Loading...
HomeMy WebLinkAboutARB201900064 Application 2019-06-06/� j Comm -nit aegelopmentDe a—er- /` emarle CounLTV 4 I ff 'ire � av `^a 'u::esu e. v.422 24EH Planning Application : t434; 2CS-5832 Fax: 1.434; ai2.4123 TMP 060FO-00-00-00300 0-,,,ner(sj: CKW 2 L L C Application # ARB2019000 PROPERTY INFORMATION Legal Description f ACREAGE PARCEL B� Magisterial Dist. lack louett w Land Use Primary Forest -v f Current AFD Not in AjF District Current Zoning Primary Neighborhood Model District v I APPLICATION INFORMATION Street Address Entered B •Pplication Type Architectural Review Board Jsnnifar FritcF �F �r j�;4i7D19 — Project lGeorgetown Hydraulic Proffession Offices -Final Received Date ��06j03/14� Received Date Final Submittal Date 06j019 � Total Fees Closing File Date C Submittal Date Final v3j_ Revision plumber Comments Legal Ad SUB APPLICATION(s) Type Sub "�pplic3titr --- k-orrmert -- -- Final Site Development Plan 06 j 03 j 19 APPLICANT j CONTACT INFORMATION ContactType Name �tidress Cit ate ione PhoneCeil CKA- 2 L L C 1747 EaRL'YSIRLLE RD CHARLOTTE SVILL I Signature of Contractor or.Authorized.Agent Date Architectural Review Board Application Part A Applicant, contact and Paid Information Project Name: SOP 20190.0014. Georgetown Hydraulic Professional Offices Tax map and parcel(s): 60E-3 Physical Street Address: NA CAntact..prmn: Read A. ► yrphy Business BMC Holdings .Group Address 400'Locust Ave., 'Ste 3 Daytime Phone O 977-6400 City 'Charlt)ttesville State VA Zip 22902 Fax # O NA E-mail reid@bmcholdingsgroup.com Owner of Record: CKW 2 LLC Address 1747 Earlysville Road Daytime Phone(__) 434-566-1978 City Chadottesville state VA zip 22901 Fax # C_) NA E-mail ebash5@gmail.com P i W.Re'view TvDe"AM .Vane Select +eview type Review by the Architectural Review Board Conceptual Plan/Advisory Review (for a Special Use Permit or a No Fee Rezoning) Preliminary/Initial Review of a Site Development Plan No Fee X Final Review of a Site Development Plan $1075.00 Arnendmerrt to an approved Certificate of Appropriateness: S 242:00 Building Permit Review $. 634-00 County -wide Certificate of Appropriateness Structures 750' or more from the EC, no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fen6mgor Equipment ass Lighting No Fee Additions to ARB-:approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50% or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# A Fee Arnount $ Date Paiduk/lqBy who? 1 eipt # )jj-Kjheck # _ By County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126 10/2015 Page 1 of 2 OVER --> Part C: Description of Prop©sal Describe your proposal: Attach a separate sheet if necessary. Part D: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal itemsin their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I gown the subject property,or have the legal power to :act pan behalf of the owner in filing this application. *',See submittal requirements below. I.also mortify that the information provided pan this application and acoo:mpanying 'nfomiati+on'is accurate, true,;and correct to the best .of..my knowledge, and that the attached plans co�inform�on ruby the appropriate checklist. Reid A. Murphy / Manager Printed name, Title 6/6/2019 Date 434-977-6400 Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited nam�e a�docuement1.a ceptabl�e to the County must be s ubmitted �cerki in the narree .of a trust, or in a fictitious corporation, partnership oxzssociation, or in that the person signing above has the authority to do go. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 1. l./201.0 Page 2`of. 2 OVER --> Arc hitectural Review Board Final Review of a Site Development Plan Submittal Requirements Checklist L Part A: Applicant, Contact and Parcel Information Project Name: 'J D? q — y G to scow,n �`I�l��.� Tme,nwp and parcel(s): (aQ r — 3 Physical stmetaddress: NIA Contact Person: Business Name: % MC kA*G 1 KQ g G C O V Address 4 V!U I..eV_kgk-- IN-v & —tS+G 3City I,aC'e eS V4, klo— State Zip L2 lam+ Z Dk"ime ftm)e J 10 Meh of d i n �yc�ro� �. Gor+• I Part B: SubmittaI Requirements I lmportai. Submittal packages must contain 8 collated copies of all information unless otherwise indicated. A. Written description of the proposal Provide a descriptionof the proposal_ Identify changes from: the preliminary submittal. Indicate s ificafly how each ARB comment from the prefiminary review has been addressed. If there are no arrges proposed, then explain wiry. Explain how the proposal is compatible with the surrounding area and the'Entrance Corridor. . Site plan showing the following (drawn to the scale of 1 "=20 ; clearly legible and folded): ❑ Location(s) of proposed building(s) on the site. ❑ Location of proposed parking, travetways, walkways and other improvements. o? El Mechanical equipment, trash containers, loading and service areas, other similar features and improvements, and associated screening. f _`� ❑ Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient off -site topography to describe prominent and pertinent off -site features and physical characteristics, \, but in no case less than 50-feet outside of the site. hV ❑ Location and size of existing and proposed utilities and easements. Identify type of utility and extent of easement. ❑ Stormwater management plan. ❑ Location of,retaining walls indicating top and bottom elevations, maximum wall height, and proposed materials, with material and color samples. ❑ Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. For revised drawings, clearly identify revisions made. 1 OVER S C. Landscape plan showing the following (drawn to the scale of 1 "=20' or larger, clearly legible and folded: ❑ Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines. ❑ Existing landscaping to be removed. Include the location, size, and species. ❑ Landscape key including all landscape symbols and a description of what they represent. • �tj ❑ Location of existing and proposed tree lines and tree save areas. o ❑ Location of existing natural features. jt�^ Q Location of individuaf trees of 6-inch caliper or greater and aff significant groups of trees indicated by 0 botanical name and caliper. r�� ❑ Location and height of above -ground utilities and associated easements, and location of below - ground uti tes and associated easements. Storm water facilities. ❑ Provide a signed, tree conservation checklist with all checklist items drawn can the landscape plans. ❑ Include: tree protection fencing and limits of work on the landscape,,gradiag and E&S plans. . Lighting plan showing the following (drawn to the scale of 1 "=20' or larger, clearly legible and folded: fE Location of all proposed building and site lighting. �;%o ` Lighting schedule identifying all proposed light fixtures, poles and brackets. Manufacfurer's cut sheets illustrat"tng proposed lighting fixtures and information on illumination type, intensity, style, shielding, color, finish, and installation height. wPhotometric plan• addressing all fixtures and indicating that lighting does meet the requirements of Section 4.17 of the Zoning Ordinance. Coordination of lighting with landscaping and other site elements. E. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections): 3;1-bimensioned architectural :elevations of the proposed building(s). Elevations must be drawn to the scale of 118"=1'-0". Include a building materials .schedule ,and key on the elevation drawings. Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the overall building design. [Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and roof height(s) relative to the natural elevations along the Entrance Corridor. de set of all building materials / colors. A floor plan adequate to show exterior walls, windows and doors. F. Additional material ❑ Provide labeled, color, 8-'/" x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the proposed development as seen from the Entrance Corridor are often useful for gaining a clear understanding lof the proposal. The ARB may require :such images in certain cases when other ,submitted documents do not answer all -questions of building form, building details, materials, context, topography, andfor visibility. ❑ Any additional material that is necessary to address comments made by the ARB at the preliminary review with a memo itemizing how each of the preliminary comments have been addressed. ❑ The applicant is welcome to submit any additional material that will make the final site development review more productive. Drawings or othersubmAta+ items that clafify topogfaphy, visbflity, utilities, landscaping, or other unique or unusual conditions are welcome. 2 OVER - Part C: Applicant Agreement Applicant must read and sign Each application 'package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of aff submfttaf items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a final site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. a Only complete application packages •gill be scheduled for ARB review. The application package is not complete without this checklist completed„ -signed and included with the required submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, I hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. nature of person completin h list Date 62{; a A. M In 434 r<s295 -(5caC� Printed Name / Title Daytime phone number of Signatory County of Albemarle Department of Planning.and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434) 296-5832 Tel www.albemarle.org revised 10/24/2014 3 OVER -