HomeMy WebLinkAboutWPO201100017 Inspection Erosion Control Plan 2013-08-20 t_ :� pin Obi
Doe Recdredt I t Fcc r,d. t�U
Rccetved by; ��-��1 ,.rw.4
Infal r. Fonrnrd to Alnnapement Andyel
(�jl�7j
llrJr..
INSPECTION REQUEST
Martha Jefferson Health Services Outpatient Care Center
PROJECT NAME: at Proffit Road WP02011-00017
(as on bond estimate request form and approved plan)
This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for
each inspection. Please check the inspections requested.
ti/5, 100 t Erosion& Sediment Control per Water Protection Ordinance section 17-207
i1.Q (Pt°)1C1 Stormwater Management per Water Protection Ordinance section 17-306 S60
1 �
O Subdivision (roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; S250
❑ Water&Sewer per Subdivision Ordinance section 14-435 5250
❑ Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) S280
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902,Attention:Management Analyst-Phone 434-296-5832;Fax 434-972-4126. The County will by to
make inspections within thirty days of receipt of this request and the required fee. Bonds will not be reduced
below 20%of the original amount This amount is held until acceptance of the bonded improvements.
If this inspection is for a public or private street which is not bonded, the S250 fee applies and it will be
processed as an inspection per the Subdivision Ordinance,
For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a
request for reduction should only be made once all site work is complete and the project is ready to start the
one-year landscape maintenance period. Bonds for landscape maintenance are 33.3%of the total landscaping
value and are maintained at that amount for the one-year maintenance period.
The revised estimate should be sent to;
EMAIL: t telk . .5,'4Ta PA-1- " ors
OR REGULAR MAIL ADDRESS:
Signatu/4 ±Owae / soper
Michael Spat te
/3
Print Name Date
rs:; I
Revised 7/26/2012 _�! 'FL 0Pf`J,f_:<
�OF ALg Compliant El Notice to Comply❑
'iif�a Stop Work❑8'®�_•,4 Bond Insp
` �' Warning II] Under NTC ❑
�`' IN`P Under SWO ❑ Re-inspection (fee) ❑
Erosion Control Inspection Report
Project Name: Mc r/1 \f p&mon ad-tke1,'g_n 1 File Number• iiP0 go( ( - O O (7
County Inspector NJ)r„e_,, 0411) Rat L' (� Inspection Date: �/ap /? Time: /C)`c'v
r � llf
For Warnings or Notices, DATE TO COMPLY BY
Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction 0 Finish Grading ❑ Stabilization ❑ swm conversion 2/
Compliance
Yes NoComments/Notes
Silt, safety,
tree fence
Diversions,
Berms,
ditches
Inlet, culvert
protection
Stream
work,
crossings
Traps,
Basins
Stabilization
Entrances
Limits
toy cad CO m PLR `i ce l,z s-t_ tJd✓kGl