Loading...
HomeMy WebLinkAboutWPO201200087 Bond Estimates 2014-02-05 Project Name Albemarle Health&Rehabilitation Center WPO the number:WP0201200087 Erosion end Sediment Control Bond Estimate Item arm N,2.yini Unit Cost Pet Number Imsanem elahflalbn(PS,TS) ad saws $5,00000 $42,050.00 ' • se lanes(SF) I4000fl $520 $7,000.00 screwfenu ISM) 376011 5500 $1.875.01 aversion(OD,FD,RWD) 1613n $13.00 $23,400.00 temporary slope drab 115D) -hoof 0n pip Qwnslor 0h $200 $0.00 1 temporary 0Mwe0 bap(ST or COP) Melted lot wlml height of dam2110e 311 cut al dam, 0n Ienn11t 11MslwNI MVO of dam at faro 4n cut n ngnsee 4n assume face all: b,ylf Waam 103n br0Taed 70ft mist wtlln.3e10 WOTAN, 25fl Width of an 1011 mime 0Og5.( (Damp.nlroll 252.5ry let PO 938q 51300 IeN0 Of cpeway 17 ft (weal 253,8 wall 016p*ray 20n (sp5aay store lord) Si $50.00 $6240.56 2 IemPoncy m4me0 bap(ST or SP) Mcfbcd for velum( M'BMol dam el toe 3n at al dam 0fl Barth)I(total all MIoM of dam at face 3 ft we al lyb sale 4fl aufeneface wl2: kn.al dam 25ft length 000 2011 total&en.2901 bpo'df 2.5fl wbf cleat 45n awtpe Mgt-1 (cump62 906 48.13ry (co w4 71.1 cy $1303 boofM epoway 5 tt Icy aM 07.3 wilily of op0.2y loft (WIPw•ay stars ten) 7.5 $50m $1b10.09 . 1 lemporaty pediment basin(ye) 9214910am al ice 8fl col adam 00 bight Ndamelface aft ate Nlgnstle 4n • bryf of dam 12011 booth al cut 100ft top nben loft whin of set 40ft J 1wmp,IYW) 1788.9cy (mewl) 355.6 cy $13.00 half WpOf M ea (0mV 1507.4 , wan]of spoxay 20 n (1POMay sure tom) ISo $5000 $32296.30 deer height 3n Me dish 301n (be fine plot $5500 barrel length 50II @te W base) $200 barrel dbmeter 18b (barrel wit pIca) $40.00 banal coOars 0 baffle length 0ft $2,385.00 M0 farce WMr0ucbn(IP) 610000 $0,00 Mono lien palection(IP) 1 $2N.00 f3,8W.00 WWI protection(OP) length 30fl width Loft $1,35000 $4.05000 enamel UGC,metlel brptll 250ft Wan left 2325000 WA dam depth PWnml In channel width 10ft $225.00 $12500 PJaro15 Mang booth 20ft Wdth 500fl • $10,75000 $18,750A0 certosabn entracte(ME) $1,O.U00 $0.00 wash oath 62.o00Y0 $3,OW 00 pared construction cmnance $3.500.00 $3,50020 rlprap,pSand deem 2n hoof 12ft wtlh 1.0 Om) 0.15 $80.00 $9,00 sway and layout(pre per 0.1 m1.) was '1 byre are bases 2 $1,6W03 mrehoaslbn $50000 Poem 0raulp(cempued btlpsole*y) mu sum $154,350.94 pool moon $27,152.84 mrmooa y 117,750.36 Total $195,260 • ^ J . . 1 _ CC. B. II,ZOf, > f Q�N cc +b . ZD X Ar Sd =,b /17 etc+ 0 e 'TT 2512014