HomeMy WebLinkAboutWPO201600071 Calculations WPO VSMP 2019-05-08 BELVEDERE PHASE IIB STORMWATER
MANAGEMENT CALCULATIONS PACKET
Date of Approved Calculations
JANUARY 31, 2017
Amended on
JANUARY 24, 2019
Revised on
MARCH 21, 2019
Revised on
MAY 8, 2019
PREPARED BY:
COLLINS
200 GARRETT STREET, SUITE K Q.tiy���T flay
CHARLOTTESVILLE,VA 22902 ,�► jst_
434.293.3719 PH ! ROLLI
NS FX �
Lic. No.036791
www.collins-engineering.com T"°io � 4
REVISIONS TO THIS CALCULATIONS PACKET, RELATIVELY TO THE PREVIOUSLY REVIEWED/LARGELY
ACCEPTED MARCH 215t CALCULATIONS ARE LIMITED TO THE FOLLOWING:
1. The cover sheet's revision date was updated &this summary sheet has been inserted.
2. The 'Belvedere Phase IIA Basin-Amended' routing calculations were revised to show an
emergency spillway consistent with the approved WPO 201200096 plans. The previously
submitted plans and calculations modified the emergency spillway to ensure the 10-year
design storm was not activated to avoid armoring the spillway with riprap.This was found to
be unacceptable, so the attached May 8th plans and calculations now reflect the approved
WPO 201200096 emergency spillway, with it now being armored with VDOT Class I riprap. A
small portion of the 10-year design storm now flows through the spillway with a peak design
depth of 1".This design is not problematic and is not erosive on the newly proposed VDOT
Class I riprap.
The approved WPO 201200096 plan, as shown on its sheet 5, depicts the contributing drainage area
(DA#1A)for Belvedere Phase IIA's stormwater management facility. In the impervious cover
computations, it accounts for 8.92 acres (239,220 sf+ 149,500 sf) of road and lot coverage.The
design conservatively assumed an additional 0.76 acres (33,162 sf) of impervious cover for a factor of
safety.
The approved WPO 201600071 plans utilized 11,200 sf of this 33,162 sf factor of safety.
The proposed amendment plans will utilize an additional 14,700 sf of this factor of safety. Following
this addition, the basin continues to provide a factor of safety. Additionally, this amendment
proposes to make minor modifications to the riser structure, barrel and spillway to ensure post-
development outflows associated with this amendment continue to be below the originally approved
flows with WPO 201200096.
Belvedere Phase IIA Basin- Amended
BasinFlow printout
INPUT:
Basin: Belvedere Phase IIA Basin- AMENDMENT
9 Contour Areas
Elevation(ft) Area(sf) Computed Vol.(cy)
405.00 8574.00 0.0
406.00 9545.00 335.4
408.00 11582.00 1116.6
410.00 13741.00 2053.4
411.00 16149.00 2606.3
412.00 17158.00 3223.0
414.00 19573.00 4582.4
416.00 22135.00 6126.2
418.00 23148.00 7803.2
Start_Elevation(ft) 411.00 Vol. (cy) 2606.31
5 Outlet Structures
Outlet structure 0
Orifice
name: Low-Flow Orifices
area (sf) 0.087
diameter or depth (in) 4.000
width for rect. (in) 0.000
coefficient 0.600
invert (ft) 411.000
multiple 4
discharge into riser
Outlet structure 1
Orifice
name: Mid-Flow Orifices
area (sf) 0.196
diameter or depth (in) 6.000
width for rect. (in) 0.000
coefficient 0.600
invert (ft) 414.000
multiple 3
discharge into riser
Page 1
Belvedere Phase IIA Basin- Amended
Outlet structure 2
Weir
name: Emergency Spillway
length (ft) 50.000
side angle 71.600
coefficient 3.300
invert (ft) 416.250
multiple 1
discharge through dam
Outlet structure 3
Curve
name: Anti-Vortex Device
multiple 1
Invert (ft) 415.500
discharge into riser
file: thirtysix.txt
Outlet structure 4
Culvert
name: AMENDMENT- Barrel with a Plate
multiple 1
discharge out of riser
D (in) 15.000
h (in) 0.000
Length (ft) 100.000
Slope 0.005
Manning's n 0.013
Inlet coeff. Ke 0.500
Equation constant set 3
Invert (ft) 404.500
Page 2
Belvedere Phase IIA Basin- Amended
3 Inflow Hydrographs
Hydrograph 0
SCS
name: 2-Year, 24-hr Peak SCS Storm Event
Area (acres) 19.280
CN 79.600
Type 2
rainfall, P (in) 3.700
time of conc. (hrs) 0.1700
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 38.551
peak time (hrs) 11.961
volume (cy) 4575.603
Hydrograph 1
SCS
name: 10-Year, 24-hr Peak SCS Storm Event
Area (acres) 19.280
CN 79.600
Type 2
rainfall, P (in) 5.600
time of conc. (hrs) 0.1700
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 73.818
peak time (hrs) 11.961
volume (cy) 8761.434
Hydrograph 2
SCS
name: 100-Year Storm Event- FREEBOARD CHECK
Area (acres) 19.280
CN 79.600
Type 2
rainfall, P (in) 9.100
time of conc. (hrs) 0.1700
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 144.306
peak time (hrs) 11.961
volume (cy) 17127.562
Page 3
Belvedere Phase IIA Basin- Amended
OUTPUT:
Routing Method: storage-indication
Hydrograph 0
Routing Summary of Peaks: 2-Year, 24-hr Peak SCS Storm Event
inflow (cfs) 38.548 at 11.96 (hrs)
discharge (cfs) 3.820 at 12.50 (hrs)
water level (ft) 414.338 at 12.50 (hrs)
storage (cy) 4830.317
Hydrograph 1
Routing Summary of Peaks: 10-Year, 24-hr Peak SCS Storm Event
inflow (cfs) 73.812 at 11.96 (hrs)
discharge (cfs) 22.580 at 12.14 (hrs)
water level (ft) 416.337 at 12.14 (hrs)
storage (cy) 6403.555
Hydrograph 2
Routing Summary of Peaks: 100-Year Storm Event- FREEBOARD CHECK
inflow (cfs) 144.293 at 11.96 (hrs)
discharge (cfs) 139.458 at 11.98 (hrs)
water level (ft) 416.997 at 11.98 (hrs)
storage (cy) 6953.125
Wed May 08 15:04:51 EDT 2019
Page 4
�J_-M 9oott6Eo Mhov.ICaYxoN5
�X, a4 �P( L TS G.AL �s„ 1q� �1. -ro CI. 07M mint. .
0 .?/fr.,"-/, !?
A= 1N-Ca 1x �.
• 31' (:1.s..la1 pREA \,'a3'Va
is J}
▪ I.a3 •W
..Sua: ?AcoSe Moezc-4cgtzoNs TO -fhE EX.IS-[siJG ay" T3kaa MACE
MINIAs41.4tAL.0 P4Poowzmxteof £6t.JAL. To A 154 -$nPREc,
Short Version BMP Computations For Worksheets 2-6
Albemarle County Water Protection Ordinance Modified Simple Method
Plan SWM Facility#2 Water Resources Area Development Area
Preparer: SRC,PE Date: Approved on 11/2/2012,Amended on 3/21/19
Project Drainage Area Designation SWM Facility#2(Proposed Type III Retention Basin,or facility w/equivalent removal rate)
L storm pollutant export in pounds, L=[P(Pj)Rv/12 I[C(A)2.72]
Rv mean runoff coefficient, Rv=0.05+0.009(1)
Pj small storm correction factor,0.9
percent imperviousness
P annual precipitation,43"in Albemarle
A project area in acres in subject drainage area, A= 19.28
C pollutant concentration,mg/1 or ppm target phosphorus
factor applied to RR
✓ required treatment volume in cy,0.5"over imperv.area= A(1)43560(0 5/12)/27
RR required removal, L(post)-f x L(pre)
%RR removal efficiency, RR100/L(post)
Impervious Cover Computation(values in feet&square feet)
Item
pre-development Area post-development Area
Roads&Sidewalks subtotal Roads&Sidewalks Length Wdth subtotal
Approved WPO 201200096 239.220
Impervious Road&Sidewalk Areas
239,220
Residences no. Sq.Ft subtotal Residences no. Sq.Ft subtotal
Approved Lots under WPO 201200096 149,500
Approved 7 TH lots overage under WPO 201600071 11,200
Proposed VSMP Amendment#3 lot overage 14,700 175,400
Parking Lots Parking Lots
Gravel areas Gravel areas
x0.70= x0.70=
Structures Area no. subtotal Structures Area no. subtotal
Actively-grazed pasture& Actively-grazed pasture&
yards and cultivated turf 839,837 x 0.08= 67,187 yards and cultivated turf 417,955 x 0.08= 33,436
Active crop land Area Active crop land Area
x0.25= 0 x0.25=
Other Impervious Areas Other Impervious Areas
0 Factor of Safety Impervious Areas 7262
Impervious Cover 80
54%
I(pre) I(post)
Rv(post) V
0.54 702.7
New Development(For Development Areas,existing impervious cover<=20%;
C f I(pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
0.60 1.00 20% 0.23 23.33 54.57 31.24 57% Development Area
*min.values
sN/ewaa
(ww)awil mold
(sd1)R1poI0A'/\
(sp)N!Oede3 mold Ilnd
(U0/alawela a
w 10 <o o
a
0
x
adols's
m
0
n o 0 0
gaol s,6uluuew'u .76
a ))4160a11e091'1
U O
c+>
(4)lno uanul
0
o m
u n v v v
c CS.
(g)w panul
mop 1e(o1'l0
(sja)IOUI!MOII'0
/0lsowl Ile;um/'I
(ulw)'9u00;o awn'ol
palelnwnoue wns HO
011 lUawa1Uw vo
O Lis' E
'fl o o n
x
gaoO leuonm'0
(sane)
ewe aOeulwa'y
U o
wnlomis 6ulpu3 p p
> w
w
Vj a/nlongs 6upgs ry
W
• a � Q w U
w a 5d d d
a a
1=11111111
C, 0 cz o
ci)
tri (-,i 6 ob
0 r- ct
(.7 ,71- -71- cr O•
[J•
a > '
tu3 N N <1-
<t 1+4
3 t —
6 tri -•
- -
-0
77 .4
a.) a N N .rr
4 x N kr) 1-,
-. 6
v
I... — ..---1
z z z
,-.. o N --
t-• -
-
00 ,.co a,
-. 0 0
,...,
00 N
N <Ch ,I7
,-
N •</- p
kel N
WI
... 6 6
ir w
00 co N
0
.-, .
0' ,.(7 C•1 0
Z
CZ) N << 0
.... 0 6 6 6
.ti P
..c.j 4 N .1-
co V
tt =
.4
C..) ›, kr) 00 ,-
,.to •
er; a.)
6
Z 7:2
..... — cc
,--4 0 oo s...
o)
"Cs = U
CS
k.
C., ; i:
a
6 6 =
co
C.) 75 s...
= . . . .7)
N <-i . >1
Z t'
6 6 6
"ts .
,.....?\ .
r- cps 00
00 4:; 71:
c.)
a) N .tt N
•-, 00 00 0
0 C•1 6 6
1
4:> N c>
cv o c:,
(7) o o
c5 6 6
1--. (-,) c>
VI .-.
6 6 6
. .
6 vo vo ,.o
co 6
co 3
6
,-. .....
w
o) a ,.,, co co co
y. 3 w C7, cr• Cr.,
I- L, tr; rn 6
c w a
.tlo g ‘zi- kr.) ,.c.)
m• 71- -1-
EA 6 6
a.) 0 v, .
(21 .
214 2 6 6 a
›-, >-. ›.
l �
pg
BELVEDERE PHASE IIB STORMWATER
MANAGEMENT CALCULATIONS PACKET
Date of Calculations
JANUARY 31, 2017
PREPARED BY:
al COLLINS ar 4 hcti
200 GARRETT STREET, SUITE K
CHARLOTTESVILLE, VA 22902
434.293.3719 PH
434.293.2813 FX
www.collins-engineering.com
The approved WPO 201600096 plan, as shown on its sheet 5, depicts the contributing drainage area
(DA#1A)for Belvedere Phase IIA's stormwater management facility. In the impervious cover
computation it accounts for 8.92 acres (239,220 sf+ 149,500 sf) of road and lot coverage. The design
conservatively assumed an additional 0.76 acres (33,162 sf) of impervious cover for a factor of safety.
The proposed plan uses a portion of this 0.76 acres with its addition of 7 townhouse units (11,200 sf).
This has been accepted by County Engineering, and a factor of safety/overage still remains with the
facility's design. The proposed plan also has a slight increase in acreage. These two factors cause a
slight shift in the hydraulics for the existing basin. The following two analyses apply the calculated
area and CN values to the approved basin, with the proposed analysis having a smaller outflow.
Imwe 'Sup,
Approved Belvedere Phase IIA Basin Inputs
BasinFlow printout
INPUT:
Basin: Approved Belvedere Phase IIA Basin Inputs
9 Contour Areas
Elevation(ft) Area(sf) Computed Vol. (cy)
405.00 8574.00 0.0
406.00 9545.00 335.4
408.00 11582.00 1116.6
410.00 13741.00 2053.4
411.00 16149.00 2606.3
412.00 17158.00 3223.0
414.00 19573.00 4582.4
416.00 22135.00 6126.2
418.00 23148.00 7803.2
Start_Elevation(ft) 411.00 Vol.(cy) 2606.31
5 Outlet Structures
Outlet structure 0
Orifice
name: Low-Flow Orifices
area (sf) 0.087
diameter or depth (in) 4.000
width for rect. (in) 0.000
coefficient 0.600
invert (ft) 411.000
multiple 4
discharge into riser
Outlet structure 1
Orifice
name: Mid-Flow Orifices
area (sf) 0.196
diameter or depth (in) 6.000
width for rect. (in) 0.000
coefficient 0.600
invert (ft) 414.000
multiple 4
discharge into riser
Outlet structure 2
Weir
name: Emergency Spillway
length (ft) 50.000
side angle 71.570
coefficient 3.300
invert (ft) 416.250
multiple 1
discharge through dam
Page 1
Approved Belvedere Phase IIA Basin Inputs
Outlet structure 3
Curve
name: Anti-Vortex Device
multiple 1
Invert (ft) 415.500
discharge into riser
file: thirtysix.txt
Outlet structure 4
Culvert
name: Barrel
multiple 1
discharge out of riser
D (in) 24.000
h (in) 0.000
Length (ft) 100.000
Slope 0.005
Manning's n 0.013
Inlet coeff. Ke 0.500
Equation constant set 3
Invert (ft) 404.500
3 Inflow Hydrographs
Hydrograph 0
SCS
name: 2-Year, 24-hr Peak SCS Storm Event
Area (acres) 18.440
CN 80.400
Type 2
rainfall, P (in) 3.700
time of conc. (hrs) 0.1667
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 38.380
peak time (hrs) 11.950
volume (cy) 4523.873
Hydrograph 1
SCS
name: 10-Year, 24-hr Peak SCS Storm Event
Area (acres) 18.440
CN 80.400
Type 2
rainfall, P (in) 5.600
time of conc. (hrs) 0.1667
time increment (hrs) 0.0200
Page 2
Approved Belvedere Phase IIA Basin Inputs
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 72.744
peak time (hrs) 11.950
volume (cy) 8574.390
Hydrograph 2
SCS
name: 100-Year Storm Event- FREEBOARD CHECK
Area (acres) 18.440
CN 80.400
Type 2
rainfall, P (in) 9.100
time of conc. (hrs) 0.1667
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 141.053
peak time (hrs) 11.950
volume (cy) 16626.031
OUTPUT:
Routing Method: storage-indication
Hydrograph 0
Routing Summary of Peaks: 2-Year, 24-hr Peak SCS Storm Event
inflow (cfs) 38.153 at 11.96 (hrs)
discharge (cfs) 3.923 at 12.48 (hrs)
water level (ft) 414.296 at 12.48 (hrs)
storage (cy) 4799.300
Hydrograph 1
Routing Summary of Peaks: 10-Year, 24-hr Peak SCS Storm Event
inflow (cfs) 72.315 at 11.96 (hrs)
discharge (cfs) 22.788 at 12.14 (hrs)
water level (ft) 416.246 at 12.14 (hrs)
storage (cy) 6328.792
Hydrograph 2
Routing Summary of Peaks: 100-Year Storm Event- FREEBOARD CHECK
inflow (cfs) 140.221 at 11.96 (hrs)
discharge (cfs) 134.492 at 11.98 (hrs)
water level (ft) 416.916 at 11.98 (hrs)
storage (cy) 6885.310
Tue Jan 31 11:08:30 EST 2017
Page 3
•
Approved Belvedere Phase IIA Basin WITH 7 TOWNHOMES
BasinFlow printout
INPUT:
Basin: Approved Belvedere Phase IIA Basin WITH 7 TOWNHOMES
9 Contour Areas
Elevation(ft) Area(sf) Computed Vol. (cy)
405.00 8574.00 0.0
406.00 9545.00 335.4
408.00 11582.00 1116.6
410.00 13741.00 2053.4
411.00 16149.00 2606.3
412.00 17158.00 3223.0
414.00 19573.00 4582.4
416.00 22135.00 6126.2
418.00 23148.00 7803.2
Start_Elevation(ft) 411.00 Vol. (cy) 2606.31
5 Outlet Structures
Outlet structure 0
Orifice
name: Low-Flow Orifices
area (sf) 0.087
diameter or depth (in) 4.000
width for rect. (in) 0.000
coefficient 0.600
invert (ft) 411.000
multiple 4
discharge into riser
Outlet structure 1
Orifice
name: Mid-Flow Orifices
area (sf) 0.196
diameter or depth (in) 6.000
width for rect. (in) 0.000
coefficient 0.600
invert (ft) 414.000
multiple 4
discharge into riser
Outlet structure 2
Weir
name: Emergency Spillway
length (ft) 50.000
side angle 71.570
coefficient 3.300
invert (ft) 416.250
multiple 1
discharge through dam
Page 1
Approved Belvedere Phase IIA Basin WITH 7 TOWNHOMES
Outlet structure 3
Curve
name: Anti-Vortex Device
multiple 1
Invert (ft) 415.500
discharge into riser
file: thirtysix.txt
Outlet structure 4
Culvert
name: Barrel
multiple 1
discharge out of riser
D (in) 24.000
h (in) 0.000
Length (ft) 100.000
Slope 0.005
Manning's n 0.013
Inlet coeff. Ke 0.500
Equation constant set 3
Invert (ft) 404.500
3 Inflow Hydrographs
Hydrograph 0
SCS
name: 2-Year, 24-hr Peak SCS Storm Event
Area (acres) 18.940
CN 79.400
Type 2
rainfall, P (in) 3.700
time of conc. (hrs) 0.1667
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 37.817
peak time (hrs) 11.950
volume (cy) 4457.476
Hydrograph 1
SCS
name: 10-Year, 24-hr Peak SCS Storm Event
Area (acres) 18.940
CN 79.400
Type 2
rainfall, P (in) 5.600
time of conc. (hrs) 0.1667
time increment (hrs) 0.0200
Page 2
Nome Num,
Approved Belvedere Phase IIA Basin WITH 7 TOWNHOMES
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 72.599
peak time (hrs) 11.950
volume (cy) 8557.243
Hydrograph 2
SCS
name: 100-Year Storm Event- FREEBOARD CHECK
Area (acres) 18.940
CN 79.400
Type 2
rainfall, P (in) 9.100
time of conc. (hrs) 0.1667
time increment (hrs) 0.0200
time limit (hrs) 30.000
fudge factor 1.00
routed true
peak flow (cfs) 142.213
peak time (hrs) 11.950
volume (cy) 16762.709
OUTPUT:
Routing Method: storage-indication
Hydrograph 0
Routing Summary of Peaks: 2-Year, 24-hr Peak SCS Storm Event
inflow (cfs) 37.594 at 11.96 (hrs)
discharge (cfs) 3.746 at 12.50 (hrs)
water level (ft) 414.259 at 12.50 (hrs)
storage (cy) 4771.944
Hydrograph 1
Routing Summary of Peaks: 10-Year, 24-hr Peak SCS Storm Event
inflow (cfs) 72.170 at 11.96 (hrs)
discharge (cfs) 22.681 at 12.14 (hrs)
water level (ft) 416.242 at 12.14 (hrs)
storage (cy) 6325.478
Hydrograph 2
Routing Summary of Peaks: 100-Year Storm Event- FREEBOARD CHECK
inflow (cfs) 141.374 at 11.96 (hrs)
discharge (cfs) 135.748 at 11.98 (hrs)
water level (ft) 416.921 at 11.98 (hrs)
storage (cy) 6889.435
Tue Jan 31 11:08:14 EST 2017