Loading...
HomeMy WebLinkAboutSDP199000078 Plan - Approved Preliminary Site Plan 1988-09-28 'i . % leOF N,U�! it al lafI COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 McIntire Road Charlottesville, Virginia 22901-4596 (804) 296-5823 September 28, 1988 Ron Langman P. O. Box 7086 Charlottesville, VA 22906 - RE: Senior Center Preliminary Site Plan Dear Mr. Langman: At its meeting on September 27, 1988 , the Albemarle County Planning Commission unanimously approved the above referenced plan subject to the following conditions: 1. The final plan will not be signed until the following conditions have been met: a) Fire Officer approval; b) Department of Engineering approval of grading and drainage plans and calculations; c) Department of Engineering approval of stormwater detention plans and calculations; d) Department of Engineering issuance of an erosion control permit. e) Planning Department approval of landscape plan; f) Planning Department approval of technical notes; g) Staff approval of grading easements documents. h) Albemarle County Service Authority approval of water and sewer plans. . C4 Ron Langman Page 2 September 28, 1988 2. A building permit will not be issued until the following condition has been met: a) Virginia Department of Transportation issuance of a commercial entrance permit; 3. Administrative approval of final site plan. r 4. Administrative approval of subdivision pioposed on site plan. 5. A certificate of occupancy will not be issued until the following condition is met: a) Final Fire Official approval; In order to be eligible for administrative approval by the agent, a final site development plan shall be submitted on a submittal deadline with the appropriate fee within six ( 6) months of Planning Commission approval of the preliminary plan. In any case, the final site development plan shall be submitted within one ( 1) year of the Planning Commission' s approval of the preliminary plan or the approval shall expire. During the above time period, the applicant shall work to satisfy the conditions of preliminary site development plan approval. The applicant shall have the appropriate agency notify this Department in writing that the applicable conditions have been met. To obtain tentative approvals for the final site development plan from the agencies represented on the Site Review Committee, the applicant shall submit the appropriate plans and materials to each agency, individually, for their review. Once the plans have been tentatively approved by each agency, the applicant shall have each agency notify the Planning Department in writing, that tentative approval has been secured. Once tentative approvals are secured, the final plan shall be submitted to this Department, as stated above. The final plan mylar can be signed at the scheduled Site Review Meeting if after staff review, the final plan meets all ordinances and conditions of approval. In order to expedite the completion of the above items, please have the appropriate agency or department notify Kathy Brittain ( 296-5875) in the Zoning Department, in writing, that the applicable conditions have been met. Ron Langman Page 3 September 28, 1988 Please note that the Zoning Ordinance requires that construction be commenced within eighteen ( 18) months of the date of approval or the approval will be void. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me. Sincerely, William D. Fritz Planner WDF/per cc: Roudabush, Gale & Associates Jay Schlothauer Steve Cresswell Gary Beasley Jeff Echols Kathy Dodson GT�7flx ,1 dP 41 G Ar+cEL - �E ('81 Ct1lP BOt'i Lt HCT OF CEH?)it'?L VA i Z OHCC: t�l'1 �RESEHT usE: 3orTuny � RnT/ o��itc SITE. DATA OWHEC : VEA 5HI COLA 50TTLIHCT OF CEHr.9L p AOy00X 510(. CHf1NLOJTESVILLC , YA 2L905 0FVEL.OPE9: 9EHIOH CEHjuk C/o. A.V.C. 0 box Y0 86 6gAL011 E9VILLE 1 VR 2290(n LFSF)L REfEAENCF T. r1. GI W SECTION 5 ff)ACCL IR 00 T05/�4 5_rl .K. HAIL 510t%9LK ALONy HORTH SIDE Of �IN RECHSRIE15 DR14F,. GLEV_ ° 4EE 0/a LOCRIED Off NTE fLRH U < oo z p a)o 0 (} N CC N I O n J rn C) J LL O) w U J O _ z > co O w '(� V) ~ O J C) Q 2 J O W Q C� 2 C/) o Lu w m w co U) w cn w 0 z uS z w w D_ O Z C7 � z w J REVISIONS SEgT 6198P> SCALE I' = 2o' CONTOUR INTERVAL I FOOT DATE AUG 6, 1988 E Tm � w O�j lz�— �o PAGE / FILE NUMBER 7082