Loading...
HomeMy WebLinkAboutWPO201900018 Bond Estimates 2019-06-06 (2)Project Name: Peabody School - VSMP/WPO Plan WP0201900018 WPO file number: WP0201900018 TM P (s) : 0761VI1-00-00-01500 Date Estimate Completed: 0 06-06-19;checked 06-05-19byCDD/Engineering Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch ft $13.00 $0.00 2 standard manhole frame top (not inlet) ea $500.00 $1,000.00 3 drop inlet or grate ea I,,,, $3,500.00 $0.00 4 manhole structure (per ft. rise) ft $450.00 $7,200.00 5 pipe,rap, (15toaina in d EC-1 ft $35.00 $8,0$0.00 6 base aggregate base or drainage stone �0.0 �ES-1,2 0.0 in d ft L w ft W 0.0 ton $35.00 $0.00 7 8 earthwork for UG detention system 9 height of dam at toe 0 ft cut at high side ft 10 height of fill at face 0 ft cut at face ft 11 length of dam 0 ft length of cut ft 12 top width ft width of cut ft 13 (area above transition: 0 sf (area below transition 0 sf 14 (total width of dam) 0 ft (total width of cut) 0 ft 15 (height below transitioi 0 ft (depth below transitio 0 ft 16 (area below transition) 0 sf (area above transitior 0 sf 17 (total fill volume) 0.0 cy (total fill volume) 0.0 cy 18 length of spillway =ft (TOAL Cy estimate) 0 cy $13.00 $3,792.10 19 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 20 structures for basin 21 riser height ft 22 in riser diameterMin (riser unit price) $0.00 $0.00 23 barrel lengthft base plate orfdn $200.00 $0 24 barrel diameter (barrel unit price) $0.00 $0.00 25 barrel collars $200.00 $0 26 baffle length Wft $50.00 $0 27 28 trees ea $275.00 $0.00 29 shrubs ea $50.00 $0.00 30 seedlings as $5.00 $0.00 31 underdrain (LF) ft $5.00 $0.00 32 biofilter soil mix (CY) cy $45.00 $0.00 33 trash rack/ anti vortex devices ft $1,500.00 $0.00 34 maintenance access road (LF) ft $50.00 $0.00 35 rip -rap, placed depth length 0.0 ft 36 width ■ft (tons) 0 $60.00 $0.00 37 survey and layout (price per 0.1 mi.) acres basins 0 $0.00 38 mobilization $2,500.00 39 as -built drawings (per facility) $2,000.00 $2,000.00 40 materials testing (per facility) Mae as $2,000.00 $2,000.00 41 compaction testing (per dam) ea $3,000.00 $0.00 42 43 bonded value of 0.75 Ac. Forest /Open Space Easement (=0.26 lb.) at $15,000 lb. total P nutrient credits 0.26 lb $15,000.00 $3,900.00 ref. Collins Engineering proj. Calc. packet, April 22, 2019, pp. 3, 6 - VaRRM re -development .xis, V soils 6/6/2019 Project Name: Peabody School - VSMP/WPO Plan WP0201900018 WPO file number: WP0201900018 TM P(s): 076 M 1-00-00-01500 Date Estimate Completed: 06-06-19;checked 06-05-19byCDD/Enginearing Stormwater Management Bond Estimate Item Item Number WP0201900018 Peabody School -CE 053019_SWM_bond_est_060619-jarev-Forest_Open Space-point26_lb_ nutrient No. Unit Unit Cost Cost (installed) cost sum $30,442.10 contingency $3,044.21 Total $33,490 6/6/2019