Loading...
HomeMy WebLinkAboutSDP201900021 Review Comments Initial Site Plan 2019-06-17 (2)County of Albemarle Department of Community Development Memorandum To: Andy Reitelbach From: Emily Cox Date: 14 June 2019 Subject: Flow Mazda/VW- ISP (SDP201900021) The initial site plan for Flow Mazda / VW has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO plan must be submitted and approved before final site plan can be approved. 2. Provide date of topographic survey. 3. Professional seal should be signed and dated. 4. Ensure all critical slopes are shown. Is the star hatch managed slopes? It is unclear. The steeps slopes overlay district requirements must be met in this area. 5. Engineered retaining wall design must be submitted before final site plan approval. 6. Provide top and bottom elevations of the retaining walls. 7. There appears to be some work off -site on the northern end of the property. Provide permission to work off site or clarify property lines. 8. There does not appear to be any loading or dumpster areas. Are these not needed? 9. Show the turn radius on all travelways. The radius on the NW side outside of the service area seems tight. 10. Label curbing of edges of pavement (CG-6, etc.) 11. If parking space is 9x18, the travelway must be 24'.