HomeMy WebLinkAboutWPO200500055 Calculations Stormwater Management Plan 2005-07-12 . t. g.,
c79) 0
COP
2ioboRI- 70
�EPP
Stormwater Management �6'
Facility
White Gables
Albemarle County, Virginia
5 November 2003
Revised 17 November 2003
Revised 2 December 2003
Revised 10 December 2003 \.44-p,LTH O
Revised 7 January 2005 1 IL 4' cZ
Revised 2 May 2005 +
Revised 20 June 2005 : �' Robert B. McKee
r + lrc. No. 7783 •
•
J • Revised 12 July 2005 ,
' `f O `rsIONAL'005
A'IE:
* ; VIcKEE CARSON
t i NEERS ' LANDSCAPE ARCHITECTS ' PLANNERS
u,w I HIGH STREET • CHARLOTTESVILLE,VIRGINIA 22902
434.979.7522 tel 434.977.1194 fax
www.mckeecarson.com
RECEIVED
JUL 13 2005
COMMUNITY DEVELOPMENT
Introduction
This 7.1-acre site, located just west of Charlottesville on U.S. Route 250 (Ivy Road), is to be
developed as residential condominiums. At ultimate buildout, it is expected to consist of six
new pavilion buildings in addition to the existing historic structure. Phase 1 of the plan builds
the driveway and parking areas, much of the infrastructure, and two of the pavilions. Each
pavilion contains 10 condominium units. This site is within the designated Development Area
of Albemarle County and is not within a reservoir watershed.
Stormwater management at White Gables consists of water quality control measures as well as
runoff control facilities.
The site is divided by a drainage divide into two major drainage areas: the front, or south,
portion of the site,which drains toward Ivy Road and consists of approximately 2.5 acres; and
the rear (north) portion,which drains toward the C&O Railroad and encompasses
approximately 4.6 acres. Construction on the front portion will consist primarily of the
creation or relocation of a driveway and sidewalk. The existing building straddles the
drainage divide,while all new buildings will be located in the rear portion. All stormwater
management structures will be located in the rear portion of the site.
BMP Computations
Using the spreadsheet provided by the County of Albemarle, the BMP requirements have been
determined for the front and rear portions of the site separately. Please refer to the worksheets
and BMP Drainage Areas map in Appendix A. For the purpose of these computations,the
post-development watershed boundary is used for both pre- and post- development
conditions. This is done so that a direct comparison may be made of impervious areas for each
of the watersheds under study. The property boundary forms the remaining limits of each
computational area.
As indicated in Appendix A, the front portion of the site has a removal rate requirement
(%RR) of 18%, and a water quality volume (V) of 43.3 cubic yards;for the rear portion, a %RR
of 53% is indicated, with a V of 122.1 cubic yards. Pursuant to conversations with the Water
Resources Officer of the County of Albemarle,no BMP measures are proposed in the front
area. In the rear area, the site will be served at final build-out by one StormFilter vault and an
area of pervious pavement with a base of porous aggregate. Overflow from the StormFilter
vault is routed through an underground detention vault (see below for detention requirements
and computations).
StormFilters
One StormFilter vault with sixteen (16) filters is proposed as part of the overall BMP plan.
These filters are designed to remove pollutants after the water quality volume (WQV) has been
stored in the Stormtech system; accommodating the water quality volume from the drainage
area captured by the stormdrain system.
2
The filters accepts the runoff from the roofs of Pavilions I and III as well as the future Pavilion
V; it also includes a portion of the Pavilion I and III driveway, the entrance walkway to
Pavilion III, and a small part of the loop road. The filters also drain the front portions of the
roofs of future Pavilions II and IV, the rear of the existing manor house, and a portion of the
loop road as well as several scattered paved surfaces. Filter computations are included in
Appendix A.
Each subarea drains to a Stormgate flow splitter just upstream of the Stormtech storage
facility. The splitter allows the water quality volume for each subarea to be directed to the
Stormtech storage areas. For larger storms, after the water quality volume is handled,the
Stormtech system will be full and any additional flow will be handled by the detention facility
(described below).
Pervious Pavement
Pervious pavement is to be installed where indicated on the plans. The system is to consist of
a pervious surface over 4" of sand over filter fabric over 18" of#57 aggregate base. A 4"
perforated pipe will be installed in the top 6" of aggregate to handle any overflow, as
subsurface soil conditions preclude effective infiltration. Refer to detail E on Sheet 32 of the
plans.
Detention
In addition to the storage provided by the Stormtech system, and pervious pavement
aggregate base, an underground detention facility is proposed to limit the post-development
peak runoff rates.
As the stormwater management for this site is complex, some simplifying assumptions are
made for computation purposes. First, it is assumed that all offsite runoff is unaffected by this
development;no offsite areas are included in the computations. Second,the areas of pervious
pavement are assumed to have a runoff coefficient similar to that of lawn areas (CN=75);
however, the storage capacity of the void spaces under the pervious pavement is ignored (this
essentially treats the grasspaved areas as ordinary lawn). Third the, runoff from the front
portion of the site (see "BMP Computations" above) is not considered in these computations.
Finally, it is noted that while the site has multiple discharge locations (including sheet flow
runoff and pipe outfalls), these computations consider both the pre-and post-development
areas to have a single effective discharge point, which allows direct comparison between pre-
and post-development runoff condition; the longest runoff travel time is used to compute
rainfall intensity for the design storms. Refer to the drainage area map provided in Appendix
A ("BMP drainage areas") for a graphical depiction of the study area, including impervious
surfaces considered in the computations.
3
Although the area under consideration is small (less than 5 acres), the SCS Method is used to
compute pre- and post-development runoff. This is due to the complexity of the developed
site and limitations inherent within the Rational Method modeling software. Pursuant to
Albemarle County standards, the storms considered are the 2-, 10-and 100-year frequency
storms. The goal of the detention facility is to attenuate the runoff from the 2- and 10-year
storms to their pre-development levels or below, and to accommodate the runoff from the 100-
year storm so as to avoid property damage from flooding.
Pre-development Runoff
Pre-development runoff is calculated in Appendix B. Peak runoff rates are determined to be
10.48,20.66 and 34.18 cfs for the 2-, 10- and 100-year storm events,respectively.
Post-development Runoff
Post-development computations are included in Appendix B. These computations consider
the storage capacity of the StormFilters as described above, and a 42.7'x 38.8'x 7.21' deep
rectangular underground detention structure. The outlet configuration for the detention
structure consists of a 5.33'rectangular weir with a rectangular orifice for the 10-yr storm; a 8"
circular orifice at the base of the weir wall for the 2-yr storm; and a 24" diameter discharge
pipe. The outlet also passes the 100-yr storm as required. Given this configuration, and
taking into account the area by-passing the detention facility,the total runoff from the rear of
the site is computed to be 10.47 and 20.27 for the 2- and 10-year storm events,respectively.
These values are comparable to the runoff rates calculated in the approved December 2003
White Gables plan (Q2= 9.07 cfs and Qio= 20.67). No backwater is therefore expected to pond
on the surface or encroach upon the buildings.
Conclusion
The BMP facilities meet the requirements outlined above. The detention facility meets the
design goals.
4
_ __ _ _ - --
1 yytt,
LEGEND McKEECARSON
DRAINAGE AREA 1 DRAINAGE AREA 2 REMAINING DRAINAGE AREA I CONSUL LAND GLANPSHPE 4ENtiING ffEEPS
CiS
1.02 ac 113 AC BYPASSES STORMWATER SYSTEM
TO E2 INLET TO F2 INLET 301 East Hugh 3Yeelenedonesvlaa•VA 22902
w34 ww.]9-]522
.J .mcxaecerspuom
1
I McKae Carsonand Fetl 9prConc ptt,Lb.
reserves acommon law mMnp .n
\ \ pM
pronyu.uuee.m ga ay. .Mbeaa,
\1 \ V _ _ deeps awdaa deuik mbpanearetlre
\ 1 `` `` ' ' , pmpMOlYIXee Grsonend FeN Spwl
//`J Colicep4 Vd Resephmare nolb Ee
I 1111111.6.121111•—
I reproducedt WnOM wmpmdineMb�m
or
r nix entry lo
\\ I �-L__1J _—J,— —I- -- ..11111r �� assigned maM�nwlYmMOM'aster
4 _ Li aelamngw pewdsson end nonvm
I \ _ - a ern ne,uxee Carson orFeuSpan
d \\� I - 11 — '/// i - i Concepts Lid
p • I - .-_ I ��
•
, ,
, „/
I `�\ I-- I----� _ I I / IP
Pir
Imo.
i . Nirs........0 f Cn
p X ‘ IMP* .
I i .-. ,
mi • •
4.1
4
4* \‘‘`,
13, I , • .
t
erT ,, ,
`�
I41 \ ,
J
4 I I - k I I \ I \ \ Project No.: 0406
i _ ., III I,- Scale: 1"=50•
�'/ j I _._ I + ;I 111 I Date: 6/17/05
] 1 I _ --- I _ 0i' i%/ /1 Revised:
I 1—
1 I
/ I_—_r___Th_/f--J--- .- I I /
I it / / - I--.� _ L— —I^ _ J'---L_--
I I - _ .__-- 7 1' Sheet Nu.:
r l
ice\ I i. '' `
Of
Appendix A
BMP Computations
StormFilter Computations
Short Version BMP Computations ror Worksheets 2 - 6
Albemarle County Water Protection Ordinance: SCS
Plan: White Gables Water Resources Area: Development Area
Preparer: McKee Carson Date: 10/31/2003
Project Drainage Area Designation Rear of Site
L storm pollutant export in pounds, L= [P(Pj)Rv/12] [C(A)2.72]
Rv mean runoff coefficient, Rv=0.05+0.009(I)
Pj small storm correction factor,0.9
I percent imperviousness
P annual precipitation,43"in Albemarle
A project area in acres in subject drainage area, A= 4.60
C pollutant concentration, mg/I or ppm target phosphorus
f factor applied to RR
✓ required treatment volume in cy, 0.5"over imperv.area= A(1)43560(0.5/12)/27
RR required removal , L(post)-f x L(pre)
%RR removal efficiency, RR100/L(post)
Impervious Cover Computation (values in feet&square feet)
'Item,
Area post-development Area
Roads Length Width subtotal Length Width subtotal
0 0 0 0 0 0
0 0' 0 0 0 0
0 0 0 0
0 0 0 0
Driveways Length Width no. subtotal Length Width no. subtotal
and walks 0 0 0 3361 0 0 0 0
0 0 0 0 0 0 0 0
0 3361 0 21142
Parking Lots 1 2 3 4 1 2 3 4
0 0 0
Structures Area no. subtotal Area no. subtotal
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 66708
•
Actively-grazed pasture& Area Area
yards and cultivated turf 195218 x 0.08= 15617.44 112526 x 0.08= 9002.08
Active crop land Area Area
0x0.25= 0 x0.25= 0
Other Impervious Areas
1797 0
Impervious Cover 10% 48%
I(pre) I(post)
Rv(post) V
0.49 149.5
New Development(For Development Areas,existing impervious cover<=20%)
C f I (pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
0.70 :1.00 - 20% 0.23 6.50 13.70 7.20 53% Development Area
0.35 1'.00 :g% 0.14 2.02 6.85 4.82 70% Drinking Water Watersheds
0.40 Lao. 1% 0.14 2.31 7.83 5.51 70% Other Rural Land
min.values
Redevelopment(For Development Areas,existing impervious cover>20%)
C f I (pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
0.70 0.90 20% 0.23 6.50 13.70 7.85 57% Development Area
0.35 0.85 0% 0.14 2.02 6.85 5.13 75% Drinking Water Watersheds
0.40 0.85 1% 0.14 2.31 7.83 5.86 75% Other Rural Land
Interim Manual, Page 70 rev.31 March 1998 GEB
Short Version BMP Computations ror Worksheets 2 - 6
Albemarle County Water Protection Ordinance: SCS Method
Plan: White Gables Water Resources Area: Development Area
Preparer: McKee Carson Date: 3/9/2005
Project Drainage Area Designation Captured Rear of Site
L storm pollutant export in pounds, L=[P(Pj)Rv/12 j[C(A)2.72)
Rv mean runoff coefficient, Rv=0.05+0.009(1)
Pj small storm correction factor,0.9
I percent imperviousness
P annual precipitation,43"in Albemarle
A project area in acres in subject drainage area, A 2.42
C pollutant concentration, mg/I or ppm target phosphorus
f factor applied to RR
✓ required treatment volume in cy, 0.5"over imperv.area= A(I)43560(0.5/12)/27
RR required removal, L(post)-f x L(pre)
%RR removal efficiency, RR100/L(post)
Impervious Cover Computation(values in feet&square feet)
Item
pre-development Area post-development Area
Roads Length Width subtotal Length Width subtotal
0 0 0 0 0 6514
0 0 0 0 0 0
0 0 0 0
0 0 0 0 0 6514
Driveways Length Width no. subtotal Length Width no. subtotal
and walks 0 0 0 0 _ 0 0 0 3426
0 0 0 0 0 0 b 1590
0 0 0 0 0 0 5016
Parking Lots 1 2 3 4 1 2 3 4
0 0 0 0 0 0 0 0 0 0
Structures Area no. subtotal Area no. subtotal
0 0 2046 0 0 2046
0 0 0 0 0 52018
0 0 0 2046 0 66708
-Actively-grazed pasture& Area Area
yards and cultivated turf 92711 x 0.08= 7416.88 11122 x 0.08= 889.76
Active crop land Area Area
Ox0.25= 0 x0.25= 0
Other Impervious Areas
0 0
Impervious Cover 9% 75%
I(pre) l(post)
Rv(post) V
0.72 122.1
New Development(For Development Areas,existing impervious cover<=20%)
C f I (pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
- 0.70 , . 1.00 '.20% 0.23 3.42 10.78 7.36 68% Development Area
'0:35 i '1(00 0% 0.13 0.97 5.39 4.42 82% Drinking Water Watersheds
0.40 1.00 1% 0.13 1.11 6.16 5.05 82% Other Rural Land
*min.values
Redevelopment(For Development Areas,existing impervious cover>20%)
C f I (pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
0.70 0.90 20% 0.23 3.42 10.78 7.70 71% Development Area
0.35 0.85 0% 0.13 0.97 5.39 4.56 85% Drinking Water Watersheds
0.40 0.85 1% 0.13 1.11 6.16 5.22 85% Other Rural Land
Interim Manual, Page 70 rev.31 March 1998 GEB
_c;)
±.„
\A,
C.J
NN.
‘.0,1
7)-
‘ CI
\
\
Appendix B
Pre-Development Runoff Computations
Post-Development Runoff and Detention Computations
Job File: E: \PROJECT F1LES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\B'Y-PASS-V10-SCS.PPW
Pain Dir: E: \PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS'\
JOB TITLE
, d
Project Date: 4/28/2005 \14•` -'�
Project Engineer: Mike J% V
Project Title: White Gables:lby-pass
Project Comments:
•
S/N: D1YXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 10:56 AM 5/2/2005
J .
Table of Contents
i
***„****************** MASTER SUMMARY *********.*************
Watershed Master Network Summary 1.01
********************** CN CALCULATIONS *********************
SUBAREA 10 Runoff CN-Area 2.01
S/N: D1YXYWGWMIICC Mckee Carson
PondPack (10.00.016.00) 10:56 AM •
5/2/2005
Type. . . . Master Network Summary Page 1.01
Name. . . . Watershed
File. . . . E: \PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\by-pass-v10-scs.ppw
MASTER DESIGN STORM SUMMARY
Network Storm Collection: Albemarle County
Total
Depth Rainfall
Return Event in Type RNF ID
5 5.0000 Synthetic Curve Typell 24hr
100 8.5000 Synthetic Curve Typell 24hr
1 3.3000 Synthetic Curve Typell 24hr
2 4.0000 Synthetic Curve Typell 24hr
10 6.0000 Synthetic Curve Typell 24hr
MASTER NETWORK SUMMARY
SOS Unit Hydrograph Method
(*Node=Outfall; +Node=Diversion;)
(Trun= HYG Truncation: Blank-None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID Type Event ac-ft Trun hrs cfs ft ac-ft
*OUT 10 JCT 5 .693 12.0000 10.37
*OUT 10 JCT 100 1.478 12.0000 421.84f.
*OUT 10 JCT 1 .349 12.0500 5.25
*OUT 10 JOT 2 .486 12.0500 1\- al:,
*OUT 10 JCT 10 .910 12.0000 L1 3s
POND 10 IN POND 5 .693 12.0000 10.37
POND 10 IN POND 100 1.478 12.0000 21.84
POND 10 IN POND 1 .349 12.0500 5.25
POND 10 IN POND 2 .486 12.0500 7.31
POND 10 IN POND 10 .910 12.0000 13.61
POND 10 OUT POND 5 .693 12.0000 10.37
POND 10 OUT POND 100 1.478 12.0000 21.84
POND 10 OUT POND 1 .349 12.0500 5.25
POND 10 OUT POND 2 .486 12.0500 7.31
POND 10 OUT POND 10 .910 12.0000 13.61
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 10:56 AM 5/2/2005
Type. . . . Master Network Summary Page 1.02
Name. . . . Watershed
File. . . . E:\PP.OJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\by-pass-v10-scs.pp'W
MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
(*Node=Outfali; +Node=Diversion; )
Mfrun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID Type Event ac-ft Trun hrs cfs ft ac-ft
SUBAREA 10 AREA 5 .693 12.Q0.00 10.37
SUBAREA 10 AREA 100 1.478 12.0000 21.84
SUBAREA 10 AREA 1 .349 12.0500 5.25
SUBAREA 10 AREA 2 .486 12.0500 7.31
SUBAREA 10 AREA 10 .910 12.0000 13.61
S/N: D1YWYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 10:56 AM 5/2/2005
J .
Type Runoff CN-Area Page 2.01
Name SUBAREA 10
RUNOFF CURVE NUMBER DATA
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
pervious by-pass 74 2.380 74.00
impervious by-pass 98 .589 98.00
COMPOSITE AREA & WEIGHTED CN ---> 2.969 78.76 (79)
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 10:56 AM 5/2/2005
Job File: E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION;PRE:DEV.ELOPMENTtPPYI
Rain Dir: C:\HAESTAD\PPKW\RAINFALL\
JOB TITLE
Pre-development Computations ��L c I'c I?�r�` " '
White Gables
S/N: 021701D06A87 McKee Carson
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
Type. . . . Master Network Summary Page 1.01
Name. . . . Watershed
File. . . . E: \PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION`.PEE-DEVELOPMENT.PPW
MASTER DESIGN STORM SUMMARY
Default Network Design Storm File, ID ALBCO.RNQ Albemarle
Total
Depth Rainfall
Return Event in Type RNF File RNF ID
SC 1 3.3000 Synthetic Curve SCSTYPES TypelI 24hr
SC 2 4.0000 Synthetic Curve SCSTYPES Typell 24hr
SC 10 6.0000 Synthetic Curve SCSTYPES Typell 24hr
SC 100 8.5000 Synthetic Curve SCSTYPES Typell 24hr
MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
(*Node=Outfall; +Node=Diversion;)
(Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID Type Event ac-ft Trun min cfs ft ac-ft
*PRE-DEV RUNOFF JCT 1 .446 720.00 7.21
*PRE-DEV RUNOFF JCT 2 .639 720.00 ;44?B ,
*PRE-DEV RUNOFF JCT 10 1.258 720.00 �..,66
*PRE-DEV RUNOFF JCT 100 2.106 719.00 318
REAR AREA AREA 1 .446 720.00 7.21
REAR AREA AREA 2 .639 720.00 10.48
REAR AREA AREA 10 1.258 720.00 20.66
REAR AREA AREA 100 2.106 719.00 34.18
S/N: 021701D06A87 McKee Carson.:
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
•
Type. . . . Design Storms Page 2.01
Name. . . . Albemarle
File. . . . C:\HAESTAD\PPKW\RAINFALL\ALBCO.RNQ
Title. . . Pre-development Computations
White Gables
DESIGN STORMS SUMMARY
Design Storm File,ID = ALBCO.RNQ Albemarle
Storm Tag Name = SC 1
Description: Albemarle County 001 Year
Data Type, File, ID = Synthetic Storm SCSTYPES.RNF Typell 24hr
Storm Frequency = 1 yr
Total Rainfall Depth= 3.3000 in
Duration Multiplier = 1
Resulting Duration = 1440.00 min
Resulting Start Time= .00 min Step= 6.00 min End= 1440.00 min
Storm Tag Name = SC 2
Description: Albemarle County 002 Year
Data Type, File, ID = Synthetic Storm SCSTYPES.RNF Typell 24hr
Storm Frequency = 2 yr
Total Rainfall Depth= 4.0000 in
Duration Multiplier = 1
Resulting Duration = 1440.00 min
Resulting Start Time= .00 min Step= 6.00 min End= 1440.00 min
Storm Tag Name = SC 10
Description: Albemarle County 010 Year
Data Type, File, ID = Synthetic Storm SCSTYPES.RNF Typell 24hr
Storm Frequency = 10 yr
Total Rainfall Depth= 6.0000 in
Duration Multiplier = 1
Resulting Duration = 1440.00 min
Resulting Start Time= .00 min Step= 6.00 min End= 1440.00 min
Storm Tag Name = SC 100
Description: Albemarle County 100 Year
Data Type, File, ID = Synthetic Storm SCSTYPES.RNF Typell 24hr
Storm Frequency = 100 yr
'Total Rainfall Depth= 8.5000 in
Duration Multiplier = 1
Resulting Duration = 1440.00 min
Resulting Start Time= .00 min Step= 6.00 min End= 1440.00 min
S/N: 021701D06A87 McKee Carson
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
Type. . . . Tc Cabs Page 3.01
Name. . . . REAR AREA
File. . . . E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\PRE-DEVELOPMENT.PPW
TIME OF CONCENTRATION CALCULATOR
Segment #1: Tc: User Defined
Description: Time of conc. , sheet & SC flow
Segment #1 Time: 10.00 min
Total Tc: 10.00 min
S/N: 021701D06A87 McKee Carson—
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
Type. . . . Runoff CN-Area Page 4 .01
Name. . . . REAR AREA
File. . . . E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\PRE-DEVELOPMENT.PPW
RUNOFF CURVE NUMBER DATA
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
impervious 98 .120 98.00
HSG C lawn 74 4.480 74 .00
COMPOSITE AREA & WEIGHTED CN 4.600 74.63 (75)
S/N: 021701D06A87 McKee Carson'
PondPack Ver: 7.5 (765) Compute Time: 08:23 :06 Date: 12-02-2003
•
Type. . . . SCS Unit Hyd. Summary Page 5.04
Name. . . . REAR AREA Tag: SC 2 Event: 2 yr
File. . . . E:\PROJECT-FILES\0219-WHITE GAELES\0219 DESIGN\DETENTION\PRE-DEVELOPMENT.PPW
Storm. . . Typell 24hr Tag: SC 2
SCS UNIT HYDROGRAPH METHOD
STORM EVENT: 2 year storm
Duration - = 1440.00 min Rain Depth = 4 .0000 in
Rain Dir = C:\HAESTAD\PPKW\RAINFALL\
Rain File -ID = SCSTYPES.RNF - Typell 24hr
Unit Hyd Type = Default Curvilinear
HYG Dir = E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\
HYG File - ID = - REAR AREA SC 2
Tc = 10.00 min
Drainage Area = 4.600 acres Runoff CN= 75
Computational Time Increment = 1.333 min
Computed Peak Time = 720.00 min
Computed Peak Flow = 10.48 cfs
Time Increment for HYG File = 1.00 min
Peak Time, Interpolated Output = 720.00 min
Peak Flow, Interpolated Output = 10.48 cfs
DRAINAGE AREA
ID:REAR AREA
CN = 75
Area = 4.600 acres
S = 3.3333 in
0.29 = .6667 in
Cumulative Runoff
1.6667 in
.639 ac-ft
HYG Volume. . . .639 ac-ft (area under HYG curve)
***** UNIT HYDROGRAPH PARAMETERS *****
Time Concentration, Tc = 10.000 min (ID: REAR AREA)
Computational Incr, Tm = 1.333 min = 0.20000 Tp
Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb)
K = 483 .43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp) )
Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491)
Unit peak, qp = 31.27 cfs
Unit peak time Tp = 6.667 min
Unit receding limb, Tr = 26.667 min
•
Total unit time, Tb = 33.333 min
S/N: 021701D06A87 McKee Carson
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
Type. . . . SCS Unit Hyd. Summary Page 5. 05
Name. . . . REAR AREA Tag: SC 10 Event: 10 yr
File. . . . E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\PRE-DEVELOPMENT.PPW
Storm. . . Tyrrell 24hr Tag: SC 10
SCS UNIT HYDROGRAPH METHOD
STORM EVENT: 10 year storm
Duration = 1440.00 min Rain Depth = 6.0000 in
Rain Dir = C:\HAESTAD\PPKW\RAINFALL\
Rain File -ID = SCSTYPES.RNF - Typell 24hr
Unit Hyd Type = Default Curvilinear
HYG Dir = E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\
HYG File - ID = - REAR AREA SC 10
Tc = 10.00 min
Drainage Area = 4.600 acres Runoff CN= 75
Computational Time Increment = 1.333 min
Computed Peak Time = 720.00 min
Computed Peak Flow = 20.66 cfs
Time Increment for HYG File = 1.00 min
Peak Time, Interpolated Output = 720.00 min
Peak Flow, Interpolated Output = 20.66 cfs
DRAINAGE AREA
ID:REAR AREA
CN = 75
Area = 4.600 acres
S = 3.3333 in
0.2S = .6667 in
Cumulative Runoff
3.2821 in
1.258 ac-ft
HYG Volume. . . 1.258 ac-ft (area under HYG curve)
***** UNIT HYDROGRAPH PARAMETERS *****
Time Concentration, Tc = 10.000 min (ID: REAR AREA)
Computational Incr, Tm = 1.333 min = 0.20000 Tp
Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb)
K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp) )
Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491)
Unit peak, qp = 31.27 cfs
Unit peak time Tp = 6.667 min
Unit receding limb, Tr = 26.667 min
Total unit time, Tb = 33.333 min
S/N: 021701006A87 McKee Carson
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
Type. . . . SCS Unit Hyd. Summary Page 5.06
Name. . . . REAR AREA Tag: SC 100 Event: 100 yr
File. . . . E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\PP.E-DEVELOPMENT.PPW
Storm. . . Typell 24hr Tag: SC 100
SCS UNIT HYDROGRAPH METHOD
STORM EVENT: 100 year storm
Duration = 1440.00 min Rain Depth = 8.5000 in
Rain Dir = C:\HAESTAD\PPKW\RAINFALL\
Rain File -ID = SCSTYPES.RNF - Typell 24hr
Unit Hyd Type = Default Curvilinear
HYG Dir = E:\PROJECT-FILES\0219-WHITE GABLES\0219 DESIGN\DETENTION\
HYG File - ID = - REAR AREA SC 100
Tc = 10.00 min
Drainage Area = 4.600 acres Runoff. CN= 75
Computational Time Increment = 1.333 min
Computed Peak Time = 718.67 min
Computed Peak Flow = 34.21 cfs
Time Increment for HYG File = 1.00 min
Peak Time, Interpolated Output = 719.00 min
Peak Flow, Interpolated Output = 34.18 cfs
DRAINAGE AREA
ID:REAR AREA
CN = 75
Area = 4.600 acres
S = 3.3333 in
0.25 = .6667 in
Cumulative Runoff
5.4950 in
2.106 ac-ft
HYG Volume. . . 2.106 ac-ft (area under HYG curve)
***** UNIT HYDROGRAPH PARAMETERS *****
Time Concentration, Tc = 10.000 min (ID: REAR AREA)
Computational Incr, Tm = 1.333 min = 0.20000 Tp
Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb)
K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp))
Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491)
Unit peak, qp = 31.27 cfs
Unit peak time Tp = 6.667 min
Unit receding limb, Tr = 26.667 min
Total unit time, Tb = 33.333 min
S/N: 021701D06A87 McKee Carson
PondPack Ver: 7.5 (765) Compute Time: 08:23:06 Date: 12-02-2003
RainTank Calculator
Contact: Project Name:
Company: Location:
Phone:
Fax:
Step 1 Enter the required storage capacity in cubic feet. 11,000 cf
Volume of Tanks Required: 11,578.95 cf
Step 2 Using the buttons, select a depth from the table below. Remember that the deeper the system, the more
economic it becomes. Of course you'll typically want the bottom of the system to be above the water table
or hard-pan, keeping in mind you need 12" of cover above the system (24"for parking lots or roads).
Depth Options and
Corresponding Number of Tanks Required
Tank Style Depth Number of Tanks Required
O Single Tanks 1.48' 2,608
O Double Tanks 2.89' 1,333
O Triple Tanks 4.3' 896
O Quad Tanks 5.71' 675
0 Pent Tanks 7.12' 541
Step 3 Configure System Dimensions. Enter the length available on the site to install the system (in feet).
The worksheet will then show you the width and length in terms of total number of tanks, the footprint
of your system, and the footprint of the excavation, allowing a 2' perimeter to compact backfill.
Length available: 48 Feet
Number of units long: 19 Footprint: 42.70 Feet Long
Number of units wide: 29 38.81 Feet Wide
Tanks used in Excavatiion Footprint: 46.70 Feet Long
selected system: 551 42.81 Feet Wide
' Step 4 Check the box below if the RainTank is located below a parking lot or any area subject to traffic loads.
❑Yes,there will be traffic loads above the RainTank.
Step 5 Check the box below if you would like to include a liner in your system to allow you to harvest/recycle
water in the system for use in irrigating the landscaping.
❑Yes,I'd like to indude a liner in the system to recycle water.
Step 6 The next worksheet contains a list of all the materials you will need to build this system.
Please review this form. If you like, you can fill in unit costs for all items and determine an
estimate for the total system including installation.
ACF ACF Environmental
1-800-448-3636
sal es(ffiacfen v iron m ental.com
www.acfenvironmental.com
Job File: E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\0406 ROUTING.PPW
Rain Dir: E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\
JOB TITLE
Project Date: 4/27/2005
Project Engineer: Mike
Project Title: Watershed
Project Comments:
White Gables SWM design - System includes Raintank, Stormtech
SC-740's and StormFilters with Stormgate flow splitters. The
analysis is done using the SCS method.
SIN: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:45 PM 7/12/2005
Table of Contents
i
********************** MASTER SUMMARY **********************
Watershed Master Network Summary 1.01
*************** NETWORK SUMMARIES (DETAILED) ***************
Watershed 2
Executive Summary (Nodes) 2.01
****************** DESIGN STORMS SUMMARY *******************
•
Alb. Cnty. storm Design Storms 3.01
********************** CN CALCULATIONS *********************
PROP. CONDITIONS Runoff CN-Area 4.01
*********************** POND VOLUMES ***********************
POND 10 Vol: Elev-Area 5.01
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:45 PM 7/12/2005
Type. . . . Master Network Summary Page 1.01
Name. . . . Watershed
File. . . . E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\0406 Routing.ppw
MASTER DESIGN STORM SUMMARY
Network Storm Collection: Alb. Cnty. storm
Total
Depth Rainfall
Return Event in Type RNF ID
2 4.0000 Synthetic Curve Typell 24hr
10 6.0000 Synthetic Curve Typell 24hr
100 8.5000 Synthetic Curve Typell 24hr
MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
(*Node=Outfall; +Node=Diversion;)
(Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID Type Event ac-ft Trun hrs cfs ft ac-ft
*OUT 10 JCT 2 .512 12.1500 3.16
*OUT 10 JCT 10 .860 12.1500 6.66
*OUT 10 JCT 100 1.304 12.0500 18.62
POND 10 IN POND 2 .513 12.0000 8.15
POND 10 IN POND 10 .860 12.0000 13.28
POND 10 IN POND 100 1.304 12.0000 19.60
POND 10 OUT POND ` .512 12.1500 ''3 16 . 597..411 .147
liCiPOND 10 OUT POND papa .860 12.1500 i6 6 . 59 60 .231
D' 1
POND 10 OUT POND .304 12.0500 78 2 00:•39 : .261
PROP. CONDITIONS AREA 2 .513 12.0000 8.15
PROP. CONDITIONS AREA 10 .860 12.0000 13.28
PROP. CONDITIONS AREA 100 1.304 12.0000 19.60
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:45 PM 7/12/2005
Type. . . . Design Storms Page 3.01
Name. . . . Alb. Cnty. storm
File. . . . E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\0406 Routing.ppw
Title. . . Project Date: 4/27/2005
Project Engineer: Mike
Project Title: Watershed
Project Comments:
White Gables SWM design - System includes Raintank,
Stormtech SC-740's and StormFilters with Stormgate
flow splitters. The analysis is done using the SCS
method.
DESIGN STORMS SUMMARY
Design Storm File,ID = Alb. Cnty. storm
Storm Tag Name = 2
Data Type, File, ID = Synthetic Storm Typell 24hr
Storm Frequency = 2 yr
Total Rainfall Depth= 4.0000 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs
Storm Tag Name = 10
Data Type, File, ID = Synthetic Storm Typell 24hr
Storm Frequency = 10 yr
Total Rainfall Depth= 6.0000 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs
Storm Tag Name = 100
Data Type, File, ID = Synthetic Storm Typell 24hr
Storm Frequency = 100 yr
Total Rainfall Depth= 8.5000 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:45 PM 7/12/2005
Type. . . . Runoff CN-Area Page 4.01
Name. . . . PROP. CONDITIONS
File. . . . E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\0406 Routing.ppw
RUNOFF CURVE NUMBER DATA
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
Pervious 74 .810 74.00
Impervious 98 1.370 98.00
COMPOSITE AREA 6 WEIGHTED CN ---> 2.180 89.08 (89)
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:45 PM 7/12/2005
Type. . . . Vol: Elev-Area Page 5.01
Name. . . . POND 10
Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum
(ft) (sq.in) (acres) (acres) (ac-ft) (ac-ft)
593.54 .0380 .0000 .000 .000
600.66 .0380 .1141 .271 .271
POND VOLUME EQUATIONS
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt. (Areal*Area2) )
where: EL1, EL2 = Lower and upper elevations of the increment
Areal,Area2 = Areas computed for EL1, EL2, respectively
Volume = Incremental volume between EL1 and EL2
/d56 Z -5c.
ae ar 5
�7
it( Y`4Z,7 = /G .26 Mckee Carson
S/N: DIYXYWGWM4CC 7/12/2005
PondPack (10.00.016.00) 5:45 PM
Type. . . . Outlet Input Data Page 1.01
Name. . . . Outlet 5
File. . . . E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\0406 Routing.ppw
Title. . . Project Date: 4/27/2005
Project Engineer: Mike
Project Title: Watershed
Project Comments:
White Gables SWM design - System includes Raintank,
Stormtech SC-740's and StormFilters with Stormgate
flow splitters. The analysis is done using the SCS
method.
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 593.54 ft
Increment = .10 ft
Max. Elev.= 600.66 ft
OUTLET CONNECTIVITY
---> Forward Flow Only (Upstream to DnStream)
<--- Reverse Flow Only (DnStream to Upstream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall El, ft E2, ft
Orifice-Circular LF ---> TW 593.540 600.660
Orifice-Area 00 ---> TW 597.417 600.660
Weir-Rectangular WO ---> TW 599.600 600.660
TW SETUP, DS Channel
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:52 PM 7/12/2005
Type. . . . Outlet Input Data Page 1.02
Name. . . . Outlet 5
File. . . . E:\PROJECT FILES\0406-WHITE GABLES PHASE 1 CA\DESIGN CALCS\0406 Routing.ppw
Title. . . Project Date: 4/27/2005
Project Engineer: Mike
Project Title: Watershed
Project Comments:
White Gables SWM design - System includes Raintank,
Stormtech SC-740's and StormFilters with Stormgate
flow splitters. The analysis is done using the SCS
method.
OUTLET STRUCTURE INPUT DATA
Structure ID = LF
Structure Type = Orifice-Circular
# of Openings = 1
Invert Elev. = 593.54 ft
Diameter = .6667 ft
Orifice Coeff. _ .600
Structure ID = 00
Structure Type = Orifice-Area
# of Openings = 1
Invert Elev. = 597.42 ft
Area = .3333 sq.ft
Top of Orifice = 597.58 ft
Datum Elev. = 597.42 ft
Orifice Coeff. _ .667
Structure ID = WO
Structure Type = Weir-Rectangular
# of Openings = 1
Crest Elev. = 599.60 ft
Weir Length = 5.33 ft
Weir Coeff. = 3.000000
Weir TW effects (Use adjustment equation)
S/N: DIYXYWGWM4CC Mckee Carson
PondPack (10.00.016.00) 5:52 PM 7/12/2005