Loading...
HomeMy WebLinkAboutWPO201900018 Bond Estimates 2019-06-06Project Name: Peabody School - VSMP/WPO Plan WP0201900018 WPO file number: WP0201900018 TM P(s): 0761V11-00-00-01500 Date Estimate Completed: 15-30 06-06-19; checked o6-05-19 by CDD/Engineering Stormwater Management Bond Estimate Item Item Number 1 permanent diversion or ditch 2 standard manhole frame top (not inlet) 3 drop inlet or grate 4 manhole structure (per ft. rise) 5 pipe, rcp, cmp (15 to 48") 36.0 in d 0 ES-1,2 6 aggregate base or drainage stone 0.0 in d 0.0 ft L 7 8 earthwork for UG detention system No. Unit Unit Cost Cost installed Oft $13.00 $0.00 2 ea $500.00 $1,000.00 0 ea $3,500.00 $0.00 16 ft $450.00 $7,200.00 EC-1 115.0 ft $70.00 $8,050.00 p0 ftwk- 0.0 ton $35.00 $0.00 9 height of dam at toe 0 ft cut at high side ft 10 height of fill at face 0 ft cut at face ft u length of dam ft length of cutoft ft 12 top widthwidth Mft of cut 13 (area above transition) 0 sf (area below transition; 0 sf 14 (total width of dam) 0 ft (total width of cut) 0 ft 15 (height below transitior 0 ft (depth below transitior 0 ft 16 (area below transition) 0 sf (area above transition 0 sf 17 (tr' ' '" ' 0.0 cy (total fill volume) 0.0 cy 18 length of spillway �ft (TOAL CY estimate) 0 cy 19 width of spillway ft (spillway stone tons) 0 tons 20 structures for basin 21 riser height ft 22 riser diameter 0 in (riser unit price) $0.00 23 barrel length 0 ft base plate or fdn ' 24 barrel diameter 0 in $0.00 25 barrel collars 26 baffle length ft 27 28 trees 29 shrubs 30 seedlings 31 underdrain (LF) 32 biofilter soil mix (CY) 33 trash rack/ anti vortex devices 34 maintenance access road (LF) $13.00 $3,792.10 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 ea $275.00 $0.00 0 ea $50.00 $0.00 0 ea $5.00 $0.00 0 ft $5.00 $0.00 0 cy $45.00 $0.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 6/6/2019 Project Name: Peabody School - VSMP/WPO Plan WP0201900018 WPO file number: WP0201900018 TM P(s): 076M 1-00-00-01500 Date Estimate Completed: 15-30 06-06-19; checked o6-05-19 by CDD/Engineering Stormwater Management Bond Estimate Item Item Number 35 rip -rap, placed depth 0 ft length 36 width 0.0 (tons) 37 survey and layout (price per 0.1 mi.) acres 0 basins 38 mobilization 39 as -built drawings (per facility) 40 materials testing (per facility) 41 compaction testing (per dam) 42 43 bonded value of 0.75 Ac. Forest /Open Space Easement (=0.26 lb.) at $15,000 lb. total P nutrient credits ref. Collins Engineering proj. Calc. packet, April 22, 2019, pp. 3, 6 - VaRRM re -development .xls, 'U soils 0.0 ft 0 0 WP0201900018 Peabody School -CE 053019_SWM_bond_est_060619-jarev-Forest_Open Space-point26_lb_nutrient No. Unit Unit Cost Cost installed $60.00 $0.00 $0.00 $2,500.00 ea $2,000.00 $2,000.00 ea $2,000.00 $2,000.00 ea $3,000.00 $0.00 0.26lb $15,000.00 $3,900.00 cost sum $30,442.10 contingency $3,044.21 Total $33,490 6/6/2019