Loading...
HomeMy WebLinkAboutZMA201900010 ZMA Checklist 2019-06-17CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST for Conventional Rezoning of TMP 032AO-02-00-00200 on 06-03-2016 � Rezoning From R-15 Residential to R-15 Residential IRGI1�tP Project Name / Tax Map Parcel Number (CONVENTIONAL ZONING DISTRICTS - RA, VR, R-1, R-2, R-4, R-6, R-10, R-15, C-1 CO, HC, LI, HI, DCD) After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with the official application Required for Provided with application? Staff) application SECTION 33.4(c) (County (Applicant) X X YES NO x A narrative of the project proposal, including its public need or benefit; x A narrative of the proposed project's consistency with the comprehensive plan, v/ including the land use plan and the master plan for the applicable development area; x A narrative of the proposed project's impacts on public facilities and public infrastructure. x A narrative of the proposed project's impacts on environmental features. x A narrative of the proffers proposed to address impacts from the proposed project. x One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; x A conceptual plan showing, as applicable: x 1) the street network, including i circulation within the project and Ld connections to existing and proposed or planned streets within and outside of the project; x 2) typical cross -sections to show ❑ proportions, CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST 04/2013 Page 1 of 2 ❑ scale and ❑ streetscape/cross-sections/circulation; s N m �0 (-fay x - SeCfio�s x 3) the general loc tion of pedestrian and bicycle facilities; x 4) building envelopes; x /' 5) parking envelopes; x 6) public spaces amenities; �nd m x 7) areas to be designated as conservation and/or preservation areas; x 8) conceptual stormwater detention facility locations; x 9) conceptual grading; x Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. • Private Street Authorization Request —.per Section 14-234 (A) of the Subdivision Ordinance M- - Kt J\ • Request to Except or Vary requirements for double frontage lots — Per Section 14-203.1 (B) of the Subdivision Ordinance x A local traffic impact statement as required by Virginia Code § 15.2-2222.1 and 24 VAC 30-155-40. 1 A Please note: There are additional submittal requirements outlined on the official application for a Zoning Map Amendment. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. Signat re of person o ing this checklist T-T'I 1" Print Name Date 0.1- 27_�4_ -11SH40 Daytime phone number of Signatory CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST 04/2013 Page 2 of 2