HomeMy WebLinkAboutWPO201900018 Approval - County 2019-06-06COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project:
Plan preparer:
Owner or rep.:
Plan received date:
(Rev. 1)
(Rev. 2)
(Rev. 3)
Date of comments:
(Rev. 1)
(Rev. 2)
(Rev. 3)
Reviewer:
WP0201900018
VSMP Permit Plan review
Peabody School — VSMP/WP020190008
Scott Collins, Collins Engineering; 200 Garrett Street, Suite K
Charlottesville ,VA 22902 [scott(a)collins-engineering com ]
The Peabody School, 1232 Stoney Ridge Road, Charlottesville, VA 22902-8703
[rob-orlando@Xeabodyschool.org ]
7 Mar 2019
30 Apr 2019
30 May 2019
6 Jun 2019 (Dropbox /.PDFs)
5 Apr 2019
24 May 2019
5 June 2019
6 Jun 2019 * Approved with conditions
(* Attached EMAIL 6/6/2019 4:39 PM — Conditions /Acceptance )
John Anderson
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any
VSMP permit by issuing a project approval or denial. This project is conditionally approved. See:
• SWPPPfollow-up item Sec. A., below —provide as soon as possible.
• Albemarle County email, June 6, 2019 4:33 PM, items L-3. /Attached.
A. Stormwater Pollution Prevention Plan (SWPPP) (Rev. 1) Not addressed. SWPPP review comments
persist, since revised SWPPP apparently not submitted. Please provide SWPPP. A .PDF is fine. (Rev. 3)
As follow-up to rev. (2019) Registration Statement (Sec. 1): Provide signed Registration.
Operator: Chris Lowder, Kjellstrom+Lee Construction /.PDF acceptable.
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain
(1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. (Rev. 3) Prior review
comments addressed. Note: Please seefollow-up item, above.
a. Please include reference to WP02019-00018 on SWPPP title page. (Rev. 2) Comment persists,
Correction required. WP02019-00018.
b. Sec. 4/5: Include with final submittal, I I" x 17" ESC and SWM plan sheet inserts. (Rev. 2)
Pending /comment persists.
c. Sec. 6 /Exhibit: (Rev. 2) Comment persists. Please select an appropriate plan sheet that displays
items that are typical focus of state /county SWPPP inspections. Exhibit similar to many prepared
by CE in the past is fine. Recommend copy sheet 4 of plan, re -title PPP Exhibit, and insert PPP
Exhibit at Sec. 6.
i. Provide /show a trapping measure for treatment of vehicle wash waters.
ii. Provide /show lined concrete washout adjacent to PCE.
Engineering Review Comments
Page 2 of 5
iii. Show location of. solid waste dumpster, rain gauge, portable sanitary facilities, on -site
fuel storage (if any), paint/solvent storage (if any).
d. Sec. 6E: List person/s responsible for pollution prevention practices; name individual/s. (Rev. 2)
Addressed.
e. Sec. 8: Identify, by name, qualified personnel responsible for SWPPP inspections. (Rev. 2)
Addressed.
f. Sec. 12: Provide inspection logs. (Rev. 2) Addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. See A, above. (Rev. 3) Addressed.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is
approved pending review of stormwater management calc. packet, and slight revisions —items 8.e., 10, 11 below.
Also, new review comments (Rev. 2) This plan is approved pending review of stormwater management calc.
packet, and slight plan revisions —items 8.e., 12 (Rev. 3) This plan is conditionally Approved —see Attached email.
1. Eliminate reference to site plan in plan title, and sheet 3 title. This is not a site plan application. Include
reference to VSMP/WPO201900018 in plan title. Recommend revise title of sheet 3 to read `Site Layout.'
(Rev. 1) Addressed.
2. Every plan sheet is titled Minor Site Plan Amendment; this is inaccurate. Please revise sheet titles. (Rev. 1)
Addressed.
3. Title sheet: provide vicinity map scale. (Rev. 1) Addressed.
4. Note: VSMP /WPO plan approval may require a deed of dedication of easement for SWM facilities. Please
furnish deed bk.-pg. of recorded deed of easement for the existing bioretention basin. (Rev. 1) Addressed.
Easement for Ex. bioretention basin is shown on easement plat under review (SUB201900081). Asfollow-
up: Engineering plat review comments will request easement be shown over existing permeable pavers.
(Rev. 2) Comment persists. Multiple emails on this date discuss topic of SWM facility /access easement
plat in context of VSMP /WPO plan approval, without, to date, resolution. (Ref. 3) Addressed —see
Attached.
5. VSMP /WPO plan approval requires Forest /Open Space Easement plat application, which is a separate
application; please submit at earliest convenience. (Rev. 1) Addressed. Easement plat under review
(SUB201900081).
6. Incorporate SDP201900007 Engineering review comments d. 3/13/19 into revised WPO plan (comments 2,
3, 7, 8, 9, 11). (Rev. 1) Addressed. Easement plat under review (SUB201900081). Also, see S. Collins
email, 5/16/2019 4:09 PM, with Attachments showing revised SWM facility access crossing 7" concrete
sidewalk (section z dumpster pad concrete pad).
7. Insets, sheet 6, require attention. Inset left: SWM Approved with SDP2013-00006 includes this label:
`Rerouted storm sewer configuration maintaining existing outfall to Southern Parkway.' Leader line does
not point to a discernible feature. Likewise, `proposed bioretention basin' label /leader line do not point to
a proposed biofilter. Please revise /delete. Inset right: Delete 5 leader lines without labels; label reading
`Existing riprap ditch' (no discernible ditch); and select a more definite line -type or hatching to clearly
show proposed 0.50 Ac. Forest /Open space. Proposed area is ambiguous. (Rev. 1) Addressed.
8. Technical Criteria — Water Quality /Quantity (Also: WPO201300033) (Rev. 1) Addressed, additional
details, below.
a. VAR 100512, a VPDES permit issued to Peabody School, was terminated on 7/17/18.
b. The current application is a new application, subject to Part IIB technical criteria, and does not
amend a still -active VAR10 VSMP permit. (Rev. 1) Withdrawn. Note building inspections
occurring prior to 7/1/14 (i.e., land disturbance prior to July 1, 2014 source: Albemarle County
building inspections): (Image removed with Rev. 3)
Engineering Review Comments
Page 3 of 5
9VAC25-870-47; excerpt: (htWs://Iis.vir�inia.izov/cizi-bin/legp6O4.exe?000+reg+9VAC25-870-47)
Excerpt removed with Rev. 3
c. Review and revise SWM Narrative and design, as needed to meet stormwater quality requirements
listed at 9VAC25-870-65, and stormwater quantity standards listed at 9VAC25-870-66. (Rev. 1)
Addressed. Also, see SDP2005-00069 (FSP).
d. Since existing on -site bioretention basin is relied upon for the current application, plan must reflect
As -built conditions consistent with VA DEQ Stormwater Design Specification No. 9, Level 1 or
Level 2. Specify which bioretention design level this plan intends to meet. An existing BMP built
to plan design (approved 7/12/13) that pre -dates the VSMP program effective date of 7/1/14 must
meet applicable quality and quantity design requirements. Grandfathering (9VAC25-870-48) or
Applicability of Part IIC (9VAC25-870-47) does not apply. This is not an Amendment application
to an approved VSMP plan. VAR10C512 was terminated, July 2018. This is a new application
subject to Part 1113 technical criteria. (Rev. 1) Withdrawn /NA since project subject to Part IIC.
WP0201300033, sheet 5 /bioretention basin design (Image removed with Rev. 3):
e. First sentence of WP001900018 SWM narrative: "Stormwater quantity for this site is handled and
treated by the regional stormwater management basin below this site and the other commercial and
industrial parcels in this development area." Provide supportive information on the `regional
basin,' including (but not limited to): (Rev. 1) Wit Storm runoff routes to an onsite
bioretention basin, which then discharges to an intermittent stream, which eventually reaches a
regional stormwater management basin below the site (though not immediately below). As ollow-
yp: Engineering requests plan include reduced scale (1" =200') inset showing location of regional
SWM basin relative to site to help eliminate confusion for those less familiar with SWM network
in this development area. (Rev. 2) Comment persists. Also, see email sent 6/5/2019 7:41 AM.
(Rev. 3) Addressed. See plan sheet 5A and Reference Dwg.
i. County SDP or WPO file # where regional SWM basin is approved. Please ref. county
SWM Facility ID 0192.01 or 0060.01, which appear to be the only likely options in GIS
inventory of SWM facilities below the site. (Apart from these, an unnamed tributary to
Moore's Creek flows north, beneath interstate (I-64) without, apparently, encountering
another SWM detention facility. (Rev. 1) Withdrawn. See SDP2005-00069 for prior
(approved) plan reference to `stormwater detention pond designed and approved with the
Mill Creek Industrial Park.' (Rev. 1 image removed with Rev. 3)
ii. County GIS lists the following SWM facility information (0192.01, 0060.01): (Rev. 1)
NA -Review error. Images deleted.
iii. Provide copy of legal instrument whereby Peabody School has right to release site runoff
to Foxcroft detention basin (provide deed bk-pg. ref), to Mill Creek P U D HOA
retention basin, or any other stormwater management facility relied upon. (Rev. 1)
Withdrawn. Site currently discharges to regional detention pond under approved
WP0201300033, and will continue to discharge to this facility. No additional legal
instrument is required.
iv. Provide as -built design information and routings for the dry detention basin /retention
basin (wet), if relied upon, to show compliance with 9VAC25-870-66. (Rev. 1)
Withdrawn /NA since project subject to Part IIC.
v. If the Foxcroft /Mill Creek facilities are eligible for use by Peabody School, 9VAC25-
870-66 applies, a SWM Facility /BMP Maintenance Agreement listing Peabody School,
and bk.-pg. ref. to Deed of Dedication for either Foxcroft or Mill Creek basin are
required. (Rev. 1) NA -Review error.
vi. Show Foxcroft dry detention basin or Mill Creek wet retention basin on plans with bk.-pg.
reference to deed of dedication of easement for whichever facility may be relied upon.
(Rev. 1) Not addressed. Please see item e. follow-up, above. (Rev. 3) Addressed.
vii. WP0201900018 SWM Narrative: (Rev. 1) Image deleted; not needed.
Engineering Review Comments
Page 4of5
viii. WPO201300033 SWM Narrative: (Rev. 1) Image deleted; not needed.
WPO201300033 SWM design may already credit removal of existing classroom building, but values
presented as well as SWM narrative, leave uncertainty. If credit was taken for removal of the existing
classroom (loss of impervious area) with WP0201300033, then WP0201900018 cannot take this credit.
Please revise and clarify impervious values that appear on sheet 1 and 6. Compare with WPO201300033
(sheets 1, 5, SWM Narrative). Ensure values bridge to WPO201300033, accurately, that values reported on
sheet 1 and 6 are consistent. If credit for removal of the existing classroom building was not taken with
WPO201300033, provide table description of buildings with areas (name buildings/list sq.ft.), proposed and
existing, that match WPO201300033 sheet 1 values. Revised WPO201900018 review will consider: (Rev.
1) Addressed. Ref. Sheet 1 Existing and Proposed Impervious Area tables.
WPO201300033, sheet 1 (values): (Rev. 1) Image deleted; not needed.
WPO201900018, sheet 1: (Rev. 1) Image deleted; not needed.
WPO201300033, sheet 5: (Rev. 1) Image deleted; not needed.
WPO201900018, sheet 6: (Rev. 1) Image deleted; not needed.
10. New: Third and fifth paragraphs of SWM Narrative, sheet 5, reference attached stormwater management
calculations. Calculations packet was not included with submittal, unless overlooked. Please submit print
copy or .PDF. Additional review comments possible. (Rev. 2) Review of calc. packet pending —scheduled
complete on 6 Jun 2019. (Rev. 3) Addressed. 10-yr event elevation contained within detention system.
It. New: Revise sheet 1 table notation to read: `Total increase of impervious area: 0.09 Acres or 4,388 SF.'
(Rev. 2) Addressed.
12. New: Ref email request for: (Rev. 3) Addressed.
a. Correction of plan set title to include reference to WPO201900018 (email sent 6/5/2019 7:41 AM)
b. UG detention system profile /plan view of structure (w/ weir plate) (email sent 6/5/2019 3:33 PM)
D. Erosion and Sediment Control Plan (ESOP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan
is approved.
13. Sheet 5: Include paved wash rack detail. (Rev. 1) Addressed.
14. Sheet 7: Include VESCH SAF detail. (Rev. 1) Addressed.
Sheet 8:
15. Provide trapping measure for sediment -laden or otherwise contaminated storm runoff from paved
construction entrance, concrete wash -out, dumpster, porta John, etc. (Rev. 1) Addressed.
16. Show concrete wash -out. (Rev. 1) Addressed.
17. Ensure waste management vehicles can access dumpster, once construction fencing is set up. (Rev. 1) Not
addressed. (Rev. 2) Addressed.
18. New: Restore Utility, Grading and Drainage Plan to VSMP /WPO plan set. Details at 1" =20' scale are
more readable, and not all labels repeat on sheet 5. WPO plans should include grading and drainage plans.
(Rev. 2) Addressed. (Reminder: Engineering to check final print submittal).
19. New: Relocate proposed rubber -lined concrete wash -out area text which obscures existing curbed entrance.
(Rev. 2) Addressed.
All comments have been addressed. Please see Review Comment Sec. A: Provide signed Registration Statement
as soon as possible.
Engineering Review Comments
Page 5 of 5
Process
After approval, VSMP plan will need to be bonded (Rev. 3: in process, 6/6/19). The bonding process is begun by
submitting a bond estimate request form and fee to the Department of Community Development. One of the plan
reviewers will prepare estimates and check parcel and easement information based on the approved plans. The
County's Management Analyst ..,:'� has prepared bond agreement forms, which will need to be completed
by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will
need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain
all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements may also nee *�
be comp't and recorded. (Rev. 2) See Ex. SWM Facility Maintenance Agreement at bk.-pg. 4399-529. The
County's Management Analyst or other staff will prepare the forms and check for ownership and signature
information. The completed forms will need to be submitted along with court recording fees.
An easement plat associated with this VSMP plan is under review (SUB201900081) and must be recorded prior
to Engineering recommendation to approve Peabody School Minor Site Plan Amendment —see Attached email.
After bonding is complete and required easemet#s are er-de (Forest /(lpe Spaoe for example), the County
can hold a pre -construction conference. Applicant will need to complete the request for apre-construction
conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible
land disturbed, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -
construction conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a grading permit will be issued by the County so that work maybegin.
County forms can be found on the county website forms center under engineering;
bltp://www.albemarle.ora/deptforms.asp?dei2artment=cdengyMo
Ifyou have questions /concerns, please contact me at janderson2galbemarle.org, or at 434.296-5832-x3069.
Thank you
J. Anderson, Engineering Division
WP0201900018 Peabody School 060619rev3 -Conditional Approval