Loading...
HomeMy WebLinkAboutWPO201800091 Bond Estimates 2019-06-12Project Name: UVA Research Park Sewer Extension VESCP/WPO WPO201800091 - ACSA Plan WPO file number: WPO201800091 TMP (s): 03200-00-00-006RO Date Estimate Completed: 06-12-19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) 7.4 acres $5,000.00 $36,800.00 2 silt fence (SF) 6431 ft $5.00 $32,155.00 3 safety fence (SAF) ■ 0.0 ft $5.00 $0.00 4 diversion (DID, FD, RWD) 6220 ft $13.00 $80,860.00 5 temporary slope drain (TSD) pipe length 0 ft pipe diameter Min $0.00 $0.00 6 silt fence inlet protection (IP) $100.00 $0.00 7 stone inlet protection (IP) $200.00 $600.00 8 check dam depth in channel 2 ft channel width �ft $360.00 $0.00 9 construction entrance (CE) $2,500.00 $0.00 io wash rack $2,000.00 $2,000.00 u paved construction entrance $3,500.00 $3,500.00 12 survey and layout (price per 0.1 mi.) acres 7.36 traps and basins 3 $5,180.00 13 mobilization $2,500.00 14 Temporary Access road 15 Temporary Culvert $0.00 cost sum $163,595.00 contingency $16,359.50 WP0201800091 UVA Research Park Sewer Ext VESCP_ESC_bond_est_09-27-17_061219 Total $179,960 6/12/2019