Loading...
HomeMy WebLinkAboutWPO200500016 Plan - Stormwater Stormwater Management Plan 2005-03-08General Construction Notes Site Development Data 1. The site is not near a watercourse or within a reservoir watershed. 2. The site is not within 100-year flood plain limits. 3. Meets and bounds taken from surveys by Huffman and Associates, Inic, and Thomas B. Lincoln Land Surveyor Inc. Elevations are based on survey by Thomas B. Lincoln Land Surveyor Inc. and USGS Datum. Benchmark is R.R. spike in power pole #33-14, elevation. 4. The location of existing utilities across the line of proposed work are not necessarily shown on the plans and where shown are only approximately correct. The contrractor shall on his own initiative locate all underground lines and structures before commencing work, He agrees to be fully responsible for any and all damages that might be occasioned by his failure to exactly locate and preserve any and all underground utilities. 5. The contractor shall be responsible for notifying "Miss Utility" (1-800-552-7001). 6. The acronym VDOT refers to the Virginia Department of Transportationi. 7. All materials and construction methods shall conform to current VDOT" Road and Bridge Specifications and Standards. 8. Erosion and siltation control measures shall be provided in accordancre with the approved erosion control plan and must be installed prior to any clearing, grading or other construction. 9. All slopes and disturbed areas are to be fertilized, seeded and mulchied. Maximum allowable fill or cut slope is 2:1, Where reasonably obtained, lesser slopes of 4:11 or better are to be achieved. 10, Paved or rip -rap lined ditch may be required to stabilized a drainagle channel ,Then, in the opinion of the Director of Engineering or his designee, it is deemed nectassary. 11. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices, latest edition. 12. All excavation for underground pipe installation must comply with OSMA Standards for the Construction Industry (29 CFR Part 1926). 13. Roadway Design: Rt. 742 8" #21A, 3" BM-25.0, 1.5" SM-9.5A Trovelways Surface Treatment: Prime and Double Seal 14, Runoff Control: Provided by detention basin and biofilter. 15. Erosion Control: As shown on E & S Plan. 16. Water: Albemarle County Service Authority; supply line on adjacent parcel 35Y; one meter will be installed for all the offices. 17. Sewer: Albemarle County Service Authority; manhole on parcel 35X 18. Refuse: Trash handling is the responsibility of each tenant. All trashy containers will be enclosed in the fenced in areas. 19. Zoning: LI for parcels 90-35, 35Y, 35V, and 35A-1 and R-1 for pcnrcel 90- 28 20. All signs will require separate permits under 4,15 of the zoning ordirnance. 21. The area with the slope greater than 25% is presently covered with vegetation and is not to be disturbed. A rip -rap ditch is proposed at the toe of the slope. 22. 450 ft. of sight distance is available at the proposed entrance on parcel 35Y. Parcels 35 and 35Y will share a common entrance. Existing entrances on both parcels 35 and 35Y will be closed. 23. This parcel will generate more than 350 vehicle trips per week. 24. Outdoor Lighting: Lighting on each building should not glare on adjacent parcels or the roadways (see light detail). Two exterior lights are proposed for each urnit in the rear of the parcel: one light beside the entrance door and one light in the center of the back wall. One exterior light is proposed on the back wall of the buildings along the front of the parcel. No luminaire at this site will emit greater than 3,000 initial lumens and all luminaries will be cutoff. The spillover of lighting from parking area luminaries onto public roads sand property in residential or rural areas zoning districts shall not exceed one-half (1/2) foot canldle. 25. Approval is subject to the issuance of a Certificate of Appropriateness from the ARB. 26. No off -site areas will be disturbed. 27. A 12-foot, full width lane will be added in front of parcel 35. 28. Prior to any construction within any public right-of-way, including cconnection to any existing roads, a permit shall be obtained from the Virginia Department of Transportation. This plan as drown may not accurately reflect the requirements; therefore the pernnit shall govern. 29. It sholl be the contractor's responsibility to check all dimensions, site conditions, final grading, and field layout on the project and report all inconsistencies to the engiineer, architect, surveyor, and owner. 30. All service utilities shall be placed underground. 31. All construction and materials shall comply with the state building code in effei:t at the time of construction. 32. All water and sewer appurtenances are to be located outside of roacdside ditches. 33. Valves on deadend lines shall be rodded to provide adequate restraint for the valve during a future extension of the line. 34. No grading is proposed at the site except to prepare each building location and in the placement of the utility lines. Most of the grading is the removal of existing stoc:<piles on the parcel. No grading or other earth disturbing activity (including trenching or tunneling), except as necessary for the construction of tree wells or tree walls, shaill occur within the drip line of any trees or wooded areas nor intrude upon any other existing features designated in the certificate of appropriateness for preservation. 35. No. of fixtures per unit: 1 Basin (Total = 16) 1 Toilet (Total = 16) 1 Water Fountain (Total = 16) 36. No variance is being requested but a special use permit is being applied for with the County. 37. No signs will be displayed on the exterior of the buildings. Each bwilding and lot will be numbered and have the number posted at the entrance to each unit. T'wo freestanding sign meeting County and ARB requirements will be displayed. One sign at the entrance ':o parcel 35 with the park's name. Sign Ht. = 12 ft. (Max.) Size of Sign = 32 s.f. (Max.) Size of Sign and Supports = 2.5 x 32 s.f. = 80 s.f. 38. All pervious areas of the site shall be permanently protected from soil erosion with grass or other ground cover or mulch material. 39. No construction activity including grading or clearing of vegetation shiall occur closer than 30 ft. to any residential or rural areas district. Screening shall be provided as regriired in section 32, 7. 9. 40. All buildings will be constructed with non-combustible materials. N SITE DATA: Tax Map 90 Parcel 35 Deed Book: 702 page 792 SETBACKS: 10 ft. (parking) - Front; 30 ft. adjacent to R-1 (Parcel 90-28) and public ROW 50 ft. (buildings) - Front; 50 fit. adjacent to R-1 (Parcel 90-28) and public ROW LOCATION: State Route 742 1885 Avon Street Extended Scottsville Magisterial District Albemarle County, Virginia OWNER and DEVELOPER: Duane Snow 905 Leigh Way Charlottesville, Va. 22901 EXISTING CONDITIONS: Woody, small undergrowth and small stockpiles. PROPOSED DEVELOPMENT and USE: Office buildings and storage yards. MAX. HT. OF BUILDINGS: 20ft. ZONING: LI and EC AREA: 8.167 acres (355,755 s.f.) LAND USE: EXISTING PROPOSED Buildings 0 s.f. 25,200 s.f. (77) Crushed Stone Areas 0 s.f. 62,259 s.f. 187 ) Impervious Trovelways 0 s.f. 31,953 s.f. 9%) Open 355,755 s.f. 100%) 236,343 s.f. 667 ) Total Site Area 355,755 s.f. �8.167 cc.) 355.755 s.f. �8.167 ac.) Total Parking and Vechicular Circulation Area Area Being Developed: 194,250 s.f.. (4.46 acresj,212 s.f. (2.16 cc.) Land Coverage Ratio (less than 0.5 x Lot Area = 177,878 s.f.) Floor Area Ratio 25,200 s.f. (less than 0.7 x Land Area = 249,029 s.f.) 25,200 s.f. Loading Spaces (Used to load any rollback truck) Required: 1 space per 8,000 s.f. of office space = 2 Provided: 2 spaces Canopy Cover Required: 10% of total site (10%)(355,755 S.F.) = 35,575 S.F. Provided: 42,619 s.f. of canopy (see below) Interior Parking Landscape 1 large or medium shade tree per 10 parking spaces = 64 parking spaces = 7 trees Required: (5%) (94,212 S.F.) = 4,711 S.F. Provided: 6,620 S.F. (SEE BELOW) Maximum number of employees: 6 per rental unit Average one employee per site; others off site working Parking: Required: 1 space per employee on site & 1 space per facility vehicle (Assume 1 employee on site and one facility vehicle); Total per site = 2 Provided: 2 spaces per unit,l handicap space per unit Total provided = 48 spaces plus 16 handicap spaces One handicap space per unit will be provided and will be constructed of 3,000 psi concrete at grade. INTERIOR LANDSCAPING (32.7.9.7(B)) CANOPY / TREE TOTAL 7 CHINESE ZELKOVA 490 S.F. 3,430 S.F. 24 BUFORD HOLLY 3 WHITE PINE 50 S.F. 150 S.F. 64 JUNIPTERS 8 WILLOW OAK 380 S.F. 3,040 S.F. 6,620 S.F. Lmer'gency -;pii Way Elev. 59i�9' `%' °✓! 8 ft. Wide (Bottom), 2:1 slope (sides' Level across Spillway Top of Dawn 3.1% Exit Slope (Max.) Elev. 591', 8 ft. Wide 2:1 Slope (max.) 3:1 Slope (max.) 3 Anti -seep Collars (3'-3" x 3 -3 ) Elev. 580.8' Outlet Protection (See Detail) VICINITY MAP NOT TO SCALE 70 ft 19, sop Et. CMP FIRE OFFICE COMMUNITY DEV. DEPT. ALBEMARLE CO. SERVICE AUTH. VA DEPT. TRANSP. HEALTH DEPT. Trash Rack 36 in. Dia. 13 in. High #6 Support Bars 16 g. Corrugated Metal 24 in. CMP Riser Revised pipe detail: Changed ffrom RCP to CMP. 02/16/2010 Elev. 589' 3:1 Slope (max.) !� Elev. 581.5' 9 ror�t 30 4" Non. -Perforated PVC Pipe 01% slope QQ' JV coo ete So. 18 c AjAe Bloo-k. �• �kie _ �f 15-in. CMP Barrel 4 ft. wide d(50) atone - 7 in. 17.5 ft, Wide Outlet Protection Detail (NTS) A� ON R SNOWS s s l OFZAGIJ YARD Plan a am=- Non of Blod aw CLAN sM TAX MAP 90 PARCEL 35 ZONED: LI SCOTTSVILLE MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA