Loading...
HomeMy WebLinkAboutWPO201900003 Checklist - Project Closeout 2019-06-19 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO# -1-91,61, 0 0003 PROJECT TITLE P( of (2/leer) PG '-e 1 FULL NAME OF ENGINEER: k( ( 0 [ FINAL ACTION DATE: 6P /R l q --------------------------------- CountyView —Limits of Disturbance Area(Ac)updated 1 ' 37C,, (,'Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top) Please check each item included in this folder.To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche.Please provide the digital location (path/name)of the document in the space provided. Apph anon(signature copy) - Scan El Saved location ApprZE&S Plan and/or SWM Plan and/or SWPPP(stamped"Approved") Scan El Saved location ❑ Approved Mitigation Plan(stamped"Approved") El Scan El Saved location El SWM Maintenance Agreement(executed and recorded) ❑ Scan El Saved location El SWM Deed/Easement Plat(recorded) ❑ Scan El Saved location ❑ Nutrient Credit Agreement El Scan ❑ Saved location calculations stamped"Approved" El Scan El Saved location ❑ Bond Estimate El Scan El Saved location (k) A t\ Ck El ACOE/ACSA/VDOT Approval Letter(s) El Scan ❑ Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved location El At the Engineer's discretion,copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. El Scan El Saved location ' NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the County Engineer for corrective action. Draft 08-10-2017