HomeMy WebLinkAboutARB201900015 Checklist 2019-06-04RESUBMITTAL REVIEW CHECKLIST
ARB 2019-15, Bank of America Rio Rd., landscape and lighting CoA and LOR
6/4/ 19 HNM
Previous ARB and LOR Comments
6-4-19 Review
Submit site and architectural drawings with your LOR application.
OK, 6 copies of the same package included. Packet includes A00.00
Everything that has been submitted for the ARB application must be
Cover sheet; A03.01 Site Plan & Landscape Plan; A09.01 Exterior
duplicated and submitted for the LOR application.
Elevations; E0.01 Electrical Cover Sheet; E2.01 Electrical Site Lighting
Plan — New Work; E3.01 Electrical Photometric Plan; C1.00 Approved
Original 1996 Site Plan; C1.10 Existing Conditions and Demo Plan;
C1.20 Landscape and Lighting Plan
Observe traditional conventions and revise the site plan drawings to
A03.01 has not been revised to show North at the top of the page.
orient the North arrow at the top of the page.
E2.01 has not been revised to show North at the top of the page.
E3.01 has not been revised to show North at the top of the page.
Revise the site plan drawings to include public roads Rio Road East
A03.01 has not been revised to include the public roads and names.
and Putt Putt Place.
E2.01 has not been revised to include the public roads and names.
E3.01 has not been revised to include the public roads and names.
Revise the site plan A03.01 which shows existing conditions to reflect
A03.01 has not been revised to show existing conditions and to
the landscaping and site features that currently exist on the ground.
reflect the landscaping and site features that currently exist.
This will require a site visit or survey.
Note that not all of the landscaping which was approved with the site
The approved site plan has been included in C1.00, but not amended
plan in 1996 exists on the site today, which means the site plan is not
to show the landscaping as it exists today or the proposed
in compliance (for instance, shrubbery on the eastern property line,
landscaping moving forward.
near the southeastern corner of the site, is not visible in current -day
(last capture July 2018) Google Street Views). This landscaping must
be provided.
Revise the architectural drawings on sheet A09.11 to include all light
Not accurate. See photos from site visit and compare to elevations.
fixtures visible from the Entrance Corridor (Rio Road East).
Ensure that the property lines drawn on the site plans are correct and
Not accurate. Sketch plans are abstract and not refined.
that the site plans reflect all of the site conditions currently existing on
the parcel.
Merge "site" and landscape plans on A03.01. Eliminate sheet E1.01.
OK, two plans previously on A03.01 merged and E1.01 eliminated.
Ideally, your application package should consist of three site plan
However, application submission still has not been pared down to
drawings (in addition to the building elevations you provided):
essentials as suggested in previous review.
a. A Current Conditions and Demolition Plan that shows
Previous ARB and LOR Comments
6-4-19 Review
all current site features and all lighting and landscaping to
be removed. This should include a schedule that explains
exactly what fixtures will be removed and not replaced
and what fixtures will be replaced.
b. A Landscape Plan that shows proposed landscaping as
well as current landscaping. This plan should also include
all of the existing and proposed freestanding light poles on
the site.
c. A Lighting Plan that shows existing and proposed light
fixtures; if the plan becomes too complicated to read, you
may omit those light fixtures that are either outside of the
scope of work and/or that will be removed and not
replaced (those should be shown on the Current
Conditions and Demolition Plan).
Ensure that all of the current and proposed wall -mounted lights are
OK
drawn on the elevations visible from the Entrance Corridor street (i.e.,
the south, west, and east elevations. The north elevation is not visible
from Rio Road and therefore does not require ARB review).
Note that the color of the poles of the two proposed new freestanding
OK, all new lights are stated as bronze in the luminaire schedule on
lights has not been stated in the luminaire schedule or in
E3.01
manufacturer's specifications and that the new poles must match the
color of the existing light poles on the site. This will be made a
condition of the Certificate of Appropriateness. If bronze is the color
of the existing freestanding light poles, then the color bronze must be
selected for the two new proposed poles in order to maintain
consistency.
Remove light models Rl, R2, and R3 from the luminaire schedule if
OK, removed from photometric plan on E3.01 and from luminaire
they are to be removed and not replaced. Remove light model Y1 from
schedules. Still shown on E2.01 and should be removed.
the luminaire schedule if it is outside the scope of work.
Provide a landscape schedule on a revised landscape plan that details
OK, provided on C1.20
the plant symbol used; quantity; species; common name; caliper/size at
planting; and canopy of any proposed (new) landscaping. Note that all
proposed species should be selected from the Albemarle County
Recommended Plants List; canopy calculations can be attained using
this Plant Canopy Calculations reference sheet.
Provide the standard plant health note on the landscape plan: All site
OK, provided on C1.20
plantings of trees and shrubs shall be allowed to reach, and be
Previous ARB and LOR Comments
6-4-19 Review
maintained at, mature height; the topping of trees is prohibited.
Shrubs and trees shall be pruned minimally and only to support the
overall health of the plant.
There is spillover along the Rio Road frontage in excess of half (0.5)
OK, no spillover in excess of 0.5 fc on west, south, or east property
footcandle (fc). As per the Zoning Ordinance Chapter 18, Section
lines. Spillover on north property line is permissible as abutting
4.17.4.b.1, spillover at the property line cannot exceed .5 fc into the
property zoned HC
public right-of-way. Please revise the proposal and plan accordingly.
Provide a luminaire schedule on a revised lighting plan (i.e., ensure
OK, done. Luminaire schedule on E3.01
that the schedule is on the same page as the photometric plan).
Provide the Maintenance Factor (LLF) as a category to the luminaire
OK, luminaire schedule on E3.01 has an LLF of 1.0 listed
schedule. Note that the LLF must equal 1.0 and that the photometric
calculations must reflect an LLF equal to 1.0.
Note that light levels in excess of 20 footcandles is generally not
Not done: values of 22.1 under drive -through canopy
accepted in the Entrance Corridor. Reduce the footcandle values in
excess of 20 fc.
Note that the height and scale of freestanding pole -mounted light
OK, E0.01 states that the mounting height "is measured from bottom
fixtures in the Entrance Corridor should not exceed 20 feet including
of fixture to finish grade" and that the height is 20'.
the base. The two new proposed poles are listed as 25 feet AFG.
Reduce this to 20 feet inclusive of the base.
Add the standard lighting note to the plan: Each outdoor luminaire
OK, note provided on E2.01 and E3.01
equipped with a lamp that emits 3, 000 or more initial lumens shall be
a full cutoff luminaire and shall be arranged or shielded to reflect
light away from adjoining residential districts and away from adjacent
roads. The spillover of lighting from luminaires onto public roads and
property in residential or rural areas zoning districts shall not exceed
one-halffootcandle.
Neither your ARB nor LOR applications mentioned the dumpster, and
OK, all provided
so I was confused about where this process lay. I believe I have my
bearings now. To include the location of the dumpster in this LOR,
you will need to further revise the site plan drawings to show and
label:
a. The dumpster (concrete) pad and dimensions
b. The dumpster's footprint and dimensions
c. A detail (elevation) of the dumpster enclosure as visible
from the Entrance Corridor (specify the material and
color, as well, please).
comments sent by email 2/26/19
1. There is a discrepancy between the quantity of HE listed in the luminaire schedule on E3.01 (6) and those shown on the plan on E3.01 (5) and a
discrepancy between the quantity of HK1 listed in the luminaire schedule on E3.01 (1) and those shown on the plan on E3.01 (2). Rectify.
2. The Kelvins or color temperatures for models HE 1 and HE2 are not specified in the catalog numbers provided in the luminaire schedule on
E3.01. All other lights are 40k; these should be the same. Specify.
3. Manufacturer's specifications were not provided for models HE 1 and HE2. Provide.
4. Eliminate C 1.00
5. If C1.01 is existing, it needs to show ALL existing landscaping and site features as the site exists today, 6113119; where is the proposed
demolition on C1.01?
6. Please revise C1.20 to show the shrubbery that is in their places; differentiate on the same plan what is existing as of today and what is proposed.
7. There is a discrepancy between the parking on the site as it exists today and what was approved. I have amended C 1.10 (see attached) and also
provided two of my photographs of the site (see IMG_4560 and _4572). The first is of the three parking spaces in the northeast corner of the
site, for which the approved plan shows four. Please delete this space and show this area as having three parking spaces and additional
landscaping area. Secondly, the parking on the west property line has been enlarged from 5 spaces to 7 spaces. Show these on the plan. Again,
this plan needs to show all of the site changes since it was approved in 1996 + proposed changes now.
8. There are two shrubs on the east property line, south of the three parking spaces in the NE corner; I do not believe they are hemlocks, and so this
needs to be revised on C 1.10.
9. The site has lost three canopy trees with the removal of the three crapemyrtles around the building. Please provide three shade trees in addition to
the hemlocks that you propose to replace.
10. please take detail 1 (Pole Base Detail) and the luminaire schedule from E0.01 and add them to E2.01;
11. Sheet E2.01 is still showing, on the illustration, models R1 through R3, yet these are not named in the luminaire schedule. If we have previously
decided that no alterations are happening to these fixtures and they are outside of the scope of work — and if they have been therefore been
removed from the luminaire schedule — remove them from the plan as well.