Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800037 Bond Release 2019-05-14
1��«5 ,� of arN cT _. /IV/ kit, COUNTY OF MARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: IrLarcii5ville. ILAirttcc Irk PLAN/PERMIT No.: ( jp//o O_oo$ coo 37 DATE: 5 no / 20 it This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re-inspection and annual maintenance fees invoiced have been paid. Date As-built plan was approved by Engineering Division: . or CD DEQ Termination Date or GIO Engineering Review Community Development Department All fees invoiced on the above project have been collected. VS Director �l V/ Director of Community Development,_yEngineer 6(( c f(( 1 Date } Cc: Ana Kilmer Revised:07/03/2018 frr ,�� of fAllb ctahat ^ ? U V- COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: Ecutvotf2 ta5iAeSS ?Ark_ PLAN/PERMIT NO.: PD Zoog • (7(90 3-1 DATE: 5' 1011 q This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all re-inspection and annual maintenance fees invoiced have been paid. ' :A1'0142 Erosion Control Inspector DEQ Termination Date orCf1) Community Development Department All fees invoiced on the above project have been collect u`ciT Director of Community Developmen Engineer County Enginr el Date Cc: Ana Kilmer Revised:07/03/2018 4 Internal Use Only /, Date Received: Fee Paid: h IV t /��,(JQ��� Received by: Off$ tl 'III��-. //V �I ` et- — Intake: Forward to Management Analyst 8 tr _©ta! I 9 �� l 5/108/ 0,7 1IRGIN�P il BOND INSPECTIOON REQUEST APPROVED PLAN# A&i-S 2`�J z_C — COO -3± PROJECT NAME: e tX.� 3��XXX , L6R Y. 4 ' ( s listed on the approved plan) • This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please check the inspections requested. , VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 E Request to reduce bond - tequest to release bond ❑ Subdivision(roads, drainage, etc.)per Subdivision Ordinance section 14-435 and 14-438; $269 D Request to reduce bond ❑ Request to release bond E Water& Sewer per Subdivision Ordinance section 14-435 $269 0 Request to reduce bond ❑ Request to release bond E Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $301 ' TOTAL FEES Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,VA 22902,Attention: Management Analyst-Phone 434-296-5832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings,inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is coniplete. Please submit all items on the checklist within 30 days,or withdraw the request and receive a refund. The revised estimate should be sent to; EMAIL: OR GU LAD SS: te/ Signature of Owner/Developer Sperin /d )W. Kst—e ` c291/ / Print Name Date Revised 7/15/2014,7/20/2015,11/3/2015,5/9/2018