Control Bond Estimate
Item Item
Number
1
stablization (PS, TS)
2
silt fence (SF)
3
safety fence (SAF)
4
diversion (DID, FD, RWD)
5
temporary slope drain (TSD)
pipe length
0 ft
6
Sediment Basin - N/A
7
earthwork for Sediment Basin #1
8
structures for Sediment Basin#1
9
Sediment Trap #1
io
earthwork for trap/basin
11
height of dam at toe
3 ft
lz
height of fill at face
1 ft
13
length of dam
25 ft
14
top width IL
2 ft
15
(area above transition
4 sf
16
(total width of dam)
6 ft
17
(height below transitio
2 ft
18
(area below transition;
2 sf
19
(total fill volume)
5.6 cy
zo
length of spillway ft
zl
width of spillway �
ft
22
structures for basin
23
riser height
0 ft
24
riser diameter
J in
25
barrel length
ft
26
barrel diameter
0 in
27
28
29
30
silt fence inlet protection (IP)
31
stone inlet protection (IP)
32
outlet protection (OP)-Trap#1
length
ft
33
outlet protection (OP)-Basin#1
length
Ift
pipe diameter 0 in
cut at high side
3 ft
cut at face
1 ft
length of cut ft
width of cut
ft
(area below transitic
12 sf
(total width of cut)
18 ft
(depth below transit
2 ft
(area above transitii
14 sf
(total fill volume)
38.5 cy
(TOAL CY estimate
40 cy
(spillway stone tons
3.5 tons
(riser unit price) $0.00
base plate or fdn -
(barrel unit price) $0.00
barrel collars
baffle length Mft
width Mftftwidth
No. Unit
Unit Cost
installed
0.91acres
$5,000.00
575.0 ft
$5.00
60.0 ft
$5.00
Aft
$13.00
$0.00
$13.00
$50.00
$200.00
$200.00
$50.00
$100.00
$200.00
$0.00
$0.00
Cost
$4,700.00
$2,875.00
$300.00
$0.00
$0.00
$520.00
$175.00
$0.00
$0
$0.00
$0
$0
$1,400.00
$200.00
$0.00
$0.00
6/5/2019
Project Name: Peabody School - VSMP/WPO Plan WP0201900018
WPO file number: WP0201900018
TM P(s): 0761V11-00-00-01500
Date Estimate Completed: 05-30-19; checked o6-05-19 by CDD/Engineering
Erosion and Sediment Control Bond Estimate
Item Item
Number
34
35
36
37
38
39
40
41
42
43
44
45
outlet protection (OP)
channel (SCC, matted)
check dam
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
length
length
depth in channel
depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
Temporary Access road
10 ft width
0 ft width
0 ft channel width
0 ft length
0.0
0.94 traps and basins
WP02o1900018 Peabody School -Collins Engr 053019_ESC_bond_est_o9-27-17_o6o5igja
No. Unit Unit Cost
Cost
installed
6 ft
2 $270.00
$540.00
0 ft
$0.00
0 ft
$0.00
$0.00
$2,500.00
$0.00
$2,000.00
$2,000.00
mi
$3,500.00
$3,500.00
0.0 ft
$60.00
$0.00
1
$970.00
$2,500.00
cost sum
$19,680.00
contingency
$1,968.00
Total
$21,650
6/5/2019